Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217C113 | 8 October 1999 | Amend 153 to License DPR-3,revising TS Section 6.0, Administrative Controls,By Deleting TS Section 6.2.2.f, Which Contains Limits on Working Hours of Plant Staff | |
ML20211J297 | 27 August 1999 | Amend 152 to License DPR-3,deleting License Condition 2.C(10) Which States: Licensee Shall Maintain FFD Program IAW Requirements of 10CFR26 | |
ML20207F922 | 5 March 1999 | Amend 151 to License DPR-3,revising Pol by Changing Submittal Interval for Radioactive Effluent Rept from Semiannual to Annual | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML20203G246 | 12 February 1999 | Errata to Amend 150 Issued to License DPR-3.Index Page Corrected | |
ML20202H581 | 3 February 1999 | Amend 150 to License DPR-3,revising Possession Only License Through Three Changes to TS | Process Control Program |
ML20249A789 | 17 June 1998 | Amend 149 to License DPR-3,revising TS Sections Re Min Water Cover Over Spent Fuel,Crane Travel Over Spent Fuel & Related Bases | |
ML20237F159 | 19 February 1998 | Amend 147 to License DPR-3,deleting Main Coolant Sys Water Chemistry Limits & Surveillance,Secondary Water Chemistry Monitoring Program & Requirements for Oxygen Monitoring of Waste Gas Holdup Sys | Process Control Program Power change |
ML20058C401 | 22 October 1990 | Amend 137 to License DPR-3,modifying Page 3/4 1-27, Surveillance Requirement 4.1.3.4.a,to Delete Ref to Control Rod Group a as Control Group | |
ML20059M056 | 26 September 1990 | Corrected Pages to Amend 136 to License DPR-3 | |
ML20059G237 | 6 September 1990 | Amend 135 to License DPR-3,modifying Tech Spec Surveillance Requirement 4.5.2a to Change ECCS Pump Surveillance Frequency from Monthly to Quarterly & to Remove Min Required Discharge Pressures from Tech Spec | |
ML20058L661 | 2 August 1990 | Amend 134 to License DPR-3,incorporating NRC Guidance in Generic Ltr 88-17 Into Facility Tech Specs & Adding Three New Tech Specs Specifying Plant Conditions & Equipment Operability Requirements to Prevent Core Uncovery | |
ML20058L028 | 2 August 1990 | Amend 133 to License DPR-3,incorporating Wording from Std Westinghouse Tech Specs Into Util Limiting Condition for Operation Specs 3.10.3 & 3.10.4 | |
ML20055C858 | 18 June 1990 | Amend 132 to License DPR-3,changing Title of Technical Svc Supervisor,Establishing New Positions Entitled Maint Support Supervisor & Operations Support Supervisor & Increasing Number of Senior Reactor Operators on Shift to Two | |
ML20247F123 | 7 September 1989 | Amend 124 to License DPR-3,moving Onsite & Facility Organizational Charts from Section 6.0 of Tech Specs to Section 401 of FSAR | |
ML20247E668 | 31 August 1989 | Amend 123 to License DPR-3,removing Description of High Pressurizer Water Level in Section 2 Re Bases of Tech Specs on Page B2-4 | Safe Shutdown |
ML20195D665 | 1 November 1988 | Amend 120 to License DPR-3,enabling Piping Mods Needed to Allow for Installation of Water Cleanup Sys | |
ML20205G166 | 25 October 1988 | Amend 119 to License DPR-3,permitting Increase in Nitrogen Pressure in Safety Injection Accumulator Tech Spec | |
ML20204G464 | 17 October 1988 | Amend 118 to License DPR-3,revising Tech Specs Re Specific Values of Boron Concentration | |
ML20205C396 | 14 October 1988 | Amend 117 to License DPR-3,changing Tech Specs by Adding Four Isolation Valves,In Two Spare Penetrations,To Table 3.6-1, Containment Barriers | |
ML20195C994 | 12 October 1988 | Corrected Page 2 to Amend 116 to License DPR-3 | |
ML20207L689 | 12 October 1988 | Amend 116 to License DPR-3,permitting Mods to nonsafety-class Portions of Neutron Shield Tank Cavity Leakage Collection Piping | Grab sample |
ML20207E810 | 5 August 1988 | Amend 115 to License DPR-03 Re Changes in Physical Security Plan | |
ML20151M486 | 29 July 1988 | Amend 114 to License DPR-3,making Battery Charger Surveillance Requirements in Tech Specs Same for All Three Battery Chargers | |
ML20151K369 | 25 July 1988 | Amend 113 to License DPR-3,revising Tech Specs to Permit Loads Greater than 900 Lbs to Travel Over Plant Fuel Pit to Enable Removal of Control Rods from Spent Fuel Pit | |
ML20151K853 | 19 July 1988 | Amend 112 to License DPR-3,revising Shutdown Margin Switching Temp to 470 F & Correcting Typo & Inadvertent Omission of Previously Approved Surveillance Requirement | Shutdown Margin |
ML20196K247 | 28 June 1988 | Amend 111 to License DPR-3,removing Requirement for Plant Operations Manager to Maintain Senior Reactor Operator License from Tech Specs | |
ML20195K140 | 17 June 1988 | Amend 110 to License DPR-3,revising Tech Specs Re Control Rod Position Indication & Correcting Minor Error in Tech Specs | Boric Acid Shutdown Margin |
ML20195C511 | 13 June 1988 | Amend 109 to License DPR-3,deleting Refs to Mode 5 in Tech Spec Tables 3.3-2 & 4.3-2 | |
ML20155K507 | 9 June 1988 | Amend 108 to License DPR-3,changing OL Expiration Date from 971104 to 000709 | |
ML20154J762 | 18 May 1988 | Amend 107 to License DPR-3,adding Surveillance Requirements to Tech Specs Re 480-volt Emergency Buses | |
ML20216J403 | 26 June 1987 | Amend 106 to License DPR-3,modifying Tech Spec Requirements on Min Number of Operable Neutron Detector Thimbles for Cycle 19 Operation | |
ML20213G911 | 13 May 1987 | Amend 105 to License DPR-3,revising Tech Spec Requirements for Surveillance Testing of Power Range & Intermediate Power Range Neutron Flux Channels | |
ML20213D951 | 7 May 1987 | Amend 104 to License DPR-3,revising Tech Specs Re Reporting Requirements on Reportable Events & on Primary Coolant Iodine Spiking | |
ML20211L356 | 17 February 1987 | Amend 103 to License DPR-3,revising Tech Specs Re Max Nominal Enrichment of Reload Fuel | |
ML20207N874 | 7 January 1987 | Amend 102 to License DPR-3,modifying Tech Specs Re RCS Vent Sys by Allowing Power to Be Removed from Valves During Normal Plant Operations | |
ML20207N416 | 6 January 1987 | Amend 101 to License DPR-3,changing Tech Specs to Increase Time Period That Valve CS-MOV-532 May Be Open from 30 Minutes/Wk to 120 Minutes/Wk | |
ML20214X332 | 1 December 1986 | Amend 100 to License DPR-3,revising Tech Spec Requirements Re Min Number of Operable in-core Neutron Detector Thimbles for Remainder of Cycle Xviii Operation | |
ML20210S174 | 23 September 1986 | Amend 99 to License DPR-3,modifying Portions of Radiological Effluent Tech Specs for Consistency W/Current NRC Guidance on Environ Monitoring | Annual Radiological Environmental Operating Report Fire Protection Program |
ML20212M844 | 20 August 1986 | Amend 98 to License DPR-3,modifying Tech Specs Re Required Date for Submittal of Supplemental Dose Assessment & Meteorological Summary Info | |
ML20215E283 | 11 July 1986 | Corrected Page to Tech Spec 3/4 6-11 Re Containment Barriers | |
ML20199K480 | 27 June 1986 | Errata to Amend 95 to License DPR-3,correcting Tech Spec Page 3/4 3-18 Re Radiation Monitoring Instrumentation | |
ML20206M718 | 17 June 1986 | Amend 97 to License DPR-3,modifying Tech Specs to Add Containment Isolation Valves for Containment Breathing Air Sys | |
ML20199L752 | 13 June 1986 | Corrected Tech Spec Pages to Amend 92 to License DPR-3 Re Main Coolant Sys,Eccs Subsystems & Vessel Fluence for Weld Metal | |
ML20199D534 | 9 June 1986 | Amend 96 to License DPR-3,modifying Tech Specs to Replace Manual Containment Isolation Valve W/Blank Flange | |
ML20211G679 | 5 June 1986 | Amend 95 to License DPR-3,modifying Tech Specs to Add Containment high-range Radiation,Pressure & Water Level Monitors & Core Exit & Reactor Vessel Head Thermocouples to Required Instrumentation List | Process Control Program |
ML20198S637 | 28 May 1986 | Amend 94 to License DPR-3,changing Tech Specs by Adding Containment Isolation Valves for Containment Breathing Air Sys | Safe Shutdown |
ML20198C336 | 14 May 1986 | Amend 92 to License DPR-3,changing Tech Specs Re Safety Injection Tank Solution Temp,Steam Generator Blowdown Monitors,Containment Isolation Boundary,Eccs Surveillance & Reactor Vessel Fluence | |
ML20141K319 | 15 January 1986 | Amend 91 to License DPR-3,deleting Tech Spec Requirements for Insp of Control Rod Shroud Tube Assemblies & Pressurizer Internals | |
ML20136B797 | 16 December 1985 | Amend 90 to License DPR-3, Modifying Tech Specs to Define Limiting Conditions for Operation & Surveillance Requirements to Limit ECCS Leakage to 50 Gallons Per Day | |
ML20137Z613 | 30 November 1985 | Amend 89 to License DPR-3,revising Tech Spec Surveillance Interval for Second Level (Degraded Grid Voltage) Undervoltage Protection |