Text
C a
NOTICE OF VIOLATION-Iowa Electric and Power Docket No. 50-331 Company License No. DPR-49 Duane Arnold Energy Center During an NRC inspection conducted on July 1 through August 31, 1992, a violation of NRC requirements was identified.
In accordance with the
" General Statement of Policy and Procedures for NRC Enforcement Actions," the violation is listed below:
10 CFR 50.9, Completeness and accuracy of information, requires, in part, that information required by statute or by Commission regulations, orders, or license conditions to be maintained by the licensee shall be complete and accurate in all material respects.
Contrary to the above, the licensee determined that records required to be maintained by Commission regulations or license conditions were not complete and accurate in all material respects. Specifically, during the period of October 1991 through April 1992, numerous records were identified as being incomplete or inaccurate. These errors were material in that they evidenced thst checks had been made when they had not.
No response to this Notice of Violation is required.
Dated at Glen Ellyn, Illinois d
this If day of October, 1993 93102L0043 931015 PDR ADOCK 05000331