Issue date | Title | Topic | |
---|---|---|---|
ML20198C577 | 14 May 1986 | Transcript of 860514 Discussion/Possible Vote on Full Power OL for Catawba 2 in Washington,Dc.Pp 1-86.Viewgraphs Encl | Safe Shutdown Fire Barrier Hydrostatic Emergency Lighting Systematic Assessment of Licensee Performance Eddy Current Testing Overspeed trip |
ML20127P099 | 28 June 1985 | Transcript of 850628 Supplemental Oral Argument in Bethesda, Md.Pg 99-169 | Incorporated by reference |
ML20133C520 | 26 June 1985 | Undated Testimony of PM Reep Re Welding Inspector Concerns. Rept of Verbal Harassment Encl | Liquid penetrant |
ML20107L639 | 9 November 1984 | Proposed Transcript Corrections of 841009-12 Hearing Sessions.Requests Issuance of ASLB Order Directing That Evidentiary Record Be Amended to Incorporate Changes. Certificate of Svc Encl | |
ML20095G814 | 18 August 1984 | Testimony of Gw Hallman,Rp Muschick,Sr Ward,Ja Gorman, CA Wells,La Swanger,Sk Chen,Jo Barbour,Jm Curtis & Rc Gamberg Re Problems Encountered in Diesel Generator Qualification Program.Related Correspondence | Safe Shutdown Non-Destructive Examination Weld Overlay Nondestructive Examination Temporary Modification Stress corrosion cracking Eddy Current Testing Breakaway torque Liquid penetrant Overspeed trip |
ML20093N608 | 30 July 1984 | Errata to Transcript of 840501-0608 Emergency Planning Hearing,Correcting Matl Errors.Certificate of Svc Encl | |
ML20134P278 | 26 July 1984 | Transcript of Commission 840726 Closed Meeting in Washington,Dc Re Discussion of Investigations & Possible Enforcement Actions.Pp 44-52.Portions Deleted | Shutdown Margin Offsite Dose Calculation Manual Process Control Program Integrated leak rate test Control of Heavy Loads Fire Protection Program |
IA-84-665, Transcript of Commission 840726 Closed Meeting in Washington,Dc Re Discussion of Investigations & Possible Enforcement Actions.Pp 44-52.Portions Deleted | 26 July 1984 | Transcript of Commission 840726 Closed Meeting in Washington,Dc Re Discussion of Investigations & Possible Enforcement Actions.Pp 44-52.Portions Deleted | Shutdown Margin Offsite Dose Calculation Manual Process Control Program Integrated leak rate test Control of Heavy Loads Fire Protection Program |
ML20091G685 | 30 May 1984 | Revised Page 6 to Testimony of Eh Harris & Jt Pugh on Emergency Planning Contention 8 | |
ML20126D273 | 24 May 1984 | Transcript of 840524 Public Meeting in Washington,Dc Re Diesel Generator Insp Order.Pp 1-58.Supporting Documentation Encl | Safe Shutdown Unanalyzed Condition Reactor Vessel Water Level Grab sample Scram Discharge Volume Exemption Request Earthquake Fuel cladding Fire Watch Failure to Scram Water hammer |
ML20083Q571 | 16 April 1984 | Testimony of FEMA on Emergency Planning Contentions | Tone Alert Radio Siren Overexposure |
ML20083Q491 | 16 April 1984 | Prefiled Testimony of Jl Riley,R Twerry,Pl Rutledge, AB Andrews & RW Pittard on Emergency Planning Contentions. Certificate of Svc Encl.Related Correspondence | Fatality Siren |
ML20083N479 | 16 April 1984 | Testimony of SD Coleman,Me Bolch,Jt Pugh,Pr Lunsford,Be Phillips,Lw Broome & Ps Thomas Re Emergency Planning Contention 18.Related Correspondence | Siren |
ML20083N457 | 16 April 1984 | Testimony of RM Glover,Jt Pugh,Pr Lunsford,Wm Mcswain, Be Phillips,Lw Broome,Wm Kulash & Ps Thomas Re Emergency Planning Contentions 14 & 15.Related Correspondence | Tone Alert Radio Siren |
ML20083N431 | 16 April 1984 | Testimony of Rf Edmonds,Ma Casper,Rm Glover,Te Potter, Wm Kulash & Lw Broome Re Emergency Planning Contention 11. Related Correspondence | Probabilistic Risk Assessment Coatings Fatality Siren Exclusive Use |
ML20083N407 | 16 April 1984 | Testimony of RM Glover,Mr Bassiouni,Jt Pugh,Pr Lunsford, Wm Mcswain,Be Phillips,Lw Broome & Ps Thomas Re Emergency Planning Contention 9.Related Correspondence | Tone Alert Radio Siren |
ML20083N379 | 16 April 1984 | Testimony of SD Coleman,Jt Pugh,Eh Harris,Pr Lunsford, Wm Mcswain,Be Phillips,Lw Broome & Ps Thomas Re Emergency Planning Contention 8.Related Correspondence | Siren |
ML20083N361 | 16 April 1984 | Testimony of RM Glover,D Brown,Jt Pugh,Wm Mcswain,Be Phillips,Lw Broome & Ps Thomas Re Emergency Planning Contention 6.Related Correspondence | |
ML20083N342 | 16 April 1984 | Testimony of Je Neves,Jt Pugh,J Gregory,Pr Lunsford, Wm Mcswain,Be Phillips,Lw Broome,D Johnson & P Needham Re Emergency Planning Contention 3.Related Correspondence | |
ML20083N310 | 16 April 1984 | Testimony of RM Glover,Pf Carter,Ml Birch,Sv Duckworth, Jt Pugh,Pr Lunsford,Wm Mcswain,Sl Finklea,Be Phillips, Lw Broome & Ps Thomas Re Emergency Planning Contentions 1 & 7.Related Correspondence | Open House Siren |
ML20083N081 | 16 April 1984 | Testimony of T Urbanik Re Evacuation Time Estimate Studies | |
ML20083M108 | 16 April 1984 | Testimony of Sc Sholly on Emergency Planning Contention 11 Re Plume Exposure Pathway Zone.Certificate of Svc Encl. Related Correspondence | Probabilistic Risk Assessment Earthquake Fatality Siren |
ML20133K694 | 12 April 1984 | Transcript of Investigative Interview of Lr Davison on 840412 Re Allegations Raised During ASLB Hearings.Related Info Encl | |
ML20133K677 | 12 April 1984 | Transcript of Investigative Interview of CR Baldwin on 840412 Re Allegations That Arose During ASLB Hearings | |
ML20087N609 | 22 February 1984 | Testimony of Th Mullinax Re Langley Allegations Pertaining to Alleged Harassment of Welding Inspector.Related Info Encl | Affidavit |
ML20087N605 | 22 February 1984 | Testimony of L Harris Re Langley Allegation Concerning Prenotification of NRC Insp | |
ML20087N602 | 22 February 1984 | Testimony of RA Morgan Concerning Langley Allegation Re Prior Notification of NRC Insp | |
ML20087N599 | 22 February 1984 | Testimony of Dl Freeze Concerning Langley Allegation Re Prior Notification of NRC Insp | |
ML20087N594 | 22 February 1984 | Testimony of Lr Davison Re Langley Allegation of Prior Notification of NRC Insps | |
ML20087N588 | 22 February 1984 | Testimony of Lr Davison Re Langley Allegations Pertaining to Alleged Harassment of Welding Inspector L Harris | |
ML20087N582 | 22 February 1984 | Testimony of Je Cavender,We Rogers,Dh Llewellyn & Lr Barnes Re in Camera Witness Allegations Concerning Accuracy of Radiographs | |
ML20087N577 | 22 February 1984 | Testimony of WE Rogers,Lr Barnes,Lw Rudasill,Je Cavender, Aw Roy & Dh Llewellyn Concerning in Camera Witness Allegations Re Welding Matl | Nondestructive Examination Liquid penetrant |
ML20087N574 | 22 February 1984 | Testimony of WE Rogers,Lr Barnes,Lw Rudasill,Eg Mckenzie, Kr Webber,Jc Shropshire,Hr Barker,Dh Llewellyn & Jr Wilson Re in Camera Witness Allegations Concerning Foreman Override | |
ML20087N565 | 22 February 1984 | Testimony of Jm Mcconaghy,Lr Barner,Jp Akers,Je Cavender, Lw Rudasill,Jc Shropshire,Rp Ruth & Dh Llewellyn Re in Camera Witness Allegations Concerning Laminations | |
ML20080C687 | 3 February 1984 | Transcript of 840203 Telephone Conference in Washington,Dc. Pp 12,422-12,505 | Affidavit |
ML20079S460 | 30 January 1984 | Transcript of 840130 Hearing in Charlotte,Nc.Pp 11,922- 12,259 | |
ML20133C655 | 3 January 1984 | Limited Appearance Statement of Bp Garde Re Quality of Const at Plant | Hydrostatic Affidavit |
ML20082R457 | 8 December 1983 | Corrected Testimony of J Purvis on Behalf of Carolina Environ Study Group Re Meteorology.Affirmation of Svc Encl. Related Correspondence | High winds Siren Diurnal |
ML20082P837 | 2 December 1983 | Testimony of J Purvis Re Meteorology of Region | High winds Siren Diurnal |
ML20082N465 | 2 December 1983 | Testimony of Ma Casper Re Palmetto Alliance & Carolina Environ Study Group Contention 17.Certificate of Svc Encl. Related Correspondence | Diurnal |
ML20078P171 | 31 October 1983 | Testimony of DG Beam Re Instances of Conflict Between QC & Craft Personnel.Related Correspondence.Certificate of Svc Encl | Scaffolding |
ML20078P157 | 31 October 1983 | Testimony of Rl Dick Re Const Dept Involvement in Welding Inspector Concerns.Related Correspondence | |
ML20078P150 | 31 October 1983 | Testimony of Jc Rogers Re Welding Inspector Concerns. Related Correspondence | |
ML20085K851 | 17 October 1983 | Testimony of WO Henry Re Quality or Safety Concerns Expressed by Welding Inspectors.Certificate of Svc Encl. Related Correspondence | |
ML20085K833 | 17 October 1983 | Testimony of Wh Bradley Re Quality or Safety Concerns Expressed by Welding Inspectors.Related Correspondence | |
ML20080P129 | 4 October 1983 | Testimony of TR Mager & Ta Meyer Re Carolina Environ Study Group & Palmetto Alliance Contention 18/44.Ref Temp Will Not Exhibit More Rapid Increase than Calculations Show Due to Radiation Effects on Vessel.W/Certificate of Svc | Non-Destructive Examination Nondestructive Examination |
ML20078F967 | 3 October 1983 | Testimony of Jl Riley Re Contention 18 Concerning Unanticipated Rapid Embrittlement.Affirmation of Svc Encl. Related Correspondence | |
ML20133C505 | 24 September 1983 | Testimony of Lr Davison Re Welding Inspector Concerns | Non-Destructive Examination Coatings Preplanned Activity Liquid penetrant |
ML20133C491 | 23 September 1983 | Testimony of D Bentley Re Welding Inspector Concerns | |
ML20078B910 | 23 September 1983 | Testimony of WR Mcafee Supporting Palmetto Alliance Contention 6 Re Systematic QA Program Deficiencies Affecting Plant Integrity |