 Issue dateTitleTopic
ML24262A10520 September 2024Pre-Submittal Presentation Slides - 1R25 Pzr Nozzle Life of Repair - Relief Request 73 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3Pre-submittal
ML24236A70322 August 2024Pre-Submittal Meeting Slides to Support August 29, 2024 Aps/Westinghouse Thermal Design Procedure (Wtdp) MeetingAnticipated operational occurrence
Pre-submittal
ML24212A3391 August 2024August 1, 2024, Public Meeting on Potential Palisades Nuclear Plant Restart PresentationOpen House
ML24192A32612 July 2024Licensee Slides to Support Pre-Submittal Meeting – Relief Request 71 SlidesPre-submittal
ML24192A34012 July 2024Licensee to Support Pre-Submittal Meeting - Relief Request 72 SlidesPre-submittal
ML24275A23328 June 2024APS Slides Supporting Preapplication Meeting Regarding Safety Injection Tank Pressure BandGOTHIC
Pre-submittal
ML24155A2117 June 2024VRR-02: Exercise Test Frequency Reduction (Slides)
ML24155A2127 June 2024VRR-03: SOV Test Criteria (Slides)
ML24080A12925 March 2024March 25, 2024, Pre-Submittal Meeting for STP QA Plan ChangeCondition Adverse to Quality
Pre-submittal
ML24038A1747 February 2024Pre-submittal Meeting SlidesPre-submittal
ML24019A15122 January 2024Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth
ML24003A8533 January 2024January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108)Pre-submittal
ML23240A32331 August 2023APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program PlanWeld Overlay
Stress corrosion cracking
License Renewal
Pre-submittal
ML23192A01011 July 2023NRC RIPE 7-11-23 Public Meeting Presentation SlidesProbabilistic Risk Assessment
Pre-submittal
ML23144A02525 May 2023APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge LineLicense Renewal
Pre-submittal
ML23093A02530 April 2023April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LARPre-submittal
ML23090A1394 April 2023April 4, 2023 Presubmittal Meeting Presentation - LAR to Adopt TSTF-266, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (EPID: L?2023?LRM-0017)Pre-submittal
ML23055B0571 March 2023March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012)Mururoa
Pre-submittal
ML22243A13131 August 2022STP Nuclear Operating Company August 31, 2022 Presentation - Pre-Submittal Meeting for Updated Main Steam Line Break and Locked Rotor Dose Consequence Analysis to Address Extended Cooldown TimelinesPre-submittal
ML22214A0972 August 2022Presentation by South Texas ProjectAging Management
License Renewal
ML22153A29417 June 2022richardsd-hv-th28Aging Management
License Renewal
ML22096A0056 April 2022TSTF-487 LAR Pre-submittal Public Meeting Presentation SlidesPre-submittal
ML22025A00125 January 20221/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22Pandemic
COVID-19
Pre-submittal
ML21342A0508 December 2021TSTF-567 LAR Pre-submittal Public Meeting Presentation SlidesPre-submittal
ML21320A10317 November 2021RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation SlidesProbabilistic Risk Assessment
Operator Manual Action
Exemption Request
Fuel cladding
Pre-submittal
ML21194A25010 August 2021RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRIMachine learning
ML21203A27026 July 2021Presentation - 7-26-21 Meeting with STPNOC Proposed South Texas Project Moderator Temperature Coefficient TS ChangeManual Operator Action
ML21131A01313 May 2021License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides
ML21025A00326 January 2021Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides
ML21025A00425 January 2021Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation SlidesProbabilistic Risk Assessment
ML20171A23524 June 2020Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020Pre-application
ML20125A3364 May 2020STP Presubmittal Meeting Exigent Accumulator LAR 2020-05-05 Presentation L-2020-LRM-0039Pre-submittal
ML19326A00722 November 2019Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan - December 3, 2019Pre-application
ML19192A09711 July 2019License Amendment Request for Emergency Plan, July 11, 2019Minimum staff
ML18299A07226 September 2018Ionizing Radiation Factsheet-Veterans - Information for Veterans and Their FamiliesDepleted uranium
ML17320A19315 November 2017NRC Public Meeting, Treatment of Mitigating Strategies in Risk Informed Decision MakingSafe Shutdown
Mission time
Cyber Security
FLEX
B.5.b
GOTHIC
Skill of the craft
ML17003A03329 December 2016Enclosure 2 - APS Meeting SlidesMultiple Spurious Operation
FLEX
Surveillance Frequency Control Program
Continuous fire watch
ML16356A06121 December 201612/21/2016 South Texas Project Aluminum Bronze Aging Management Request for Additional InformationAging Management
ML16357A68720 December 2016One-Time License Amendment Request Unit 3 Train B Diesel GeneratorInternal Flooding
Multiple Spurious Operation
FLEX
Surveillance Frequency Control Program
ML17003A0863 November 2016Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016Boric Acid
Exemption Request
Affidavit
ML16264A36320 September 2016Pre-Application Public Meeting for Proposed License Amendment Request to Revise the STPEGS Emergency Plan Staff Augmentation TimesFLEX
Pre-application
ML16253A4117 September 2016Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016
ML16210A04428 July 2016STP Nuclear Operating Company Handouts for July 28, 2016 Public Meeting on GSI-191GOTHIC
ML16172A01925 July 2016STP Aluminum Bronze Selective Leaching Public Meeting - June 21, 2016Coatings
Aging Management
License Renewal
ML16202A48721 July 201607/21/2016 Talking Points, Supplemental Information for South Texas Project and NRC Public Meeting
ML16111A02718 April 2016STP Nuclear Operating Company Slideshow for Public Meeting on April 21, 2016 for GSI-191 Resolution (CAC No. MF2400-01)Coatings
ML16083A47224 March 2016NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3Pre-submittal
ML16062A3042 March 2016TS 5.3.2 LAR Pre-Submittal Meeting Presentation - March 2, 2016Shutdown Margin
Pre-submittal
ML16014A11020 January 2016Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3Coatings
Exemption Request
Coast down
Pre-submittal
ML16033A00419 January 2016Applicant's Slides for STP Meeting on Aluminum Bronze Aging ManagementAging Management