Issue date | Title | Topic | |
---|---|---|---|
ML20203F143 | 10 February 1999 | Notice of Violation from Insp on 981125-990112.Violation Noted:On 981203,quality Control Inspector Failed to Implement Step 5.3(4) of GMP-INST-011,in That Individual Did Not Verify That Profile of Component Lead Was Visible | |
ML20236V697 | 28 July 1998 | Notice of Violation from Insp on 980429-0609.Violation Noted:On 980513,licensee Conducted Primary Containment Closeout Insp,Activity Affecting Quality & Failed to Verify That Drywell General Area Was Free of Trash & Tools | |
ML20236U491 | 30 June 1998 | Notice of Violation from Insp on 980505-06.Violations Noted: on 980412,licensee Maint Staff Failed to Adequately Document & Reroute Through Affected Departs for Review & Approval,Changes Made in Scope of Work to Listed Request | |
ML20248J447 | 29 May 1998 | Notice of Violation from Insp on 980318-0428.Violation Noted:On 980408,STP 42B012-CY,Prerequisite 6.4,was Not Properly Implemented | |
ML20247K323 | 12 May 1998 | Notice of Violations from Insp on 980413-0504.Violations Noted:On 980404,licensee Did Not Make Sure Surveys to Assure Compliance w/10CFR20.1902(b),which Describes Posting of High Radiation Areas | High Radiation Area |
ML20217L053 | 28 April 1998 | Notice of Violation from Insp on 980318-20.Violation Noted: on 980313,Operating Log Did Not Contain Entry for Restoration of Reactor Manual Control Sys to Service After Completion of Mods | |
ML20216G444 | 9 April 1998 | Notice of Violation from Insp on 980205-0317.Violation Noted:Between 980210 & 0306,licensee Failed to Follow Administrative Control Procedure 1408.9,Step 3.7(2) | |
ML20202G454 | 6 February 1998 | Notice of Violation from Insp on 971223-980204.Violations Noted:Between 960102 & 04,for Total of 58 Hours While Plant in Power Operating Conditions,Containment Isolation Valves CV5704B & CV5718B for Well Water Sys,Inoperable | |
IR 07100111/2012022 | 2 January 1998 | Notice of Violation from Insp on 971111-1222.Violation Noted:Nrc Identified on 971218,three Individuals Designated as Requiring Annual Respirator Fit Testing Overdue for Training | |
ML20202E921 | 2 December 1997 | Notice of Violation from Insp on 970928-1110.Violation Noted:From 970519-1029,inspectors Identified That on Ten Occasions Licensee Failed to Balance Mal at Least Once Per Calendar Day When Work in FME Zone | Foreign Material Exclusion |
ML20217C528 | 22 September 1997 | Notice of Violation from Insp on 970718-0821.Violation Noted:On 970806,inspectors Identified That Licensee Had Not Promptly Corrected Two Loose Emergency Diesel Generator Fuel Oil Pipe Supports,Per Emergency Operating Procedure | |
ML20216B087 | 2 September 1997 | Notice of Violation from Insp on 970324-0701.Violation Noted:As of 970425,C/As Taken in Response to Previous Violation Involving Procedure Deficiencies & Cited in Insp Rept 96005,had Not Been Adequate to Preclude Repetition | Nondestructive Examination |
ML20210R393 | 15 August 1997 | Notice of Violation from Insp on 970530-0717.Violation Noted:A Standby Diesel Generator Was Inadvertently Made Inoperable Due to Inadequate Procedure for Corrective Maint Activity | |
ML20151J683 | 24 July 1997 | Notice of Violation from Insp on 970518-0703.Violation Noted:Licensee Performed Turbine Stop Valve Testing in Abnormal Plant Configuration Without Written Safety Evaluation to Provide Basis That Test Did Not Involve USQ | |
ML20141D718 | 9 May 1997 | Notice of Violation from Insp on 970318-0425.Violation Noted:Surveillance Test Procedure Failed to Incorporate Acceptance Limits Contained in Applicable Design Documents | |
ML20137A358 | 11 March 1997 | Notice of Violation from Insp on 961220-970203.Violation Noted:From 961124-1218,w/reactor Power at Approx 100% Rated Power,Main Steam Line Radiation Monitors Were Set Greater than 3x Normal Rated Power Background | |
ML20136F643 | 6 March 1997 | Notice of Violation from Insp on 970210-14.Violation Noted: Licensee Personnel Failed to Inform Health Physics Personnel Prior to Opening Contaminated Sys | |
ML20134C890 | 29 January 1997 | Notice of Violation from Insp on 961025-1220.Violation Noted:On 961105,plant Operators Failed to Obtain Vibration Data as Required by Dcf.Dcf Not Incorporated Into STP | |
ML20134B791 | 23 January 1997 | Notice of Violation from Insp on 960907-1105.Violation Noted:W De-Ion Circuit Breakers Type Gm,Rev 1,was Not Appropriate for Circumstance | |
ML20059K481 | 19 January 1994 | Notice of Violation from Insp on 930824-1014.Violation Noted:Reactor Operating at Approx 75% Power B Sbdg Became Inoperable & Was Not Restored to Operable Status within 7 Days | |
ML20059K835 | 5 November 1993 | Notice of Violation from Insp on 930824-1014.Violation Noted:Licensee Failed to Maintain Adequate Cleanliness in Vicinity of Reactor Vessel,Evident by Tie Wraps & Wood Found in Reactor Cavity | |
ML20059G243 | 2 November 1993 | Notice of Violation from Insp on 930907-1001.Violation Noted:Conditions Adverse to Quality Were Not Promptly Corrected When Licensee Identified Inoperable Fire Barriers Between Control Room & Cable Spreading Room on 920929 | Fire Barrier |
ML20058P471 | 15 October 1993 | Notice of Violation from Insp on 920701-0831.Violation Noted:Licensee Determined That Records Required to Be Maintained by Commission Regulations or License Conditions Not Complete & Accurate in All Matl Respects | |
ML20057E478 | 1 October 1993 | Notice of Violation from Insp on 930809-13.Violation Noted: on 930728,two Individuals Entered Posted High Radiation Area in Torus Room W/O Being Provided Radiation Monitoring Device That Continuously Indicated Radiation Dose Rate in Area | High Radiation Area |
ML20211G004 | 18 February 1987 | Notice of Violation from Insp on 861202-05,09-12,15-18 & 870112-16 |