Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23270B83626 September 2023Code Case N-752 Audit September 26, 2023, E-mail Providing Additional Information Regarding the Use of Owner'S Requirements and Engineering Judgment in Lieu of Code and StandardsNondestructive Examination
Aging Management
License Renewal
Operational leakage
ML19242C72828 August 2019Attachments 5 - 12: Thermal-Hydraulic Models for High Energy Line Break Transient Analysis, Duke Energy/Framatome Affidavits, Regulatory Requirements, Definitions, Time Critical Operator Actions and Feasibility Assessment for New Proposed TSafe Shutdown
Internal Flooding
Flow Accelerated Corrosion
Time Critical Operator Action
Through-Wall Leakage
Coast down
GOTHIC
Affidavit
RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.4630 May 2019Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46
ML17031A43126 January 2017Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events and FLEX Final Integrated PlanSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
GOTHIC
Unidentified leakage
ML16152A05231 May 2016ANP-3477NP, Rev. O, MRP-227-A Applicant/Licensee Action Item 6 AnalysisNon-Destructive Examination
Stress corrosion cracking
ONS-2016-017, Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2)15 February 2016Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2)Safe Shutdown
Unanalyzed Condition
Tornado Missile
Commercial Grade Dedication
Arc flash
Finite Element Analysis
Aging Management
Large early release frequency
Earthquake
ML15218A2976 August 2015Historic Temperature Data Including Record Highs for the Seneca
ML15201A00822 July 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ReviewSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML15161A42015 June 2015Review of the Spring 2014 Steam Generator Tube Inservice Inspection Report During Refueling Outage 27
ONS-2015-058, Engineering Report 555, Oconee, Units 1, 2, and 3 - Ul 1569 Impact and Crush Tests on Keowee Underground Trench Power Cables for Duke Energy Carolinas, Llc.27 March 2015Engineering Report 555, Oconee, Units 1, 2, and 3 - Ul 1569 Impact and Crush Tests on Keowee Underground Trench Power Cables for Duke Energy Carolinas, Llc.
ML15072A21725 February 2015Form OAR-1 Owners Activity Report (CC N-532-4) for Oconee Unit 1, Refueling Outage EOC 28Boric Acid
Hydrostatic
ONS-2014-161, Submittal of the Expedited Seismic Evaluation Process Report (CEUS Sites)19 December 2014Submittal of the Expedited Seismic Evaluation Process Report (CEUS Sites)Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
B.5.b
Fukushima Dai-Ichi
Earthquake
Power-Operated Valves
ML14218A80727 August 2014NRC Staff Review of the Documentation Provided by Duke Energy for the Oconee Nuclear Station Concerning Resolution of GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-WatCoatings
ONS-2014-074, Special Report Per Selected Licensee Commitment 16.9.9 Auxiliary Service Water (Asw) System and Main Steam Atmospheric Dump Valves and Oconee Transition from the Station Asw System to the Protected Service Water System15 August 2014Special Report Per Selected Licensee Commitment 16.9.9 Auxiliary Service Water (Asw) System and Main Steam Atmospheric Dump Valves and Oconee Transition from the Station Asw System to the Protected Service Water SystemSafe Shutdown
Shutdown Margin
B.5.b
ML14076A0002 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant AccidentSafe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
Seismic Walkdown Report
ONS-2014-040, 2013 Annual Commitment Change Report31 March 20142013 Annual Commitment Change ReportUnidentified leakage
ONS-2014-002, Special Report Per Technical Specification 5.6.6, Problem Investigation Process No. O-13-1444716 January 2014Special Report Per Technical Specification 5.6.6, Problem Investigation Process No. O-13-14447Post Accident Monitoring
ML13196A24811 July 2013Duke Energy Carolinas, LLC (Duke Energy): Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Evaluation Model
ML13190A0151 July 2013Aging Management Reviews for Newly Identified Systems, Structures and Components as of December 31, 2012Boric Acid
Aging Management
License Renewal
ML14058A04520 September 2012History of Oconee Flood ConcernsBackfit
ML12251A03110 September 2012Review of the Spring 2011 Steam Generator Tube Inservice Inspections During End of Cycle 26 Refueling Outage
ML12187A21531 March 2012Attachment 1, ANP-2951, Rev. 002, Inspection Plan for the Oconee Nuclear Station, Units 1, 2, and 3, Reactor Vessel Internals, Amp/Application to Implementation MRP-227-ASafe Shutdown
Unanalyzed Condition
Non-Destructive Examination
Nondestructive Examination
Functionality Assessment
Finite Element Analysis
Aging Management
Stress corrosion cracking
License Renewal
EVT-1
Liquid penetrant
Power Uprate
Measurement Uncertainty Recapture
ML11180A01123 June 2011Closure of 60-Day Interim Report Notification: Dubose National Energy Services, Inc
ML11082086531 March 2011Evaluation of 2010 (Cycle 24) Steam Generator (SG) Tube Inspections
ML11004040923 December 2010Draft, Regarding Review of Root Cause Analysis and Actions Addressing the Underground Pipe Damage to the Condensate Storage Tank Return LineCoatings
Operability Determination
ML10291048020 October 2010NRC Assessment of Oconee External Flooding Issue (October 18, 2010)Safe Shutdown
Significance Determination Process
ML10230016816 August 2010Units 1 & 2 - Supplement 2 to License Amendment Request for Duke Energy Cyber Security PlanCyber Security
Fuel cladding
Cyber attack
ML1018201847 July 2010Evaluation of 2009 (Cycle 24) Steam Generator Tube Inspections
ML10134068418 May 2010Audit Plan - Technical Adequacy of the Oconee Nuclear Plant'S License Amendment Request for the Transition to 10 CFR 50.48 (C)Probabilistic Risk Assessment
Fire Protection Program
ML1019304176 May 2010Tritium Database ReportOffsite Dose Calculation Manual
Hydrostatic
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
ML1019305458 February 2010Preliminary Report Oconee Nuclear Station
ML10201054220 April 2009Letter to Duke Energy from Cline, Site Characterization Report,Groundwater Protection Initiative, Oconee, Appendix E - Continued Through End
ML10201054120 April 2009Letter to Duke Energy from Cline, Site Characterization Report,Groundwater Protection Initiative, Oconee, Appendix E - Continued
ML10201054020 April 2009Letter to Duke Energy from Cline, Site Characterization Report,Groundwater Protection Initiative, Oconee, Appendix D Through Appendix E
ML10201053820 April 2009Letter to Duke Energy from Cline, Site Characterization Report,Groundwater Protection Initiative, Oconee, Cover Letter Through Appendix CGrab sample
Tritium
ML0834702469 December 2008Submittal of Auxiliary Service Water System Outage Report
ML08135023212 May 2008Summary Ultrasonic Examination Results of Completed Alloy 82/182 Weld Overlays Relief Request 07-ON-004Weld Overlay
ML08071015929 February 2008GL-04-002 Supplemental Response on Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water ReactorsBoric Acid
Ultimate heat sink
Mission time
Coatings
Finite Element Analysis
Design basis earthquake
Foreign Material Exclusion
Exemption Request
Earthquake
Fuel cladding
Scaffolding
Manual Operator Action
ML07353222613 December 2007Completion of Confirmatory Action Letter Requirements and Summary Ultrasonic Examination Results of Completed Alloy 82/182 Weld Overlays Relief Requests 07-ON-001 and 07-ON-004Weld Overlay
Dissimilar Metal Weld
ML07065042227 February 2007Fitness-For-Duty Program Performance Data Reports for Period July 1, 2006 Through December 31, 2006Fitness for Duty
ML07053007021 February 2007Emcb Review of the High Energy Line Break Mitigation Strategies for the Oconee Units as Proposed by Duke in a Letter Dated November 30, 2006Safe Shutdown
Mission time
Tornado Missile
TORMIS
ML07029032830 November 2006Tornado/Helb Mitigation Strategies and Regulatory CommitmentsSafe Shutdown
Shutdown Margin
Mission time
Tornado Missile
Probabilistic Risk Assessment
Operating Basis Earthquake
Tornado-Generated Missile
Tornado Missile Protection
TORMIS
Earthquake
Liquid penetrant
GOTHIC
Thermal fatigue
ML07129028313 November 2006DPO Panel Report-Memo to J. Dyer, NRR, from J. Grobe, Ades/Nrr, Subject: DPO Panel Response to DPO-2006-002Internal Flooding
ML07129025126 October 2006DPO Panel Report-Memo to J. Dyer, NRR, from J. Grobe, Ades/Nrr, Subject: DPO Panel Response to DPO-2006-003Internal Flooding
ML06249042728 August 2006Fitness-For Duty Program Performance Data Reports for Period Covering January 1, 2006 Through June 30, 2006Fitness for Duty
ML0711501942 June 2006June 2006 Monthly Report for DPO-2006-002,-003
ML06124044512 April 2006Future Oconee Tornado Mitigation StrategyTornado Missile
Enforcement Discretion
Tornado Missile Protection
TORMIS
ML0612404679 March 2006Tornado and High Energy Line Break Events Outside Containment - Supplemental InformationTORMIS
ML06060044923 February 2006EOC22 Refueling Outage, October-November 2005 Steam Generator Inservice Inspection 3 Month ReportEddy Current Testing