- 1 01150 HEATING THE CONDENSATE STORAGE TANKS DOCUMENT TYPE:
CLASSIFICATION:
REVISION:
EFFECTIVE DATE:
REVIEWER:
APPROVAL AUTHORITY:
PROCEDURE OWNER (title):
OWNE GROUP:
Verified Current opy:
List pages used for Partial Performance 1-7 1
221 Technical Safety Related 1
April 12,2001 Qualified Reviewer Department Manager Group Head Operations
?'
Time Controlling Work Document Numbers I
ature
POINT BEACH NUCLEAR PLANT 01150 OPERATING INSTRUCTIONS SAFETY RELATED Revision 1 HEATING THE CONDENSATE STORAGE TANKS April 12, 2001 INITIALS NOTE:
Due to Improved Technical Specifications (ITS) implementation, in order to allow use of this procedure prior to and after implementation, both the custom and improved Technical Specification information is shown, with the ITS information in Braces. Example: CTS info {ITS info}
1.0 PURPOSE This procedure provides instruction for filling the Condensate Storage Tank, T-24A or T-24B from the opposite units Condensate Feedwater System or Waste Condensate System to provide approximately 42,000 gallons of water at a temperature of 950F (80 OF to 110 OF) to fill the Steam Generator and Main Steam line.
2.0 PREREQUISITES The IT-300/305 transfer hose (rated at greater than 2000 psig) is available for use.
3.0 PRECAUTIONS AND LIMITATIONS 3.1 Do NOT allow CST temperature to exceed 120 Degrees F during the fill 0 ".with a final target temperature of approximately 110 degrees F.
3.2 Observe appropriate safety precautions when IT-300/305 transfer hose is pressurized. The temperature and pressure could be approximately 210'F and approximately 400 psig.
4.0 INITIAL CONDITIONS 4.1 Ensure greater than 13,000 gallons usable condensate volume in each CST if required by current plant conditions per CTS 15.3.4 {ITS 3.7.6).
4.2 Permission to Perform Evolution The conditions required by this evolution are consistent with required plant cond ions including equipment operability. Permission is granted to perform t s evolution.
Q"DS f
e Date
,,/
CONTINUOUS USE Page 2 of 21
POINT BEACH NUCLEAR PLANT OPERATING INSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 1 April 12, 2001 INITIALS 5.0 PROCEDURE NOTE:
If both Units are in Cold Shutdown {ITS MODE 5, 6, or defueled}then heat the CSTs using Waste Heating Returns per section 5.3 or 5.4 as applicable.
NOTE:
Approximately 42,000 gallons of water will be needed to fill the Steam Generator and Main Steam line. This will require multiple filling of the target CST.
NOTE:
Maintain a minimum of 13,000 gallons of water in the target CST to satisfy the on-line units technical specification for Auxiliary Feedwater source volume.
NOTE:
It will be necessary to perform this procedure more than once to fill the SG and MS line and maintain the minimum CST TS required level.
NOTE:
Each section of the procedure stands alone. Perform only the section(s) required.
5.1 Heat T-24A (South) CST to between 80 and 110 degrees F. using Unit 2 2A Feedwater Heater.
5.1.1 Record the As-Found position AND position the valves to the required position to Split the North and South CSTs.
Valve AF-2 T-24A Mini Recirc Isolation AF-9 T-24B CST Recirc isolation AF-3 T-24A Service Outlet AF-8 T-24B Service Outlet AF-5 T-24A CST Outlet To Aux Feed Pumps AF-6 T-24B CST Outlet To Aux Feed Pumps AF-7A T-24B CST Inlet From Water Treatment AF-4A T-24A CST Inlet From Water Treatment As Found
/4O Required OPEN SHUT OPEN OPEN OPEN SHUT b
OPEN to SHUT CONTINUOUS USE A4-Page 3 of 21
POINT BEACH NUCLEAR PLANT OPERATING INSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision I April 12, 2001 Install IT-300/305 transfer hose by:
- a. Connect one end of IT-300/305 transfer hose to 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN.
- b. Connect the other end of IT-300/305 transfer hose to AF-13, T-24A CST Drain.
CAUTION Feedwater outlet temperature is approximately 210 OF and approximately 400 psig. When the transfer hose between Unit 2 2A FW Heater and T-24A is used, AF-13 is to be opened before throttling open 2CS-107C and 2CS-107C is to be shut before shutting AF-13 to minimize the pressure on the transfer hose.
Hang Temporary Information tags containing the information in the Caution above on:
- a. AF-13, T-24A CST Drain.
Open AF-13, T-24A CST Drain.
NOTE:
2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN, may be throttled open or closed to vary fill or rate of temperature change.
NOTE:
Steps 5.1.5 and 5.1.6 or 5.1.7 may be performed concurrently.
Using the tool provided, throttle open 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN AND check hose for leaks.
CONTINUOUS USE 5.1.2 INITIALS t4--
5.1.3 5.1.4 5.1.5
[
INITIALS PI I
-4. U I
Page 4 of 21
POINT BEACH NUCLEAR PLANT OPERATING INSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 1 April 12, 2001 5.1.6 5.1.8 IF necessary to temporarily stop heating T-24A (South) CST water volume, THEN perform the following:
?*f' t
b.2 W, beating T-24A (South) CST water volume is to be restarted, THEN go to step 5.1.10.
5.1.9 WHEN T-24A (South) CST level is at the level desired by
- o\\
Shift Management, AND temperature is at 95 OF (80 OF-1 10 OF),
THEN shut 2CS-107C, HX-17A LP FWH 2A Outlet to HX-19A LP FWH 3A DRN. -
CONTINUOUS USE INITIALS IF it is desired to cool T-24A (South) CST water volume, AND there is sufficient level in the T-24B (North) CST, THEN perform the following:
(Otherwise mark this step as N/A)
- a. Throttle open AF-6, T-24B CST Outlet To Aux Feed Pumps, to sluice water from T-24B to T-24A.
- b. WHEN the CST water volume has cooled to 95 OF (80 OF-110 OF),
THEN Close AF-6, T-24B CST Outlet To Aux Feed Pumps.
IF it is desired to cool T-24A (South) CST water volume, AND there is NOT sufficient level in the T-24B (North) CST, THEN perform the following:
(Otherwise mark this step as N/A)
- a. Open AF-4A, T-24A CST Inlet From Water Treatment.
- b. WHEN the CST water volume has cooled to 95 OF (80 OF 110 OF),
THEN close AF-4A, T-24A CST Inlet From Water Treatment.
5.1.7 INITIALS P114-4 A-iýa ýý-
Page 5 of 21 fjllýff 4k ýV
POINT BEACH NUCLEAR PLANT OPERATING INSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 1 April 12, 2001 NOTE:
It maybe necessary to repeats steps that refill and reheat T-24A (South) CST as the Steam Generator(s) and Main Steam Line(s) are filled.
5.1.10 IF it is necessary to refill and reheat T-24A (South) CST, THEN repeat steps 5.1.5 through steps 5.1.9, AND document steps performed below.
(Mark step not performed N/A).
STEP NO.
1st 2nd PERFORMANCE PERFORMANCE 5.1.5 T0 5.1.6
,v/4 5.1.7 5.1.8 45 5.1.9 Af/
V-4 NOTE:
Perform the next three steps without delay in case 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN leaks by.
5.1.11 Using the tool provided, shut 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.
- AV___,
5.1.12 Shut AF-13, T-24A CST Drain.
5.1.13 Remove IT-300/305 transfer hose from AF-13, T-24A CST Drain AND route to a floor drain.
5.1.14 Cap AF-13, T-24A CST Drain.
5.1.15 Remove IT-300/305 transfer hose from 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN AND drain hose into floor drain.
5.1.16 Cap 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.
CONTINUOUS USE INITIALS INITIALS I
Page 6 of 21
POINT BEACH NUCLEAR PLANT OPERATING INSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 1 April 12, 2001 5.1.17 Remove the Temporary Information tags hung during step 5.1.3 on AF-13, T-24A CST Drain AND 2CS-107C, HX-17A LP FWH 2A Outlet To HX-19A LP FWH 3A DRN.
5.1.18 Allow the IT-300/305 transfer hose to cool to approximately ambient temperature while continuing with the balance of this section.
5.1.19 Place the following valves to the original as-found position recorded in step 5.1.1 or as directed by the DSS.
As-found
/DSS AF-9 T-24B CST Recirc Isolation AF-2 T-24A Mini Recirc Isolation AF-3 T-24A Service Outlet AF-8 T-24B Service Outlet LO Lo L-O AF-6 T-24B CST Outlet To Aux Feed Pumps L 0 AF-5 T-24A CST Outlet To Aux Feed Pumps L 0 AF-7A T-24B CST Inlet From Water Treatment 0
AF-4A T-24A CST Inlet From Water Treatment 0
5.1.20 Provide Independent Verification of the Redlocked valves listed below.
Valve AF-2 AF-9 AF-3 AF-8 AF-5 AF-6 Required T-24A Mini Recirc Isolation T-24B CST Recirc isolation T-24A Service Outlet T-24B Service Outlet T-24A CST Outlet To Aux Feed Pumps T-24B CST Outlet To Aux Feed Pumps INITIALS W/* iA A7c2 Z5 IV LO
CONTINUOUS USE I
INITIALS Page 7 of 21
POINT BEACH NUCLEAR PLANT OPERATING INSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 1 April 12, 2001 Rem arks
(,-
-30 0 b c e-/
let
',el
)
rc Performed By R I- " r" (
Performer (Print and Sign)
Performer (Print and Sign)
Performer (Print and Sign)
Performer (Print and Sign)
ReiwPerfoedr Sig J 'Prole into and Sign)
R ve e Bpb
'I Re4jwer (Print and Sign) (
D-a-e Timej Date Time
/i/7
/62/1 Date Time Date Time q* ('-au22.Jo Date Time Date Time Dt /Timeo Date Time Date Time CONTINUOUS USE Initials nit als Initials Initials Page 20 of 21
POINT BEACH NUCLEAR PLANT OPERATING INSTRUCTIONS HEATING THE CONDENSATE STORAGE TANKS 01150 SAFETY RELATED Revision 1 April 12, 2001
6.0 REFERENCES
6.1 Technical Specifications:
0 15.3.4, Steam and Power Conversion System.
{ ITS: 3.7.6 Condensate Storage Tank (CST)).
6.2 FSAR:
- Section 10.0, Steam and Power Conversion System.
6.3 P&IDs:
"* M-217, Sheet 1, Auxiliary Feedwater System.
"* M-202, Sheet 1, Condensate System.
"* M-2202, Sheet 1, Condensate System.
6.4 Tank Level Book:
"* Condensate Storage Tank (T-24 A/B).
"* Calculation - N97-155, PBNPIC-42.
6.5 OM 5.4.4 Control of Posted Plant Information CONTINUOUS USE I
Page 21 of 21