ML20205G166

From kanterella
Jump to navigation Jump to search
Amend 119 to License DPR-3,permitting Increase in Nitrogen Pressure in Safety Injection Accumulator Tech Spec
ML20205G166
Person / Time
Site: Yankee Rowe
Issue date: 10/25/1988
From: Wessman R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20205G121 List:
References
NUDOCS 8810280203
Download: ML20205G166 (5)


Text

e' .

pnnouq

,,,. fo, UNITED STA7 ES

n NUCLEAR REGULATOFor 00MMISSION g l wAssiNoTow, o. c. ross

% .... /

YANKEE ATOMIC ELECTRIC COMPANY ENKEENUCLEARPOWERSTATION DOCKET NO.50-029 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 119 License No. DPR-3

1. The Nuclear Regulatory Comission (the Comission) has found that:

A. The application for amendment by Yankee Atomic Electric Company (the licensee) dated June 27, 1988 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth

in 10 CFR Chapter I;
8. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C. There is reasonable assurance (1) that the activities autho ized by this amendment can be conducted without endangering the nealth and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D. The issuance of this amendinent will not be inimical to the comon defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.  ;
2. Accordingly, the license is amended by changes to the Technical Specification:, as indicated in the attachment to this license amendment and Paragraph 2.C.(2) of Fat:ility Operating License No. OPR-3 is hereby amended to read as folsows:

i 1

i i

GG10280203 68102'5 j PDR ADOCK 05000029 P PDC

2-r (2) Technical Specifications The Technical Specifications' contained in Appendix A as revised through Amendment No. 119, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY C0HNISSION Richard H. Wessman,' Director Project Directorate I-3 Division of Reactor Projects I/II

Attachment:

Changes to the Technical Specifications Date of Issuance: October 25, 1988 DFC :LA 3:DRPR:PM:PD13:DRPR: GC ' :D:PD13:DRPR :  :  :

. . . . . : .7 ....:....g,'4..:.... ............ ..............:........................

NAME : HW brook :HFai/ffId:ch:  : RWess  :  :  :

DATE : 10/d(88  : 10/13/88  : 1/ /88 a 10, /88  :  :  :

OFFICIAL RECORD COPY k *I

'f" M

i 2

(2) Technical Specifications The Technical Specifications contained in Appendix A as l

revised through Amendment No, ijo , are hereby incorporated l in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

5

3. This license anendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY CORIISSION J

IN W.MW A.

Richard H. Wessman, Director Project Directorate I-3 Division of Reactor Projects I/II

Attachment:

Changes to the Technical Specifications Date of Issuance: October 25, 1989,

ATTACHMENT TO LICENSE AMENDMENT N0.119 FACILITY OPERATING LICENSE NO. DPR-3 00CXET NO.50-029 t

i Revise Appendix A Technical Specifications Theby removing revised page theispage identified identified by below and inserting the enclosed page.

the captioned amendment number and contains marginal lines indicating the area of change.

INSERT j i REMOVE 3/4 5-1 3/4 5-1 4 t i

h r

t i

l l

4 4

]

)

i i

i I

i i

l

, . . j a

i  !

3 /4. 5 EMERGENCY CORE COOLING SYSTEMS (ECCS) ,

ACCUMULATOR _

l

!, LIMITING CONDITION F0R OPERATION 1

3.5.1 The low pressure safety injection accumulator shall be OPERABLE l with: .

1

a. Isolation valves SI-MOV-1 and S!-TV-608 open, j r

i b. A minimum useable contained borated water volume of 700 cubic feet of borated water, equivalent to an indicated level of  ;

t 261" in the accumulator. .

1

c. A minimum boron concentration of 2200 PPM,
d. An accumulator nitrogen cover-pressure of less than 15 d

psi 9, ,

e. Thenitrogensupplysystemwiththreesupplypressureregulatingl valves set at 488 25 psig and at least:

1 l I 1. Sixteen 48 cubic foot nitrogen bottles t 1390 psig, or  :

1

2. Seventeen 48 cubic foot nitrogen bottles 1 1340 psig, or i

{ I 1

2 3. Eighteen 48 cubic foot nitrogen bottles 1 1294 psig.

f. Two OPERABLE low level venting system, and i
g. Timers set to operate between ,11.85 + 0.23 seconds.

l, d I APPLICA81LITY: MODES 1, 2, 3* 4* and 5*.

l ACTION:

l  !

j

a. With tht accumulator inoperable, except as a result of a l
4 closed isolation valve or as a result of one inoperable l

pressure regulating valve or one inoperable low level venting ,

system, restore the inoperable accumula' tor to OPERA 8LE status l i l l

within 15 minutes or be in at least HOT SHUTDOWN with main coolant

  • pressure < 1000 psig within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. l
b. With the accumulator inoperable due to one isolation valve l

!' being closed, either insnediately open the isolation valve or i l* be in at least HOT STAN08Y within one hour and be in at Idast j HOT SHUTDOWN with main coolant pressure < 1000 psig .within the i

}  !

j next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

I j

v.ain coolant pressure i 1000 psig.

i YANKEE-ROWE 3/45-1 Amendment No. #, M,110 l

i

_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ - . a