Category:Operating Procedures
MONTHYEARL-2023-075, Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-022023-06-0909 June 2023 Response to Request for Additional Information (RAI) Regarding Exemption Request, License Amendment Request and Revised Response in Support of a Risk-Informed Resolution of Generic Letter 2004-02 L-2012-323, Strainer Fiber Bypass Test Protocol2012-08-10010 August 2012 Strainer Fiber Bypass Test Protocol ML0432803242004-11-22022 November 2004 ATC Operating Instruction Revision 1: Transmission Line Right-of-Way Forestry Specification ML0508800622004-05-0707 May 2004 Licensee Procedure, HPIP 4.58, Issuance of Respiratory Equipment Revision 14 ML0519202202004-04-21021 April 2004 Np 8.4.10 Exclusion of Foreign Material from Plant Components and Systems ML0508800702004-03-19019 March 2004 Licensee Procedure HPIP 4.58 Issuance of Respiratory Equipment, Revision 13 ML0306305382003-02-0606 February 2003 AFW Pump Normal Operation and Testing Pre-job Briefing Requirements ML0307900602002-10-30030 October 2002 Temporary Change Review and Approval, OI 62B, Turbine-Driven Auxiliary Feedwater System (P-29) ML0307900822002-10-30030 October 2002 Temporary Change Review and Approval, OI 62A, Rev 21, Motor-Driven Auxiliary Feedwater System (P-38A and P-38B ML0308708072002-10-29029 October 2002 Temporary Change Review and Approval, ECA-0.0, Rev 31, Loss of All AC Power ML0308708022002-10-24024 October 2002 Procedure Record and Field Copy Tracking, Procedure IT 10, Rev 45 ML0308707862002-10-23023 October 2002 Procedure Record and Field Copy Tracking, Procedure IT 10, Rev 45 ML0307707102002-10-0606 October 2002 Procedure IT 300B, Rev. 10, S/G B Mf Line Check Valves (Csd) Unit 1 ML0307706382002-09-25025 September 2002 Temporary Change Review & Approval, OM 4.3.2, Eop/Aop Verification/Validation Process ML0307706202002-09-25025 September 2002 Temporary Change Review & Approval OM 4.3.1, Rev. 5, AOP & EOP Writer'S Guide. ML0307703972002-09-16016 September 2002 OI 150, Rev. 1, Heating Condensate Storage Tanks. ML0308707002002-06-0303 June 2002 Page 14 of Abnormal Operating Procedure AOP-5B, Revision 21, Loss of Instrument Air ML0308706902002-05-16016 May 2002 Page 12 of Abnormal Operating Procedure AOP-10A, Revision 33, Safe Shutdown - Local Control ML0307307472002-03-0606 March 2002 Plant Procedure Np 7.2.3, Engineering Change Requests, Revision 6 ML0307307382002-02-18018 February 2002 Pages 6 & 8 of Abnormal Operating Procedure AOP-1 0, Control Room Inaccessibility ML0307307362002-02-18018 February 2002 Pages 1-18 of Abnormal Operating Procedure AOP-1 0, Control Room Inaccessibility ML0308705662002-02-0606 February 2002 Temporary Change Review and Approval, IT 10, Temp Change No. 2002-0048 ML0308705592002-02-0606 February 2002 Temporary Change Review and Approval, IT 10, Temp Change No. 2002-0047 ML0307307312002-02-0606 February 2002 Temporary Change Review and Approval, IT 10, Rev 43, Temp Change No. 2002-0048 ML0508800612002-02-0606 February 2002 Licensee Procedure HPIP 4.40 TEDE ALARA Evaluation, Revision 0 2023-06-09
[Table view] |
Text
POINT BEACH NUCLEAR PLANT RenSAETY"RELATEDO ABNORMAL OPERATING PROCEDURE
.- Page 14 of 54-'-ý LOSS OF INSTRUMENT AIR RESPONSE NOT OBTAINED STEP ACTION/EXPECTED RESPONSE CAUTION will divert approximately 100 gpm which Gagging open AFW mini-recirc valves events.
could limit minimum flow for SGTR or,MSLB NOTES valves will provide a minimum 2
- Air back-up to air operated AFW mini-recirc Within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> the manual gag hours of operation for 1AF-4002. and 2AF-4002.
be used to provide minimum recirc on each AFW pump mini-recirc valve must flow.
AFW mini-recirc valves will provide a
- Nitrogen air back-up to air operated Within 90 minutes AF-4007 and AF-4014.
minimum 90 minutes of operation for valve must be used to provide the manual gag on each AFW pump mini-recirc minimum recirc flow.
IF*miiumr.i..tintwi LF minimum recirculation flow is 24 Check AFW Pump Mini-recirc Valves required. THEN perform the GAGGED OPEN following:
6 AF-4007 for P-38A
- Within 90 minutes, manually gag AF-4014 for P-38B each motor driven AFW pump 6
IAF-4002 for 1P-29 mini-recirc valve.
2AF-4002 for 2P-29
- Within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, manually gag each turbine driven AFW pump mini-recirc valve.