Amend 124 to License DPR-3,moving Onsite & Facility Organizational Charts from Section 6.0 of Tech Specs to Section 401 of FSAR
ML20247F123
Person / Time
Site: Yankee Rowe
Issue date: 09/07/1989
From: Wessman R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20247F088 List:
References
NUDOCS 8909180086
Download: ML20247F123 (5)


Text

. . _ _ _

g 4  %, UNITED STATES

'8 y n NUCLEAR REGULATORY COMMISSION

[ g a wAsmNGTON, D. C. 20556 l

. . . . . ,e I

L i

f YANKEE-ATOMIC ELECTRIC COMPANY I

DOCKET NO.50-029 i

[ YANKEE NUCLEAR POWER STATION AMENDMENT TO FACILITY OPERATING L uENSE Amendment No. 124 License No. DPR-3

1. - The Nuclear Regulatory Commission (the Commission) has found that:

A. The application fer amendment by Yankee Atomic Electric Company -

(the licensee) dated March 11, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amend:nent can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and j E. The issuance of this amendment is in accordance with 10 CFR Part 51 l of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Facility Operating License No. DPR-3 is hereby amended to read as follows:

i j

)

j@93SSSI $$$h,$'

P

f.:c' ll l l

(2) Technical Specifications The Technical Specifications contained in Appendix.A as

. revised through Amendment No.124 , are hereby incorporated in the license. The licensee shall operate the' facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION ~

N Richard H. Wessman, Director Project Directorate I-3 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation:

Attachment:

Changes to the Technical Specifications Date of Issuance: September 7, 1989 PD OGC DIR/ l-3 o MBFa i e DWessman R/17/89 . $ /gi,/89 4///89 t 4' /89 0FFICIAL RECORD COPY

-A_TTACHMENT TO LICENSE AMENDMENT fl0. 124 FACILITY OFERATING LICENSE NO. DPR-3 L

DOCKET NO.50-029 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page. The revised page.is identified by the captioned amendment number and contains marginal lines indicating the area of change.

REMOVE INSERT 6-1 6-1 6-la 6-3 ---

6-4 ---

~

  • . 6.0 ADMfMISTRATTVE CONTROLS Administrative controls are the written rules, orders, instructions, procedures, policies, practices, and the designation of authorities and responsibilities by the management to obtain assurance or safety and quality of operation and maintenance of a nuclear power reactor. These controls shall be adhered to.

6.1 RESPONSIBILITY 6.1.1 The Plant Superintendent shall be responsible for overall facility operation and shall delegate in writing the succession to this responsibility during his absence.

6.1.2 In all matters relating to the operation of the plant and to these Technical Specifications, the Plant Superintendent shall report to and be directly responsible to the Manager of Operations in the Yankee Atomic  !

Electric Company.

6.2 ORGANIZATION 6.2.1 Onsite and Offsite Organization i

An on# Ate and an offsite organization shall be established for plant operation The onsite and offsite orgs.nization shall include plandcorporatemanagement.

the positions for activities affecting the safety of the nuclear power plant.

t

a. Lines cf authority, responsibility and communication shall be established and defDied frow the highest management levels through intermediate levels to and including all operating organization positions. Those relationships shall be documented and updated, as appropriate, in the form of organizational charts. These organizational charts shall be j documented in the FSAR and updated in accordance with 10CFR50.71(e). '
b. A single corporate officer shall have overall responsibility for plant nuclear safety. This individual shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support in the plant so that continued nuclear safety is assured.
c. There shall be an icdividual management position in the ensite j organization having overall responsibility for safe operation of the '

plant; he/she shall have control over those onsite resources necessary for safg' operation and maintenance of the plant.

d. Althouhbtheindividualswhotraintheoperatingstaffandthosewho cartry out the quality assurance functions may report to the appropriate manager, they shall have sufficient organizational freedom to be independent from operating pressures.

YANKEE-ROWE 6-1 Amendment No. yf,' 124 l

I 1

Il

  • 6.0 ADMINISTRATIVE CONTROLS
e. Although radiation protection personnel may report to the appropriate manager onsite, for matters relating to radiological health and safety of employees and the public, the radiation protection manager shall have direct access to that onsite individual having overall responsibility for safe operation of the plant. Radiation protection personnel shall have the authority to cease any work activity when worker radiological safety is jeopardized or in the event of unnecessary personnel radiation exposures.

6.2.2 The Facility organization shall be subject to the following:

a. Each on duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2-1.
b. At least one licensed Operator shall be in the control room when fuel is in the reactor,
c. At least two licensed Operators shall be present in the control room during reactor start-up, scheduled reactor shutdown and during recovery from reactor trips.
d. An individual qualified in radiation protection procedures shall b%

on site when fuel is in the reactor. Operating crew personnel trained in radiation protection procedures fill this requirement.

YANKEE-ROWE 6-la Amendment No. 124 l