ML24012A042 | 16 November 2023 | FAQ 23-03 Turkey Point IE01 Proposed NRC Response | Power change |
L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1) | 21 August 2023 | Inservice Inspection Program Owner'S Activity Report (OAR-1) | Boric Acid |
L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | 27 March 2023 | and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | Fuel cladding |
L-2022-038, Emergency Response Data System (Eros) Changes | 17 May 2022 | Emergency Response Data System (Eros) Changes | |
L-2021-182, Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions | 16 September 2021 | Summary of Commitment Revisions, Emergency Diesel Generator Fuel Oil Storage Tank Cleaning Inspection Commitment Revisions | Safe Shutdown FLEX |
L-2019-204, Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification | 25 November 2019 | Request for Use and Approval of Vapor Infusion Technology 90-Day Trial - Notification | Hydrostatic Moisture barrier Biofouling |
L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | 6 August 2019 | 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | |
L-2018-173, Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program | 21 September 2018 | Notification of Request for Use and Approval of Polyacrylic Acid Pilot Program | Coatings |
L-2017-148, Special Report - Accident Monitoring Instrumentation | 11 August 2017 | Special Report - Accident Monitoring Instrumentation | Grab sample |
L-2017-123, Special Report - Standby Steam Generator Feedwater Pumps Inoperable | 29 June 2017 | Special Report - Standby Steam Generator Feedwater Pumps Inoperable | |
L-2017-124, Flooding Focused Evaluation Summary | 29 June 2017 | Flooding Focused Evaluation Summary | High winds Internal Flooding Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation Earthquake |
L-2016-226, NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information | 20 December 2016 | NEI 12-06, Revision 2, Appendix G, G.4.2 Mitigating Strategies Assessment Flex Strategies Report for the New Flood Hazard Information | High winds Hydrostatic FLEX Fukushima Dai-Ichi Earthquake |
L-2016-058, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis | 23 March 2016 | Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis | |
ML16013A472 | 22 January 2016 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
L-2015-313, Special Report - Accident Monitoring Instrumentation | 18 December 2015 | Special Report - Accident Monitoring Instrumentation | |
L-2015-137, Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments | 22 April 2015 | Submittal of 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Anticipated operational occurrence Hydrostatic Temporary Modification Missed surveillance Operability Determination Exemption Request Earthquake Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Continuous fire watch Grace period Power change Coast down Unidentified leakage Power Uprate |
ML15054A037 | 23 February 2015 | U.S. Nuclear Regulatory Commission, Record of Review Dispositions to Fire PRA Facts and Observations for Turkey Point Nuclear Generating Stations, Units 3 and 4 | Safe Shutdown Fire Barrier Thermoset |
ML14338A555 | 4 December 2014 | NRC-2013-TN3079-NRC 2014 St. Lucie License Renewal | Aging Management License Renewal |
ML14338A554 | 4 December 2014 | NRC-2013- TN2986-NRC 2014 St. Lucie | Fukushima Dai-Ichi |
L-2014-233, Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I) | 22 July 2014 | Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-I) | |
L-2013-246, Steam Generator Tube Inspection Report | 19 September 2013 | Steam Generator Tube Inspection Report | Nondestructive Examination |
L-2013-258, 10 CFR 71.95 - Cask 8-120B - 60 Day Report | 16 September 2013 | 10 CFR 71.95 - Cask 8-120B - 60 Day Report | |
L-2013-237, CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report | 20 August 2013 | CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report | |
L-2013-140, Special Report - Accident Monitoring Instrumentation | 19 April 2013 | Special Report - Accident Monitoring Instrumentation | Grab sample |
ML12234A751 | 28 August 2012 | Closeout of Review of the One-Time Inspection of Class 1 Small Bore Piping Program Revised Commitment and Inspection Plan | Aging Management |
L-2012-090, Special Report - Containment Tendon Corrosion Protection Medium Volume Reduction | 5 March 2012 | Special Report - Containment Tendon Corrosion Protection Medium Volume Reduction | |
L-2011-498, Units, 3 & 4 - 10 CFR 50.59 Summary Report of Changes, Tests and Experiments for Period Covering 12/04/2009 Through 05/16/2011 and Updated Technical Specification Bases | 16 November 2011 | Units, 3 & 4 - 10 CFR 50.59 Summary Report of Changes, Tests and Experiments for Period Covering 12/04/2009 Through 05/16/2011 and Updated Technical Specification Bases | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Hydrostatic Temporary Modification Missed surveillance Operability Determination Exemption Request Earthquake Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Continuous fire watch Grace period Power change Coast down Unidentified leakage |
ML112280501 | 9 September 2011 | Request to Initiate Informal Section 7 Consultation for the Proposed Turkey Point Plant Units 3 and 4 Extended Power Uprate (ME4907 and ME4908) Encl | License Renewal Power Uprate |
ML112280292 | 9 September 2011 | Request to Initiate Informal Section 7 Consultation for the Proposed Turkey Point Plant Units 3 and 4 Extended Power Uprate | License Renewal Power Uprate |
L-2011-213, Cycle 26 Startup Report | 28 July 2011 | Cycle 26 Startup Report | Power change |
ML111930587 | 4 March 2011 | Initial Exam Retake 2011-301 Final Administrative JPMs | Boric Acid High Radiation Area Job Performance Measure |
L-2010-115, 10 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 2009 | 4 June 2010 | 10 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 2009 | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Hydrostatic Coatings Missed surveillance Operability Determination Earthquake Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Continuous fire watch Scaffolding Grace period Power change Coast down Unidentified leakage Power Uprate |
ML101930417 | 6 May 2010 | Tritium Database Report | Offsite Dose Calculation Manual Hydrostatic |
ML101270439 | 5 May 2010 | Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants | |
ML15142A650 | 19 June 2009 | Florida Department of Environmental Protection Conditions of Certification - PA 03-45D on Turkey Point Units 3, 4, and 5 | Incorporated by reference Annual Radiological Environmental Operating Report |
L-2008-160, Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. | 11 August 2008 | Updated Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. | Safe Shutdown Boric Acid Ultimate heat sink Mission time Safe Shutdown Earthquake Coatings Operating Basis Earthquake Earthquake Fuel cladding Scaffolding |
L-2007-129, Emergency Response Data System (ERDS) Maintenance | 20 August 2007 | Emergency Response Data System (ERDS) Maintenance | Reactor Vessel Water Level |
L-2007-095, CFR 50.59 Summary Report, Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering June 13, 2005 Through December 9, 2006 | 8 June 2007 | CFR 50.59 Summary Report, Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering June 13, 2005 Through December 9, 2006 | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Anticipated operational occurrence Hydrostatic Missed surveillance Operability Determination Earthquake Power-Operated Valves Power Operated Valves Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Continuous fire watch Grace period Power change Coast down Unidentified leakage |
L-2006-247, Core Operating Limits Report | 27 November 2006 | Core Operating Limits Report | |
L-2006-241, Significance Determination Regarding a Loss of Power to Operating Residual Heat Removal Pump - Additional Information Regarding Gothic Analysis | 17 October 2006 | Significance Determination Regarding a Loss of Power to Operating Residual Heat Removal Pump - Additional Information Regarding Gothic Analysis | Significance Determination Process Preliminary White Finding GOTHIC |
L-2006-180, Sation; St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Groundwater Questionnaire | 31 July 2006 | Sation; St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Groundwater Questionnaire | Boric Acid Offsite Dose Calculation Manual |
L-2006-131, Wastewater Permit Number FL0001562, Request for Minor Revision Notification | 22 May 2006 | Wastewater Permit Number FL0001562, Request for Minor Revision Notification | Hydrostatic |
ML061430174 | 5 May 2006 | Biological Opinion Regarding the American Crocodile at Turkey Point | High winds Offsite Dose Calculation Manual Aging Management Annual Radioactive Effluent Release Report License Renewal |
L-2006-088, Core Operating Limits Report | 29 March 2006 | Core Operating Limits Report | |
ML072700849 | 31 January 2005 | Caldon Experience in Nuclear Feedwater Flow Measurement | Power change |
ML050380394 | 5 March 2004 | E-mail from P. Fillion to C. Payne - Turkey Point Report Input | Safe Shutdown Boric Acid Fire Barrier |
ML050380383 | 6 February 2004 | E-mail from P. Fillion to C. Payne, K. O'Donohue - Evaluation of Valves - Revision | Safe Shutdown Grace period |
ML050380375 | 4 February 2004 | E-mail from P. Fillion to C. Payne, K. O'Donohue - Analysis of Two Valves | Safe Shutdown Grace period |
ML050470363 | 9 September 2003 | 9/9/03 Turkey Point Condition Report 03-1330-1 | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid |
L-2003-068, Order (EA-03-009) Relaxation Request, Examination Coverage of Reactor Pressure Vessel Head Penetration Nozzles - Supplemental Data | 14 March 2003 | Order (EA-03-009) Relaxation Request, Examination Coverage of Reactor Pressure Vessel Head Penetration Nozzles - Supplemental Data | |