Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23325A14221 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
ML22011A29811 January 2022ANS Evaluation Report
CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L6 October 2021Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L
GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 202019 April 2021Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020
ML21083A13623 March 2021Completed Activities
ML21083A13822 March 2021Rulemaking
ML21083A14422 March 2021Strategy 6
ML21083A14322 March 2021Strategy 5
ML21083A14222 March 2021Strategy 4
ML21083A14122 March 2021Strategy 3
ML21083A14022 March 2021Strategy 2
ML21083A13922 March 2021Strategy 1
ML21083A13722 March 2021NEIMA Reporting
ML21014A26714 January 2021Preapplication Engagement to Optimize Application Reviews January 12 Version - CopyProbabilistic Risk Assessment
Exemption Request
ML21075A27522 December 2020FAQ 20-06 GGNS Scram - Final ApprovedTornado Missile Protection
Pandemic
Coronavirus
Power change
ML18123A3147 May 2018Staff Assessment of Flooding Focused Evaluation (CAC No. MF9897; EPID L-2017-JLD-0015)Hydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
ML18085A57926 March 2018Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System SignalsSafety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Temporary Modification
Incorporated by reference
Scram Discharge Volume
ML17290B13717 October 2017Recommendations for Future Inspection - Replacement Steam Dryer. with GE Hitachi Nuclear Energy Report 0000-0125-6316-R2-NP
GNRO-2017/00042, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package12 July 2017Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM PackageWeak link
GNRO-2017/00038, Focused Evaluation of External Flooding27 June 2017Focused Evaluation of External FloodingFLEX
Fukushima Dai-Ichi
Time Critical Operator Action
Flooding Focused Evaluation
GNRO-2016/00053, Mitigating Strategies Assessment (MSA) for Flooding Submittal30 December 2016Mitigating Strategies Assessment (MSA) for Flooding SubmittalUltimate heat sink
FLEX
Fukushima Dai-Ichi
GNRO-2016/00046, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 201623 August 2016Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 2016Cyber Security
TORMIS
ML15259A34224 August 201510 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al
GNRO-2014/00072, 2014 Report of Changes and Errors to 10CFR50.4612 November 20142014 Report of Changes and Errors to 10CFR50.46
GNRO-2014/00060, Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events26 August 2014Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsUltimate heat sink
FLEX
Tornado Generated Missile
Battery sizing
ML14232A73920 August 2014Report of 10CFR72.48 Evaluations - July 1, 2012 Through June 30, 2014
ML14098A1751 May 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
GNRO-2014/00027, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.31 March 2014Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML13217A05324 July 2013Summary of Root Cause Evaluation - Apparent Violation of 10CFR54.13 for Grand Gulf License RenewalAging Management
GNRO-2013/00020, Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report11 March 2013Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation ReportSafe Shutdown Earthquake
Operating Basis Earthquake
Fukushima Dai-Ichi
Frazil ice
Earthquake
GNRO-2012/00113, Vibration Data Report18 September 2012Vibration Data Report
GNRO-2012/00099, Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp21 August 2012Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp
ML12159A51511 June 2012Review of 60-Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Review of Fukushima Dai-ichi AccidentFukushima Dai-Ichi
Earthquake
ML12157A18123 May 2012Attachment 8 to GNRO-2012/00039 - from Diskette Labeled: Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment K Labeled Condition Reports.Condition Adverse to Quality
Annual Radioactive Effluent Release Report
Chernobyl
Tritium
ML12157A42623 May 2012Attachment 38 to GNRO-2012/00039 - Ensr. 2007, Impingement Mortality and Entrainment Characterization Study (Imecs), Entergy -Waterford 3. December 2007Zebra Mussel
ML12157A18323 May 2012Attachment 10 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment P Labeled Thermal Monitoring Procedural Protocols.
ML12157A24623 May 2012Attachment 22 to GNRO-2012/00039, Er Reference - Entergy 2010e (NPDES Crs)Grab sample
ML12157A25123 May 2012Attachment 27 to GNRO-2012/00039, Er Reference - GGNS 2007b (2006 Wmp Report) Grand Gulf Nuclear Station 2006 Waste Minimization Certified Report
ML11270006926 September 2011Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 PlantsShutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Channel-control blade interference
Scram Discharge Volume
Earthquake
ML11087125024 March 2011BWR Vessel and Internals Inspection Summaries for Spring 2010 OutagesWeld Overlay
VT-2
Earthquake
EVT-1
Dissimilar Metal Weld
DM weld
GNRO-2010/00058, Report of 10CFR50.59 Evaluations and Commitment Changes - July 1, 2009 Through June 30, 201017 August 2010Report of 10CFR50.59 Evaluations and Commitment Changes - July 1, 2009 Through June 30, 2010High Radiation Area
Anticipated operational occurrence
Fuel cladding
GNRO-2009/00036, Report of 10CFR50.59 Evaluations and Commitment Changes - April 1, 2008 Through June 30, 200916 July 2009Report of 10CFR50.59 Evaluations and Commitment Changes - April 1, 2008 Through June 30, 2009Safe Shutdown
Shutdown Margin
Ultimate heat sink
Stroke time
Probabilistic Risk Assessment
Condition Adverse to Quality
Foreign Material Exclusion
Feedwater Controller Failure
Fuel cladding
Fire Protection Program
Downpower
ML10190040630 April 2009GPI Data Review, Grand Gulf Nuclear Station
GNRO-2008/00052, Special Report 2008-001 - Violation of Certificate of Compliance 1014 Cask Load Limits for HI-STORM 100 System17 July 2008Special Report 2008-001 - Violation of Certificate of Compliance 1014 Cask Load Limits for HI-STORM 100 SystemFuel cladding
GNRO-2007/00068, Supplement 2 to Amendment Request Changes to the Condensate Storage Tank Level-Low Setpoints21 September 2007Supplement 2 to Amendment Request Changes to the Condensate Storage Tank Level-Low SetpointsOffsite Dose Calculation Manual
Stroke time
ML07232033530 May 2007GG-05-2007-FINAL Operating Exam, Operations Training, Determine Shift Staffing to Meet Shift RequirementsSafe Shutdown
High Radiation Area
Half scram
Squib
Job Performance Measure
Scram Discharge Volume
Power change
CNRO-2006-00043, Request for Alternative GG-ISI-002, Request to Use ASME Code Case N-71622 September 2006Request for Alternative GG-ISI-002, Request to Use ASME Code Case N-716Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Large early release frequency
Scaffolding
CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee13 July 2006Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont YankeeMururoa
CNRO-2006-00023, Request for Alternative CEP-PT-001 Visual Examination of Vent and Drain Connections During System Leakage Tests24 April 2006Request for Alternative CEP-PT-001 Visual Examination of Vent and Drain Connections During System Leakage TestsVT-2
ML0607204301 March 2006March 1, 2006 Public Meeting Slides for Proposed Generic Letter Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations.Hot Short
Safe Shutdown
Significance Determination Process
Thermoset
Exemption Request
Fire Protection Program
Backfit