Diurnal means 24 hour cycle.
Topic |
|---|
|
|
| All by date | | | Start date | Site | Title |
|---|
| ML25336A003 | 1 December 2025 | Braidwood | Constellation Energy Generation, LLC - Braidwood - Revised Acceptance of Amendment to Incorporate Diurnal Curve | | ML25288A007 | 15 October 2025 | Crystal River | Enclosure 5 - Crystal River, Unit 3, 2025 Groundwater Characterization Report | | ML25279A096 | 6 October 2025 | Turkey Point | Updated Final Safety Analysis Report, Chapter 2, Site and Environment | | IR 05000456/2025010 | 4 September 2025 | Braidwood | Comprehensive Engineering Team Inspection (Ceti) Report 05000456/2025010 and 05000457/2025010 | | ML25280A139 | 11 July 2025 | 05000615 | Fws 2025-0079091, Final Biological Opinion for TVA Clinch River Nuclear Site in Roane County, Tennessee | | ML25178C715 | 7 July 2025 | 99902095 | Enclosure 1: Oklo, Inc. Report on Limited Scope Preapplication Readiness Assessment for Phase One of a Combined License Application | | ML25135A157 | 18 June 2025 | Braidwood | Issuance of Amendment Nos. 241 and 241 Re - Revision of Technical Specifications for the Ultimate Heat Sink | | ML25174A157 | 24 April 2025 | 07007033 | Gle to Fws, Request for Concurrence with Not Likely to Jeopardize Determination for Tricolored Bat | | ML25083A109 | 16 April 2025 | Braidwood | – Regulatory Audit in Support of Review of the Application to Incorporate a Diurnal Curve to Braidwood Station Technical Specifications 3.7.9 for the Ultimate Heat Sink | | ML25105A270 | 10 April 2025 | Monticello | Rev. 42 to the Updated Final Safety Analysis Report, Appendix G, Probable Maximum Flood |
|
|---|