Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-22-0115, Request for Acceptance of Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue (EAF) for the Safety Injection Nozzle21 April 2022Request for Acceptance of Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue (EAF) for the Safety Injection NozzleAging Management
License Renewal
RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.4630 May 2019Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46
CNS-17-043, Report 16C4437-RPT-002, Revision 0, 50.54(f) NTTF 2.1 Seismic High Frequency Confirmation for Catawba Nuclear Station.7 July 2017Report 16C4437-RPT-002, Revision 0, 50.54(f) NTTF 2.1 Seismic High Frequency Confirmation for Catawba Nuclear Station.Probabilistic Risk Assessment
Fukushima Dai-Ichi
Seismically rugged
Earthquake
Power-Operated Valves
Overspeed trip
CNS-17-022, Summary of 10CFR 50.54(q) Evaluation25 April 2017Summary of 10CFR 50.54(q) EvaluationExemption Request
Minimum staff
ML15253A41011 March 2016Enclosure 2 Screening Analysis ReportUltimate heat sink
Tornado Missile
Fukushima Dai-Ichi
Earthquake
Generic Issues Program
CNS-15-101, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants11 December 2015License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating PlantsHigh winds
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
ML15238A73924 August 2015Submittal of 10 CFR 71.95 Report on the 8-120B Cask
CNS-15-049, Submittal of 2013/2014 10 CFR 50.59 Summary Report of Changes, Tests, Experiments, and Evaluations11 May 2015Submittal of 2013/2014 10 CFR 50.59 Summary Report of Changes, Tests, Experiments, and EvaluationsSafe Shutdown
Incorporated by reference
Measurement Uncertainty Recapture
ML15096A51327 April 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Revaluations Relating to Recommendation 2.1 of the NTTF ReviewSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML15093A42131 March 2015Submittal of CNEI-0400-281, Revision 0, Core Operating Limits Reports for Cycle 21 Reload Core, Calculation CNC-1553.05-00-0621Boric Acid
Shutdown Margin
CNS-15-031, Commitment Change Evaluation Report for 201424 March 2015Commitment Change Evaluation Report for 2014Cyber Security
CNS-14-131, WCAP-17669-NP, Revision 0, Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate: Reactor Vessel Integrity and Neutron Fluence Evaluations30 June 2014WCAP-17669-NP, Revision 0, Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate: Reactor Vessel Integrity and Neutron Fluence EvaluationsPower Uprate
Measurement Uncertainty Recapture
ML14108A20116 May 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
Seismic Walkdown Report
CNS-14-045, Commitment Change Evaluation Report for 201331 March 2014Commitment Change Evaluation Report for 2013
ML12167A01621 June 2012Review of the 2011 Steam Generator Tube Inservice Inspection During Refueling Outage End of Cycle 19
NEI 99-04, Catawba, Units 1 & 2, Submittal of Commitment Change Evaluation Report for 201030 March 2011Catawba, Units 1 & 2, Submittal of Commitment Change Evaluation Report for 2010
ML11096035730 March 2011Submittal of Commitment Change Evaluation Report for 2010
ML10230016816 August 2010Units 1 & 2 - Supplement 2 to License Amendment Request for Duke Energy Cyber Security PlanCyber Security
Fuel cladding
Cyber attack
ML10167008910 June 2010Stations, Units 1 and 2 - Report Pursuant to 10 CFR 50.46, Changes to or Errors in an ECCS Evaluation Model
ML1019304176 May 2010Tritium Database ReportOffsite Dose Calculation Manual
Hydrostatic
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
ML10118024922 April 20102009 10CFR50.59 Summary ReportBoric Acid
Shutdown Margin
Cyber Security
Coast down
Manual Operator Action
ML10173038425 August 2009Westinghouse LTR-SGMP-09-109 NP-Attachment, Response to NRC Request for Additional Information on H*: RAI #4; Model F and Model D5 Generators.Finite Element Analysis
Exclusive Use
Operational leakage
ML10173039112 August 2009Westinghouse LTR-SGMP-09-100 NP-Attachment, Response to NRC Request for Additional Information on H*; Model F and Model D5 Steam Generators.Finite Element Analysis
Affidavit
Operational leakage
ML10173038931 May 2009WCAP-17072-NP, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model D5).Hydrostatic
Finite Element Analysis
Stress corrosion cracking
Affidavit
Operational leakage
ML0904005744 February 2009Special Report, Revision 1
ML08212014123 June 2008Operating Report for Cycle 17 Operation with Mixed Oxide (MOX) Fuel Lead AssembliesAffidavit
ML08127009130 April 2008Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsMission time
ML08093031226 March 2008Steam Generator Outage Summary 180-Day Report for End of Cycle 15 Refueling OutageNon-Destructive Examination
ML08065055929 February 2008Response to Request for Additional Information on GL-04-002Boric Acid
Ultimate heat sink
Mission time
Tornado Missile
Safe Shutdown Earthquake
Coatings
Foreign Material Exclusion
Exemption Request
Fuel cladding
Scaffolding
ML0731000851 November 2007Transmittal of DPC-NE-2012-A, Dynamic Rod Worth Measurement Using Casmo/Simulate
ML07080054613 March 2007Report Pursuant to 10 CFR 50.46, Changes to or Errors in an ECCS Evaluation Model
ML07065042227 February 2007Fitness-For-Duty Program Performance Data Reports for Period July 1, 2006 Through December 31, 2006Fitness for Duty
ML0704702728 February 2007Inspection and Mitigation of Alloy 82/182 Pressurizer Butt WeldsWeld Overlay
Unidentified leakage
ML06361009219 December 2006Request for Relief Number 06-GO-001 Alloy 600 Pressurizer Weld Overlays - Submittal of Committed InformationWeld Overlay
Nondestructive Examination
Stress corrosion cracking
Dissimilar Metal Weld
ML06361021714 December 2006Request for Relief Number 06-GO-001, Alloy 600 Pressurizer Weld Overlays - Submittal of Committed InformationWeld Overlay
Dissimilar Metal Weld
ML06255011231 August 2006Steam Generator Outage Summary 180-day Report for End of Cycle 14 Refueling Outage
ML06249042728 August 2006Fitness-For Duty Program Performance Data Reports for Period Covering January 1, 2006 Through June 30, 2006Fitness for Duty
ML06206029618 July 2006Steam Generator Outage Summary Inservice Inspection Report for End of Cycle 14 Refueling Outage
ML06066016821 February 2006Fitness-For-Duty Program Performance Data ReportsFitness for Duty
ML05244029324 August 2005Fitness-For-Duty Program Performance Data ReportsFitness for Duty
ML05179021021 June 2005Report Pursuant to 10 CFR 50.46, Changes to or Errors in an ECCS Evaluation Model
ML05097028531 March 20052004 10 CFR 50.59 ReportLoop seal
Fire Barrier
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Temporary Modification
Tornado Generated Missile
Tornado Missile Protection
Earthquake
Commercial Grade
Turbine Missile
ML05061003018 February 2005Duke Energy Corporation, Fitness-For-Duty Program Performance Data Reports for Period Covering 07/01/2004 Through 12/31/2004Fitness for Duty
ML04245053720 August 2004Letter Transmitting Fitness-For-Duty Program Performance Data Reports for Duke Energy Corp Oconee, McGuire and Catawba Nuclear Stations and the General OfficeFitness for Duty
ML0410501215 April 2004CFR50.59 Report Containing a Brief Description of Changes, Tests, and Experiments, Including a Summary of the Safety Evaluation of Each UnitShutdown Margin
Exemption Request
Fuel cladding
Recently irradiated fuel
ML03247152822 August 2003Fitness-for-Duty Program Performance Data ReportsFitness for Duty
ML03121004924 April 2003Duke Energy Topical Report Response to Request for Additional Information Letter Dated April 4, 2003Coatings
Nondestructive Examination
Scaffolding
Backfit
ML03063068125 February 2003Fitness-for-Duty Program, Performance Data ReportsFitness for Duty
ML02266004112 September 2002Response to Request for Additional Information - Topical Report DPC-NE-1005P, Revision 0, Nuclear Design Methodology Using CASMO/4SIMULATE-3 MOX (Proprietary)Exclusive Use
Affidavit