Category:Report
MONTHYEARML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML22011A2982022-01-11011 January 2022 ANS Evaluation Report CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L ML21272A3032021-09-30030 September 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise Report ML21237A0512021-08-25025 August 2021 Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water Reactors ML21081A1922021-06-30030 June 2021 Enclosure - USNRC-CNSC Joint Report Concerning X-Energy's Reactor Pressure Vessel Construction Code Assessment GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 ML21272A3382021-04-0101 April 2021 Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Versatile Test Reactor Ticap Tabletop Exercise Report ML21090A0332021-03-31031 March 2021 Historical Context and Perspective on Allowable Stresses and Design Parameters in ASME Section III, Division 5, Subsection Hb, Subpart B (ANL/AMD-21/1) ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy ML21075A2752020-12-22022 December 2020 FAQ 20-06 GGNS Scram - Final Approved ML18123A3142018-05-0707 May 2018 Staff Assessment of Flooding Focused Evaluation (CAC No. MF9897; EPID L-2017-JLD-0015) ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML17290B1372017-10-17017 October 2017 Recommendations for Future Inspection - Replacement Steam Dryer. with GE Hitachi Nuclear Energy Report 0000-0125-6316-R2-NP GNRO-2017/00042, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package2017-07-12012 July 2017 Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package GNRO-2017/00038, Focused Evaluation of External Flooding2017-06-27027 June 2017 Focused Evaluation of External Flooding GNRO-2016/00053, Mitigating Strategies Assessment (MSA) for Flooding Submittal2016-12-30030 December 2016 Mitigating Strategies Assessment (MSA) for Flooding Submittal GNRO-2016/00046, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 20162016-08-23023 August 2016 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 2016 GNRO-2016/00015, Non-Proprietary Version of MP Machinery and Testing, LLC (Mpm) Proprietary Report 814779, Revs 1 & 2, Neutron Transport Analysis for Grand Gulf Nuclear Station, Previously Included in Letters GNRO-2014/0080 and GNRO-2015/000112016-03-23023 March 2016 Non-Proprietary Version of MP Machinery and Testing, LLC (Mpm) Proprietary Report 814779, Revs 1 & 2, Neutron Transport Analysis for Grand Gulf Nuclear Station, Previously Included in Letters GNRO-2014/0080 and GNRO-2015/00011 ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al GNRO-2014/00072, 2014 Report of Changes and Errors to 10CFR50.462014-11-12012 November 2014 2014 Report of Changes and Errors to 10CFR50.46 GNRO-2014/00060, Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-26026 August 2014 Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML14232A7392014-08-20020 August 2014 Report of 10CFR72.48 Evaluations - July 1, 2012 Through June 30, 2014 ML14098A1752014-05-0101 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident GNRO-2014/00027, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.2014-03-31031 March 2014 Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi. ML14007A7182014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14042A2972014-02-12012 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Grand Gulf Nuclear Station, Unit 1, TAC No.: MF0954 ML13217A0532013-07-24024 July 2013 Summary of Root Cause Evaluation - Apparent Violation of 10CFR54.13 for Grand Gulf License Renewal GNRO-2013/00020, Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report2013-03-11011 March 2013 Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments GNRO-2012/00150, Final Report for Replacement Steam Dryer2012-12-0606 December 2012 Final Report for Replacement Steam Dryer GNRO-2012/00140, Unit No.1 - Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from ..2012-11-26026 November 2012 Unit No.1 - Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from .. GNRO-2012/00141, Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 151 of 345 Through Page 251 of 3452012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 151 of 345 Through Page 251 of 345 ML12352A0712012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Cover Through Attachment C, Seismic Walkdown Checklists (Swcs), Page 150 of 345 ML12352A0692012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment D, Area Walk-by Checklist (Awcs), Page 1 of 167 Through End ML12352A0682012-11-15015 November 2012 Attachment 1, Seismic Walkdown Report GGNS-CS-12-00002, Rev. 0, Attachment C, Seismic Walkdown Checklists (Swcs), Page 252 of 345 Through Page 345 of 345 GNRO-2012/00113, Vibration Data Report2012-09-18018 September 2012 Vibration Data Report GNRO-2012/00109, Stress Analysis Summary Demonstrating That the Nozzle to Safe-End DMW, N06B-KB, Will Perform Its Intended Design Function After Weld Overlay Installation2012-09-0606 September 2012 Stress Analysis Summary Demonstrating That the Nozzle to Safe-End DMW, N06B-KB, Will Perform Its Intended Design Function After Weld Overlay Installation GNRO-2012/00099, Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp2012-08-21021 August 2012 Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp 2024-08-22
[Table view] Category:Miscellaneous
MONTHYEARML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML22011A2982022-01-11011 January 2022 ANS Evaluation Report CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 ML21083A1362021-03-23023 March 2021 Completed Activities ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1382021-03-22022 March 2021 Rulemaking ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21014A2672021-01-14014 January 2021 Preapplication Engagement to Optimize Application Reviews January 12 Version - Copy ML21075A2752020-12-22022 December 2020 FAQ 20-06 GGNS Scram - Final Approved ML18123A3142018-05-0707 May 2018 Staff Assessment of Flooding Focused Evaluation (CAC No. MF9897; EPID L-2017-JLD-0015) ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals ML17290B1372017-10-17017 October 2017 Recommendations for Future Inspection - Replacement Steam Dryer. with GE Hitachi Nuclear Energy Report 0000-0125-6316-R2-NP GNRO-2017/00042, Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package2017-07-12012 July 2017 Report Pursuant to 10 CFR 71.95 (a)(3) and (B) of Seven Potential Instances of Noncompliance with Certificate of Compliance No. 9233 for TN-RAM Package GNRO-2017/00038, Focused Evaluation of External Flooding2017-06-27027 June 2017 Focused Evaluation of External Flooding GNRO-2016/00053, Mitigating Strategies Assessment (MSA) for Flooding Submittal2016-12-30030 December 2016 Mitigating Strategies Assessment (MSA) for Flooding Submittal GNRO-2016/00046, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 20162016-08-23023 August 2016 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations for the Period July 1, 2014 Through June 30, 2016 ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al GNRO-2014/00072, 2014 Report of Changes and Errors to 10CFR50.462014-11-12012 November 2014 2014 Report of Changes and Errors to 10CFR50.46 GNRO-2014/00060, Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-08-26026 August 2014 Entergy'S Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML14232A7392014-08-20020 August 2014 Report of 10CFR72.48 Evaluations - July 1, 2012 Through June 30, 2014 ML14098A1752014-05-0101 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident GNRO-2014/00027, Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.2014-03-31031 March 2014 Entergy Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi. ML13217A0532013-07-24024 July 2013 Summary of Root Cause Evaluation - Apparent Violation of 10CFR54.13 for Grand Gulf License Renewal GNRO-2013/00020, Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report2013-03-11011 March 2013 Required Response 2 for Near-Term Task Force Recommendation 2.1: Flooding - Hazard Reevaluation Report GNRO-2012/00113, Vibration Data Report2012-09-18018 September 2012 Vibration Data Report GNRO-2012/00099, Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp2012-08-21021 August 2012 Requested Information Vibration Data for the Main Steam Line Piping and Safety Relief Valves 4102 Mwt (105% Pltp ML12159A5152012-06-11011 June 2012 Review of 60-Day Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near Term Task Force Review of Fukushima Dai-ichi Accident ML12157A4262012-05-23023 May 2012 Attachment 38 to GNRO-2012/00039 - Ensr. 2007, Impingement Mortality and Entrainment Characterization Study (Imecs), Entergy -Waterford 3. December 2007 ML12157A2512012-05-23023 May 2012 Attachment 27 to GNRO-2012/00039, Er Reference - GGNS 2007b (2006 Wmp Report) Grand Gulf Nuclear Station 2006 Waste Minimization Certified Report ML12157A2462012-05-23023 May 2012 Attachment 22 to GNRO-2012/00039, Er Reference - Entergy 2010e (NPDES Crs) ML12157A1832012-05-23023 May 2012 Attachment 10 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment P Labeled Thermal Monitoring Procedural Protocols. ML12157A1812012-05-23023 May 2012 Attachment 8 to GNRO-2012/00039 - from Diskette Labeled: Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment K Labeled Condition Reports. ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML1108712502011-03-24024 March 2011 BWR Vessel and Internals Inspection Summaries for Spring 2010 Outages GNRO-2010/00058, Report of 10CFR50.59 Evaluations and Commitment Changes - July 1, 2009 Through June 30, 20102010-08-17017 August 2010 Report of 10CFR50.59 Evaluations and Commitment Changes - July 1, 2009 Through June 30, 2010 GNRO-2009/00036, Report of 10CFR50.59 Evaluations and Commitment Changes - April 1, 2008 Through June 30, 20092009-07-16016 July 2009 Report of 10CFR50.59 Evaluations and Commitment Changes - April 1, 2008 Through June 30, 2009 ML1019004062009-04-30030 April 2009 GPI Data Review, Grand Gulf Nuclear Station GNRO-2008/00052, Special Report 2008-001 - Violation of Certificate of Compliance 1014 Cask Load Limits for HI-STORM 100 System2008-07-17017 July 2008 Special Report 2008-001 - Violation of Certificate of Compliance 1014 Cask Load Limits for HI-STORM 100 System GNRO-2007/00068, Supplement 2 to Amendment Request Changes to the Condensate Storage Tank Level-Low Setpoints2007-09-21021 September 2007 Supplement 2 to Amendment Request Changes to the Condensate Storage Tank Level-Low Setpoints ML0723203352007-05-30030 May 2007 GG-05-2007-FINAL Operating Exam, Operations Training, Determine Shift Staffing to Meet Shift Requirements CNRO-2006-00043, Request for Alternative GG-ISI-002, Request to Use ASME Code Case N-7162006-09-22022 September 2006 Request for Alternative GG-ISI-002, Request to Use ASME Code Case N-716 CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee2006-07-13013 July 2006 Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee CNRO-2006-00023, Request for Alternative CEP-PT-001 Visual Examination of Vent and Drain Connections During System Leakage Tests2006-04-24024 April 2006 Request for Alternative CEP-PT-001 Visual Examination of Vent and Drain Connections During System Leakage Tests 2024-08-22
[Table view] |