 Issue dateTitleTopic
ML24012A04216 November 2023FAQ 23-03 Turkey Point IE01 Proposed NRC ResponsePower change
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)21 August 2023Inservice Inspection Program Owner'S Activity Report (OAR-1)Boric Acid
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications27 March 2023and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or ApplicationsFuel cladding
L-2022-038, Emergency Response Data System (Eros) Changes17 May 2022Emergency Response Data System (Eros) Changes
L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions16 September 2021Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment RevisionsSafe Shutdown
FLEX
L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification25 November 2019Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - NotificationHydrostatic
Moisture barrier
Biofouling
L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report6 August 201910 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
L-2018-173, Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program21 September 2018Notification of Request for Use and Approval of Polyacrylic Acid Pilot ProgramCoatings
L-2017-148, Special Report - Accident Monitoring Instrumentation11 August 2017Special Report - Accident Monitoring InstrumentationGrab sample
L-2017-123, Special Report - Standby Steam Generator Feedwater Pumps Inoperable29 June 2017Special Report - Standby Steam Generator Feedwater Pumps Inoperable
L-2017-124, Flooding Focused Evaluation Summary29 June 2017Flooding Focused Evaluation SummaryHigh winds
Internal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
Earthquake
L-2016-226, NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information20 December 2016NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard InformationHigh winds
Hydrostatic
FLEX
Fukushima Dai-Ichi
Earthquake
L-2016-058, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis23 March 2016Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis
ML16013A47222 January 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term TaskSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
L-2015-313, Special Report - Accident Monitoring Instrumentation18 December 2015Special Report - Accident Monitoring Instrumentation
L-2015-137, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments22 April 2015Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and ExperimentsSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Anticipated operational occurrence
Hydrostatic
Temporary Modification
Missed surveillance
Operability Determination
Exemption Request
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Grace period
Power change
Coast down
Unidentified leakage
Power Uprate
ML15054A03723 February 2015U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Fire PRA Facts and Observations for Turkey Point Nuclear Generating Stations, Units 3 and 4Safe Shutdown
Fire Barrier
Thermoset
ML14338A5554 December 2014NRC-2013-TN3079-NRC 2014 St. Lucie License RenewalAging Management
License Renewal
ML14338A5544 December 2014NRC-2013- TN2986-NRC 2014 St. LucieFukushima Dai-Ichi
L-2014-233, Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I)22 July 2014Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I)
L-2013-246, Steam Generator Tube Inspection Report19 September 2013Steam Generator Tube Inspection ReportNondestructive Examination
L-2013-258, 10 CFR 71.95 - Cask 8-120B - 60 Day Report16 September 201310 CFR 71.95 - Cask 8-120B - 60 Day Report
L-2013-237, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report20 August 2013CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report
L-2013-140, Special Report - Accident Monitoring Instrumentation19 April 2013Special Report - Accident Monitoring InstrumentationGrab sample
ML12234A75128 August 2012Closeout of Review of the One-Time Inspection of Class 1 Small Bore Piping Program Revised Commitment and Inspection PlanAging Management
L-2012-090, Special Report - Containment Tendon Corrosion Protection Medium Volume Reduction5 March 2012Special Report - Containment Tendon Corrosion Protection Medium Volume Reduction
L-2011-498, Units, 3 & 4 - 10 CFR 50.59 Summary Report of Changes, Tests and Experiments for Period Covering 12/04/2009 Through 05/16/2011 and Updated Technical Specification Bases16 November 2011Units, 3 & 4 - 10 CFR 50.59 Summary Report of Changes, Tests and Experiments for Period Covering 12/04/2009 Through 05/16/2011 and Updated Technical Specification BasesSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Hydrostatic
Temporary Modification
Missed surveillance
Operability Determination
Exemption Request
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Grace period
Power change
Coast down
Unidentified leakage
ML1122805019 September 2011Request to Initiate Informal Section 7 Consultation for the Proposed Turkey Point Plant Units 3 and 4 Extended Power Uprate (ME4907 and ME4908) EnclLicense Renewal
Power Uprate
ML1122802929 September 2011Request to Initiate Informal Section 7 Consultation for the Proposed Turkey Point Plant Units 3 and 4 Extended Power UprateLicense Renewal
Power Uprate
L-2011-213, Cycle 26 Startup Report28 July 2011Cycle 26 Startup ReportPower change
ML1119305874 March 2011Initial Exam Retake 2011-301 Final Administrative JPMsBoric Acid
High Radiation Area
Job Performance Measure
L-2010-115, 10 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 20094 June 201010 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 2009Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Hydrostatic
Coatings
Missed surveillance
Operability Determination
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Scaffolding
Grace period
Power change
Coast down
Unidentified leakage
Power Uprate
ML1019304176 May 2010Tritium Database ReportOffsite Dose Calculation Manual
Hydrostatic
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
ML15142A65019 June 2009Florida Department of Environmental Protection Conditions of Certification - PA 03-45D on Turkey Point Units 3, 4, and 5Incorporated by reference
Annual Radiological Environmental Operating Report
L-2008-160, Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.11 August 2008Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.Safe Shutdown
Boric Acid
Ultimate heat sink
Mission time
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Earthquake
Fuel cladding
Scaffolding
L-2007-129, Emergency Response Data System (ERDS) Maintenance20 August 2007Emergency Response Data System (ERDS) MaintenanceReactor Vessel Water Level
L-2007-095, CFR 50.59 Summary Report, Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering June 13, 2005 Through December 9, 20068 June 2007CFR 50.59 Summary Report, Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering June 13, 2005 Through December 9, 2006Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Hydrostatic
Missed surveillance
Operability Determination
Earthquake
Power-Operated Valves
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Grace period
Power change
Coast down
Unidentified leakage
L-2006-247, Core Operating Limits Report27 November 2006Core Operating Limits Report
L-2006-241, Significance Determination Regarding a Loss of Power to Operating Residual Heat Removal Pump - Additional Information Regarding Gothic Analysis17 October 2006Significance Determination Regarding a Loss of Power to Operating Residual Heat Removal Pump - Additional Information Regarding Gothic AnalysisSignificance Determination Process
Preliminary White Finding
GOTHIC
L-2006-180, Sation; St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Groundwater Questionnaire31 July 2006Sation; St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Groundwater QuestionnaireBoric Acid
Offsite Dose Calculation Manual
L-2006-131, Wastewater Permit Number FL0001562, Request for Minor Revision Notification22 May 2006Wastewater Permit Number FL0001562, Request for Minor Revision NotificationHydrostatic
ML0614301745 May 2006Biological Opinion Regarding the American Crocodile at Turkey PointHigh winds
Offsite Dose Calculation Manual
Aging Management
Annual Radioactive Effluent Release Report
License Renewal
L-2006-088, Core Operating Limits Report29 March 2006Core Operating Limits Report
ML07270084931 January 2005Caldon Experience in Nuclear Feedwater Flow MeasurementPower change
ML0503803945 March 2004E-mail from P. Fillion to C. Payne - Turkey Point Report InputSafe Shutdown
Boric Acid
Fire Barrier
ML0503803836 February 2004E-mail from P. Fillion to C. Payne, K. O'Donohue - Evaluation of Valves - RevisionSafe Shutdown
Grace period
ML0503803754 February 2004E-mail from P. Fillion to C. Payne, K. O'Donohue - Analysis of Two ValvesSafe Shutdown
Grace period
ML0504703639 September 20039/9/03 Turkey Point Condition Report 03-1330-1Hot Short
Safe Shutdown
Unanalyzed Condition
Boric Acid
L-2003-068, Order (EA-03-009) Relaxation Request, Examination Coverage of Reactor Pressure Vessel Head Penetration Nozzles - Supplemental Data14 March 2003Order (EA-03-009) Relaxation Request, Examination Coverage of Reactor Pressure Vessel Head Penetration Nozzles - Supplemental Data