ML060660168

From kanterella
Jump to navigation Jump to search
Fitness-For-Duty Program Performance Data Reports
ML060660168
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  
Issue date: 02/21/2006
From: Morris J
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML060660168 (18)


Text

JAMES R MORRIS Duke Vice President, Nuclear Support lo_ Powere Nuclear Generation Duke Power 526 South Church St.

Charlotte, NC 28202 Mailing Address:

EC07H / PO Box 1006 Charlotte, NC 28201-1006 704 382 6401 February 21, 2006 704 382 6056 fax james. morris@duke-energy. corn U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Duke Energy Corporation Oconee Nuclear Station, Units 1, 2, and 3 NRC Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 NRC Docket Nos. 50-413, 50-414 Fitness-For-Duty Program Performance Data Reports Pursuant to 10 CFR 26.71 (d), enclosed are the Fitness-For-Duty Program Performance Data Reports for Duke Energy Corporation (Duke) Oconee, McGuire and Catawba Nuclear Stations and the General Office. The reporting period covered by this transmittal is July 1, 2005 through December 31, 2005.

Based on quantitative analysis accumulated from the testing laboratory results which are recorded and maintained in Duke's Fitness for Duty database, this data is considered to be complete, accurate and consistent with industry and Duke program expectations.

Questions regarding these reports should be directed to Peter R. Fowler at 704-382-6188 or Dana Boies at 704-382-1694.

Very truly yours Ja s.

orris Attachments www. duke power. corn

U.S. Nuclear Regulatory Commission February 21, 2006 Page 2 xc:

W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center, Suite 23T85 61 Forsyth St., SW Atlanta, GA 30303-8931 L. N. Olshan (addressee only)

NRC Senior Project Manager (ONS)

U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 J. F. Stang, Jr., Senior Project Manager (CNS & MNS)

U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 H 4A Rockville, MD 20852-2738 M. C. Shannon NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station E. F. Guthrie NRC Senior Resident Inspector Catawba Nuclear Station

Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 DUKE POWER Company Catawba Nuclear Station Location Anita Barnette 12/31/05 6 Month Ending (704) 382-4904 Contact Name Cutoffs: Screen/Confirmation (ng/ml)

Marijuana 50 ng/ml / 15 ng/ml A.

Cocaine 300 ng/ml /150ng/ml I

Opiates 300 ng/ml / 300 ng/mI I

Phone (Include area code) l Appendix A to 10 CFR 26 Lmphetamines 1000 ng/ml / 500 ng/ml

'hencyclidine 25 ng/ml / 25 ng/ml Alcohol (%BAC)

.04

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number vith 1233 511 Unescorted Access Categories

  1. Tested l Positive
  1. Tested l Positive *
  1. Tested l Positive Pre-Access 60 0

347 1

For Cause - Post 0

0 2

0 Accident For Cause-Observed 1

0 2

1 Behavior Random 384 (2) 1 182 (2) 1 Follow-up 1 6 1

7 0

Other 3

0 0

0 Total 464 2

540 3

Rev. 1/92

Breakdown of Confirmed Positive Tests for Specific Substances - Catawba Nuclear Station (for 6 Month Ending 12/31/05)

Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal 1

2 3

4 5

(I) tamines clidine (1)

To Test Licensee Employees 1

1 0

0 0

0 0

Long-Term Contractors M

i -

U

. _.7 11.

I.

Ed dfi*...

i

y.

d

~

.I i h

I I

]F i

Short-Term Contractors I

1 0

0 0

I 0

Total 2

2 0

0 0

1 O0 11 1

Z5 l

A

Attachment A Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 (for Catawba Nuclear Station) for 6 Month Ending 12/31/05 Summary of Management Actions:

(Include initiatives taken, lessons learned, effectiveness evaluation, etc. as appropriate.)

General Note:

Duke Power randomly tests at a rate of at least 50% of the pool population.

Note (1):

Duke Power has more restrictive cut-off levels for Alcohol and Marijuana. In the past, Duke Power has shown this detail on the Performance Data Report's first sheet. Beginning with the semi-annual report (period ending 06/30/01),

Duke Power will provide a more detailed report that will indicate positive test results confirmed at the NRC cut-off level and Duke Power's cut-off level. This detailed report for the period ending 12/31/05 is attached (see Attachment B).

Note (2):

Duke Power has included Random Pre-Access screen numbers in the total random numbers on the initial sheet. The number of Random Pre-Access has been broken out on the detailed report (see Attachment B).

Summarv Listing of Events Reported Under 10 CFR 26.73:

Date of Position of How Discovered Substance Management Actions Taken Event Individual Detected Involved None during this reporting period

_III

Attachment B Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 (for Catawba Nuclear Station) 6 Month Ending-12/31/05 POSITIVE Cut-Off Level Detail Report (NRC / Duke Level)

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 1233 511 Unescorted Access Average Number in 3

21 Random - Pre-Access Pool Categories

  1. Tested
  1. Positive
  1. Tested
  1. Positive *
  1. Tested
  1. Positive Pre-Access NRC Duke NRC Duke 60 0

0 347 0

1 For Cause - Post Accident 0

0 0

2 0

0 For Cause - Observed Behavior I

0 0

2 1

0 Random - Badged 370 1

0 170 1

0 Random - Pre Access 14 (2) 0 0

12 (2) 0 0

Follow-up 16 1

0 7

0 0

Other 3

0 0

0 0

0 Total 464 2

0

__I:

540 2

1 SUBSTANCE Cut-Off Level Detail Report (NRC / Duke Level)

Marijuana Cocaine Opiates Amp he-Phency-Alcohol Refusal 1 2 3 4 5 TOTAL (1) tamines clidine (1) to Test NRC Duke NRC Duke Licensee Employees 1

0 1

0 0

0 0

0 0

2 Long-Term Contractors= L..._. =_

Short-Term Contractors 1

0 1

0 0

0 0

1 0

3 Total 2

0 2

000 0

1 0

5

Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 12/31/05 DUKE POWER Company 6 Month Ending McGuire Nuclear Station Location Anita Barnette (704) 382-4904 Contact Name Cutoffs: Screen/Confirmation (ng/ml)

Phone (Include area code)

° Appendix A to 10 CFR 26 Marijuana Cocaine Opiates 50 ng/ml 300 ng/ml 300 ng/mI

/ 15 ng/ml

/ 150 ng/ml

/ 300 ng/ml Amphetamines 1000 ng/ml / 500 ng/mI Phencyclidine 25 ng/ml / 25 ng/ml Alcohol (%BAC)

.04 I

/

/

Long-Term Short-Term Testing Results Licensee Employee:s Contractor Personnel Contractor Personnel Average Number with 1307 361 Unescorted Access Categories

  1. Tested
  1. Positive
  1. Tested
  1. Positive *
  1. Tested Positive Pre-Access 54 0

708 6

For Cause - Post 1

0 4

1 Accident For Cause-Observed 0

0 1

0 Behavior Random 383 (2) 1 140 (2) 2 Follow-up 21 0

2 0

Other I

0 1

0 Total 460 1

856 9

Rev. 1/92

Breakdown of Confirmed Positive Tests for Specific Substances - McGuire Nuclear Station (for 6 Month Ending 12/31/05)

Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal 1

2 3

4 5

(1) tamines clidine (1)

To Test Licensee Employees 0

1 0

0 0

0 0

Long-Term Contractors I

I I4.I I.. I.:,..,;i'

'1"'

Short-Term Contractors 5

4 0

0 0

0 0

Total 1

5 5

0 0

0 0

0

=

=

=

=

1 A

Attachment A Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 (for McGuire Nuclear Station) for 6 Month Ending 12/31/05 Summary of Management Actions:

(Include initiatives taken, lessons learned, effectiveness evaluation, etc. as appropriate.)

General Note:

Duke Power randomly tests at a rate of at least 50% of the pool population.

Note (l):

Duke Power has more restrictive cut-off levels for Alcohol and Marijuana. In the past, Duke Power has shown this detail on the Performance Data Report's first sheet. Beginning with the semi-annual report (period ending 06/30/01),

Duke Power will provide a more detailed report that will indicate positive test results confirmed at the NRC cut-off level and Duke Power's cut-off level. This detailed report for the period ending 12/31/05 is attached (see Attachment B).

Note (2):

Duke Power has included Random Pre-Access screen numbers in the total random numbers on the initial sheet. The number of Random Pre-Access has been broken out on the detailed report (see Attachment B).

Summary Listing of Events Reported Under 10 CFR 26.73:

Date of Position of How Discovered Substance Management Actions Taken Event Individual Detected Involved None during this reporting period.

III_

Attachment B Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 (for McGuire Nuclear Station) 6 Month Ending - 12/31/05 POSITIVE Cut-Off Level Detail Report (NRC / Duke Level)

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 1307 361 Unescorted Access Average Number in 3

21 Random - Pre-Access Pool Categories

  1. Tested
  1. Positive
  1. Tested
  1. Positive *
  1. Tested
  1. Positive (1)

()

Pre-Access NRC Duke NRC Duke 54 0

0 708 3

3 For Cause - Post Accident I

0 0

4 1

0 For Cause - Observed Behavior 0

0 0

I 0

0 Random - Badged 366 1

0

.121 2

0 Random - Pre-Access 17 (2) 0 19 (2) 0 0

Follow-up 21 0

0 2

0 0

Other I

0 0

I 0

0 Total Total 460 1

0 hi 856 6

3 SUBSTANCE Cut-Off Level Detail Report (NRC / Duke Level)

Marijuana Cocaine Opiates Amp he-Phency-Alcohol Refusal 1 2 3 4 5

TOTAL

(:

tamies clidine l

1 to Test NRC Duke NRC Duke Licensee Employees 0

0 1

0 0

0 0

0 0

I Long-Term.

17, Contractors i

_a-Short-Term Contractors 2

3 4

0 0

0 0

0 0

9 Total 2

3 5

0 0_

0 0

0 0

10

Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 12/31/05 DUKE POWER Company Oconee Nuclear Station Location Anita Barnette 6 Month Ending (704) 382-4904 Contact Name Cutoffs: Screen/Confirmation (ng/ml)

Marijuana 50 ng/ml / 15 ng/ml A

Cocaine 300 ng/ml / lSOng/ml I

Opiates 300 ng/ml / 300 ng/ml I

Phone (Include area code) l I Appendix A to 10 CFR 26 Amphetamines 100ong/ml / 500 ng/ml Phencyclidine 25 ng/ml /

25 ng/ml Alcohol (%BAC)

.04

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 1363 756 Unescorted Access Categories

  1. Tested
  1. Positive
  1. Tested
  1. Positive *
  1. Tested
  1. Positive Pre-Access 56 0

579 4

For Cause - Post 0

0 0

0 Accident For Cause - Observed 0

0 3

2 Behavior Random 381 (2) 1 243 (2) 1 Follow-up 7

0 9

0 Other 1

0 1

0 Total 445 1

835 7

Rev. 1/92

Breakdown of Confirmed Positive Tests for Specific Substances - Oconee Nuclear Station (for 6 Month Ending 12/31/05)

Licensee Employees Long-Term Contractors Short-Term Contractors

Attachment A Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 (for Oconee Nuclear Station) for 6 Monlh Ending 12/31/05 Summary of Management Actions:

(Include initiatives taken, lessons learned, effectiveness evaluation, etc. as appropriate.)

General Note:

Duke Power randomly tests at a rate of at least 50% of the pool population.

Note (1):

Duke Power has more restrictive cut-off levels for Alcohol and Marijuana. In the past, Duke Power has shown this detail on the Performance Data Report's first sheet. Beginning with the last semi-annual report (period ending 06/30/01),

Duke Power will provide a more detailed report that will indicate positive test results confirmed at the NRC cut-off level and Duke Power's cut-off level. This detailed report for the period ending 12/31/05 is attached (see Attachment B).

Note (2):

Duke Power has included Random Pre-Access screen numbers in the total random numbers on the initial sheet.

The number of Random Pre-Access has been broken out on the detailed report (see Attachment B).

Summary Listing of Events Reported Under 10 CFR 26.73:

Date of Position of How Discovered Substance Management Actions Taken Event Individual Detected Involved Screened Operations Shift Random drug/alcohol Alcohol Confirmed positive on 10/06/05 at Duke 10/06/05 Supervisor screen Power's more stringent cut off level (below.04); unescorted access was restricted immediately; referred to EAP for assessment; individual attended recommended inpatient treatment program; submitted a return to work screen with negative results; individual's access restriction was removed; individual was placed in random follow-up drug/alcohol screening program; event was reported to Oconee's Nuclear Compliance Group for reporting purposes; reported to NRC on 10/06/05 at 1553.

Attachment B Fitness for Duty Program Perfcrmance Data Personnel Subject to 10CFR 26 (for Oconee Nuclear Station) for 6 Month Ending 12/31/05 POSITIVE Cut-Off Level Detail Report (NRC / Duke Level)

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 1363 756 Unescorted Access Average Number in 2

27 Random Pre-Access Pool Categories

  1. Tested Positive Tested
  1. Positive
  • Tested Positive

(:)

(1)

Pre-Access NRC Duke NRC Duke 56 0

0 579 2

2 For Cause - Post Accident 0

0 0

0 0

0 For Cause - Observed Behavior 0

0 0

3 2

0 Random - Badged 372 0

1 227 0

1 Random - Pre-Access 9 (2) 0 0

_ I 16 (2) 0 0

Follow-up i

_7 0

0

_9 0

0 Other I

0 0

I 0

0 Total 445 0

1

__[,___'

i 835 4

3 SUBSTANCE Cut-Off Level Detail Report (NRC / Duke Level)

Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal 1 2 3 4 5 TOTAL (1) tamines clidine (1

l to Test NRC Duke NRC Duke Licensee Employees 0

0 0

0 0

0 0

1 0

1 Long-Term Contractors

=

=

=

=

=

Short-Term Contractors 2

2 1

0 0

0 1

1 0

7 Total 2

2 1

0 0

0 1

2 0

8

Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 12/31/05 DUKE POWER Company 6 Month Ending General Office Location Anita Barnette (704) 382-4904 Contact Name Cutoffs: Screen/Confirmation (ng/ml)

Phone (Include area code)

El Appendix A to 10 CFR 26 Marijuana Cocaine Opiates 50 ng/ml / 15 ng/ml 300 ng/ml / lSO ng/ml 300 ng/ml / 300 ng/ml Amphetamines 1000 ng/ml / 500 ng/ml Phencyclidine 25 ng/ml / 25 ng/ml Alcohol (%BAC)

.04

/

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 338 Unescorted Access Categories

  1. Tested
  1. Positive
  1. Tested
  1. Positive *
  1. Tested Positive Pre-Access 27 0

0 (3) 0 For Cause - Post 0

0 0

0 Accident For Cause-Observed 0

0 0

0 Behavior Random 105 (2) 0 0

0 Follow-up 0

0 0

0 Other 0

0 0

0 Total 132 0

0 (3) 0 Rev. 1/92

Breakdown of Confirmed Positive Tests for Specific Substances - Duke Power Company General Office (for 6 Month Ending 12/31/05)

Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal 1

2 3

45 (1) tamines clidine (1)

To Test Licensee Employees 0

0 0

0 0

0 0

Long-Term Contractors 1

Short-Term Contractors 0

0 0

0 0

0 0

Total I0I 0

0 0

10 0

0

=

1[

0 A

Attachment A Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 (for Duke Power Company General Office) for 6 Month Ending 12/31/05 Summary of Management Actions:

(Include initiatives taken, lessons learned, effectiveness evaluation, etc. as appropriate.)

General Note:

Duke Power randomly tests at a rate of at least 50% of the pool population.

Note (1):

Duke Power has more restrictive cut-off levels for Alcohol and Marijuana. In the past, Duke Power has shown this detail on the Performance Data Report's first sheet. Beginning with the last semi-annual report (period ending 06/30/01),

Duke Power will provide a more detailed report that will indicate positive test results confirmed at the NRC cut-off level and Duke Power's cut-off level. This detailed report for the period ending 12/31/05 is attached (see Attachment B).

Note (2):

Duke Power has included Random Pre-Access screen numbers in the total random numbers on the initial sheet. The number of Random Pre-Access has been broken out on the detailed report (see Attachment B).

Note (3):

Duke Power Company approved the Pre-Access Testing portion of Westinghouse's Fitness for Duty Program effective August 3, 1999. The 0 Pre-Access screens reported under "Short Term Contractor Personnel" are being reported with Duke Power Company performance data as a result of accepting Westinghouse's program.

Summary Listing of Events Reported Under 1 0 CFR 26.73:

Date of Position of How Discovered Substance Management Actions Taken Event Individual Detected Involved None during this reporting period I

I

Attachment B Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 (for Duke Power Company General Office) for 6 Month Ending 12/31/05 POSITIVE Cut-Off Level Detail Report (NRC / Duke Level)

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 338 Unescorted Access Average Number in 2

Random Pre-Access Pool Categories

  1. Tested
  1. Positive
  1. Tested
  1. Positive *
  1. Tested
  1. Positive Pre-Access NRC Duke NRC Duke 27 0

0

._:_X_

0 (3) 0 0

For Cause - Post Accident 0

0 0

0 0

0 For Cause - Observed Behavior 0

0 0

0 0

0 Random - Badged 98 0

0 0

0 0

Random - Pre-Access 7 (2) 0 0

0 0

0 Follow-up 0

0 0

__0 0

0 Other 0

0 0

0 0

0 Total 132 0

0 V

0 (3) 0 0

SUBSTANCE Cut-Off Level Detail Report (NRC / Duke Level)

Marijuana Cocaine Opiates Amphe-Phency-Alcohol Refusal 1 2 3 4 5 TOTAL (1) tamines clidine (1

to Test NRC Duke NRC Duke Licensee 0

0 0

0 0

0 0

0 0

0 Employees Long-Term Contractors C=

=

=

r T

I I 4 4 Short-Tern 0

0 0

0 0

0 0

0 0

0 Contractors Total 0

0 0

0 0

0 0

0 0

0