Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 | 9 June 2023 | Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 | Boric Acid Non-Destructive Examination Weld Overlay Probabilistic Risk Assessment Coatings Functionality Assessment Condition Adverse to Quality Aging Management Exemption Request Liquid penetrant Pressure Boundary Leakage Through Wall Leak Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld DM weld Grace period |
L-2012-323, Strainer Fiber Bypass Test Protocol | 10 August 2012 | Strainer Fiber Bypass Test Protocol | Grab sample Coatings |
ML043280324 | 22 November 2004 | ATC Operating Instruction Revision 1: Transmission Line Right-of-Way Forestry Specification | |
ML050880062 | 7 May 2004 | Licensee Procedure, HPIP 4.58, Issuance of Respiratory Equipment Revision 14 | |
ML051920220 | 21 April 2004 | Np 8.4.10 Exclusion of Foreign Material from Plant Components and Systems | Temporary Modification Zebra Mussel Foreign Material Exclusion |
ML050880070 | 19 March 2004 | Licensee Procedure HPIP 4.58 Issuance of Respiratory Equipment, Revision 13 | |
ML030630538 | 6 February 2003 | AFW Pump Normal Operation and Testing Pre-job Briefing Requirements | |
ML030790060 | 30 October 2002 | Temporary Change Review and Approval, OI 62B, Turbine-Driven Auxiliary Feedwater System (P-29) | High winds Design basis earthquake Earthquake |
ML030790082 | 30 October 2002 | Temporary Change Review and Approval, OI 62A, Rev 21, Motor-Driven Auxiliary Feedwater System (P-38A and P-38B | |
ML030870807 | 29 October 2002 | Temporary Change Review and Approval, ECA-0.0, Rev 31, Loss of All AC Power | |
ML030870802 | 24 October 2002 | Procedure Record and Field Copy Tracking, Procedure IT 10, Rev 45 | |
ML030870786 | 23 October 2002 | Procedure Record and Field Copy Tracking, Procedure IT 10, Rev 45 | |
ML030770710 | 6 October 2002 | Procedure IT 300B, Rev. 10, S/G B Mf Line Check Valves (Csd) Unit 1 | |
ML030770638 | 25 September 2002 | Temporary Change Review & Approval, OM 4.3.2, Eop/Aop Verification/Validation Process | |
ML030770620 | 25 September 2002 | Temporary Change Review & Approval OM 4.3.1, Rev. 5, AOP & EOP Writer'S Guide. | Boric Acid Offsite Dose Calculation Manual Probabilistic Risk Assessment Process Control Program |
ML030770397 | 16 September 2002 | OI 150, Rev. 1, Heating Condensate Storage Tanks. | |
ML030870700 | 3 June 2002 | Page 14 of Abnormal Operating Procedure AOP-5B, Revision 21, Loss of Instrument Air | |
ML030870690 | 16 May 2002 | Page 12 of Abnormal Operating Procedure AOP-10A, Revision 33, Safe Shutdown - Local Control | Safe Shutdown |
ML030730747 | 6 March 2002 | Plant Procedure Np 7.2.3, Engineering Change Requests, Revision 6 | Temporary Modification |
ML030730738 | 18 February 2002 | Pages 6 & 8 of Abnormal Operating Procedure AOP-1 0, Control Room Inaccessibility | |
ML030730736 | 18 February 2002 | Pages 1-18 of Abnormal Operating Procedure AOP-1 0, Control Room Inaccessibility | |
ML030870566 | 6 February 2002 | Temporary Change Review and Approval, IT 10, Temp Change No. 2002-0048 | Safe Shutdown High winds Fire Barrier Stroke time Earthquake |
ML030870559 | 6 February 2002 | Temporary Change Review and Approval, IT 10, Temp Change No. 2002-0047 | |
ML030730731 | 6 February 2002 | Temporary Change Review and Approval, IT 10, Rev 43, Temp Change No. 2002-0048 | Safe Shutdown High winds Fire Barrier Stroke time Earthquake |
ML050880061 | 6 February 2002 | Licensee Procedure HPIP 4.40 TEDE ALARA Evaluation, Revision 0 |