Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23325A142 | 21 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML22011A298 | 11 January 2022 | ANS Evaluation Report | |
CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L | 6 October 2021 | Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L | |
GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 | 19 April 2021 | Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 | |
ML21083A136 | 23 March 2021 | Completed Activities | |
ML21083A138 | 22 March 2021 | Rulemaking | |
ML21083A144 | 22 March 2021 | Strategy 6 | |
ML21083A143 | 22 March 2021 | Strategy 5 | |
ML21083A142 | 22 March 2021 | Strategy 4 | |
ML21083A141 | 22 March 2021 | Strategy 3 | |
ML21083A140 | 22 March 2021 | Strategy 2 | |
ML21083A139 | 22 March 2021 | Strategy 1 | |
ML21083A137 | 22 March 2021 | NEIMA Reporting | |
ML21014A267 | 14 January 2021 | Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy | Probabilistic Risk Assessment Exemption Request |
ML21075A275 | 22 December 2020 | FAQ 20-06 GGNS Scram - Final Approved | Tornado Missile Protection Pandemic Coronavirus Power change |
ML18123A314 | 7 May 2018 | Staff Assessment of Flooding Focused Evaluation (CAC No. MF9897; EPID L-2017-JLD-0015) | Hydrostatic FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
ML18085A579 | 26 March 2018 | Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Temporary Modification Incorporated by reference Scram Discharge Volume |
ML17290B137 | 17 October 2017 | Recommendations for Future Inspection - Replacement Steam Dryer. with GE Hitachi Nuclear Energy Report 0000-0125-6316-R2-NP | |
GNRO-2017/00042, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package | 12 July 2017 | Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package | Weak link |
GNRO-2017/00038, Focused Evaluation of External Flooding | 27 June 2017 | Focused Evaluation of External Flooding | FLEX Fukushima Dai-Ichi Time Critical Operator Action Flooding Focused Evaluation |
GNRO-2016/00053, Mitigating Strategies Assessment (MSA) for Flooding Submittal | 30 December 2016 | Mitigating Strategies Assessment (MSA) for Flooding Submittal | Ultimate heat sink FLEX Fukushima Dai-Ichi |
GNRO-2016/00046, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 2016 | 23 August 2016 | Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 2016 | Cyber Security TORMIS |
ML15259A342 | 24 August 2015 | 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al | |
GNRO-2014/00072, 2014 Report of Changes and Errors to 10CFR50.46 | 12 November 2014 | 2014 Report of Changes and Errors to 10CFR50.46 | |
GNRO-2014/00060, Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 26 August 2014 | Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Ultimate heat sink FLEX Tornado Generated Missile Battery sizing |
ML14232A739 | 20 August 2014 | Report of 10CFR72.48 Evaluations - July 1, 2012 Through June 30, 2014 | |
ML14098A175 | 1 May 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
GNRO-2014/00027, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi. | 31 March 2014 | Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi. | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML13217A053 | 24 July 2013 | Summary of Root Cause Evaluation - Apparent Violation of 10CFR54.13 for Grand Gulf License Renewal | Aging Management |
GNRO-2013/00020, Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report | 11 March 2013 | Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report | Safe Shutdown Earthquake Operating Basis Earthquake Fukushima Dai-Ichi Frazil ice Earthquake |
GNRO-2012/00113, Vibration Data Report | 18 September 2012 | Vibration Data Report | |
GNRO-2012/00099, Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp | 21 August 2012 | Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp | |
ML12159A515 | 11 June 2012 | Review of 60-Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Review of Fukushima Dai-ichi Accident | Fukushima Dai-Ichi Earthquake |
ML12157A181 | 23 May 2012 | Attachment 8 to GNRO-2012/00039 - from Diskette Labeled: Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment K Labeled Condition Reports. | Condition Adverse to Quality Annual Radioactive Effluent Release Report Chernobyl Tritium |
ML12157A426 | 23 May 2012 | Attachment 38 to GNRO-2012/00039 - Ensr. 2007, Impingement Mortality and Entrainment Characterization Study (Imecs), Entergy -Waterford 3. December 2007 | Zebra Mussel |
ML12157A183 | 23 May 2012 | Attachment 10 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment P Labeled Thermal Monitoring Procedural Protocols. | |
ML12157A246 | 23 May 2012 | Attachment 22 to GNRO-2012/00039, Er Reference - Entergy 2010e (NPDES Crs) | Grab sample |
ML12157A251 | 23 May 2012 | Attachment 27 to GNRO-2012/00039, Er Reference - GGNS 2007b (2006 Wmp Report) Grand Gulf Nuclear Station 2006 Waste Minimization Certified Report | |
ML112700069 | 26 September 2011 | Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants | Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Channel-control blade interference Scram Discharge Volume Earthquake |
ML110871250 | 24 March 2011 | BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages | Weld Overlay VT-2 Earthquake EVT-1 Dissimilar Metal Weld DM weld |
GNRO-2010/00058, Report of 10CFR50.59 Evaluations and Commitment Changes - July 1, 2009 Through June 30, 2010 | 17 August 2010 | Report of 10CFR50.59 Evaluations and Commitment Changes - July 1, 2009 Through June 30, 2010 | High Radiation Area Anticipated operational occurrence Fuel cladding |
GNRO-2009/00036, Report of 10CFR50.59 Evaluations and Commitment Changes - April 1, 2008 Through June 30, 2009 | 16 July 2009 | Report of 10CFR50.59 Evaluations and Commitment Changes - April 1, 2008 Through June 30, 2009 | Safe Shutdown Shutdown Margin Ultimate heat sink Stroke time Probabilistic Risk Assessment Condition Adverse to Quality Foreign Material Exclusion Feedwater Controller Failure Fuel cladding Fire Protection Program Downpower |
ML101900406 | 30 April 2009 | GPI Data Review, Grand Gulf Nuclear Station | |
GNRO-2008/00052, Special Report 2008-001 - Violation of Certificate of Compliance 1014 Cask Load Limits for HI-STORM 100 System | 17 July 2008 | Special Report 2008-001 - Violation of Certificate of Compliance 1014 Cask Load Limits for HI-STORM 100 System | Fuel cladding |
GNRO-2007/00068, Supplement 2 to Amendment Request Changes to the Condensate Storage Tank Level-Low Setpoints | 21 September 2007 | Supplement 2 to Amendment Request Changes to the Condensate Storage Tank Level-Low Setpoints | Offsite Dose Calculation Manual Stroke time |
ML072320335 | 30 May 2007 | GG-05-2007-FINAL Operating Exam, Operations Training, Determine Shift Staffing to Meet Shift Requirements | Safe Shutdown High Radiation Area Half scram Squib Job Performance Measure Scram Discharge Volume Power change |
CNRO-2006-00043, Request for Alternative GG-ISI-002, Request to Use ASME Code Case N-716 | 22 September 2006 | Request for Alternative GG-ISI-002, Request to Use ASME Code Case N-716 | Internal Flooding Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency Scaffolding |
CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee | 13 July 2006 | Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee | Mururoa |
CNRO-2006-00023, Request for Alternative CEP-PT-001 Visual Examination of Vent and Drain Connections During System Leakage Tests | 24 April 2006 | Request for Alternative CEP-PT-001 Visual Examination of Vent and Drain Connections During System Leakage Tests | VT-2 |
ML060720430 | 1 March 2006 | March 1, 2006 Public Meeting Slides for Proposed Generic Letter Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations. | Hot Short Safe Shutdown Significance Determination Process Thermoset Exemption Request Fire Protection Program Backfit |