ML23095A372 | 5 April 2023 | 2023 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal | Offsite Dose Calculation Manual Aging Management Pressure and Temperature Limits Report Surveillance Frequency Control Program |
ML23095A376 | 5 April 2023 | Enclosure 4: Technical Requirements Manual (TRM) Revision 109 | Safe Shutdown Unanalyzed Condition Time of Discovery Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio High Radiation Area Grab sample Offsite Dose Calculation Manual Fire Barrier Post Accident Monitoring Hydrostatic Coatings Squib Emergency Lighting Missed surveillance Corrosion bonding Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Operability Determination Spiral reload License Renewal Earthquake Fuel cladding Offsite Circuit Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Early Warning Fire Detection Power change |
ML22182A076 | 1 July 2022 | Resubmittal of the 2021 Annual Radioactive Effluent Release Report | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
BVY 22-012, Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) | 12 April 2022 | Biennial Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) | Non-Destructive Examination Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Fire Protection Program Grace period |
JAFP-21-0022, Technical Requirements Manual Specifications - Redacted | 29 March 2022 | Technical Requirements Manual Specifications - Redacted | Safe Shutdown Unanalyzed Condition Time of Discovery Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio High Radiation Area Grab sample Offsite Dose Calculation Manual Fire Barrier Post Accident Monitoring Hydrostatic Coatings Squib Emergency Lighting Missed surveillance Corrosion bonding Pressure and Temperature Limits Report Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Operability Determination Spiral reload License Renewal Earthquake Fuel cladding Offsite Circuit Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Early Warning Fire Detection Power change |
NL-21-029, Offsite Dose Calculation Manual (Odcm), Revision 5 | 30 April 2021 | Offsite Dose Calculation Manual (Odcm), Revision 5 | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement | 10 February 2021 | Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement | Time of Discovery Coatings Nondestructive Examination VT-2 Finite Element Analysis Through Wall Leak Through-Wall Leakage |
NL-20-077, Submittal of Quality Assurance Program Manual Revision 2 | 9 November 2020 | Submittal of Quality Assurance Program Manual Revision 2 | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Fire Protection Program Grace period |
ML20259A213 | 14 September 2020 | Defueled Safety Analysis Report, Appendix B, Technical Requirements Manual (TRM) | Unanalyzed Condition Time of Discovery Offsite Dose Calculation Manual Tornado Missile Post Accident Monitoring FLEX B.5.b Missed surveillance Spent Fuel Pool Instrumentation B.5.b Mitigating Strategies Earthquake |
NL-20-051, Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center | 7 July 2020 | Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Fire Protection Program Grace period |
NL-19-062, Registration of Spent Fuel Cask Use | 2 July 2019 | Registration of Spent Fuel Cask Use | |
ML19120A215 | 30 April 2019 | Submittal of the Entergy Pilgrim Quality Assurance Program Manual (QAPM) Pilgrim Nuclear Power Station (PNPS) | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Fire Protection Program Grace period |
ML17109A487 | 10 April 2017 | Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Fire Protection Program Grace period |
JAFP-16-0003, Transmittal of Emergency Plan Updates, Including Revision 28 to Section 1, Revision 27 to Section 27 and Revision 27 to Section 4 | 12 January 2016 | Transmittal of Emergency Plan Updates, Including Revision 28 to Section 1, Revision 27 to Section 27 and Revision 27 to Section 4 | |
BVY 14-072, Submittal of the Entergy Vermont Yankee Quality Assurance Program Manual, Revision 0 | 30 October 2014 | Submittal of the Entergy Vermont Yankee Quality Assurance Program Manual, Revision 0 | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Fire Protection Program Grace period |
ML14287A294 | 17 September 2014 | Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual | Safe Shutdown Unanalyzed Condition Boric Acid Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Tornado Missile Post Accident Monitoring Hydrostatic Emergency Lighting Missed surveillance Earthquake Recently irradiated fuel |
NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual | 17 September 2014 | Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual | Safe Shutdown Unanalyzed Condition Boric Acid Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Tornado Missile Post Accident Monitoring Hydrostatic Emergency Lighting Missed surveillance Earthquake Recently irradiated fuel |
ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) | 4 November 2013 | Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) | |
CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G | 26 April 2013 | Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Fire Protection Program Grace period |
ML13157A133 | 29 August 2012 | Enclosure 2 to NL-13-028 - Offsite Dose Calculation Manual Rev. 4 | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML12139A109 | 6 July 2011 | Off-Site Dose Calculation Manual Revision 34 | Loop seal Grab sample Offsite Dose Calculation Manual Stroke time Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Exemption Request Power change |
ML12132A123 | 18 January 2011 | Enclosure 2 to NL-12-020 - Offsite Dose Calculation Manual Rev. 3 | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
NL-10-107, Indian Point 2 (IP2) Nuclear Power Plant Amendment Update to the Final Safety Analysis Report (Fsar), Revision 22, Technical Requirements Manual | 6 October 2010 | Indian Point 2 (IP2) Nuclear Power Plant Amendment Update to the Final Safety Analysis Report (Fsar), Revision 22, Technical Requirements Manual | Safe Shutdown Unanalyzed Condition Boric Acid Time of Discovery High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Tornado Missile Post Accident Monitoring Hydrostatic Emergency Lighting Missed surveillance Earthquake |
ML11280A134 | 6 October 2010 | Indian Point 2 (IP2) Nuclear Power Plant Amendment Update to the Final Safety Analysis Report (Fsar), Revision 22, Technical Requirements Manual | Safe Shutdown Unanalyzed Condition Boric Acid Time of Discovery High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Tornado Missile Post Accident Monitoring Hydrostatic Emergency Lighting Missed surveillance Earthquake |
ML101240990 | 29 April 2010 | Revision 2 to Offsite Dose Calculation Manual | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
NL-09-136, 2009 Amendment Update to the Final Safety Analysis Report (Fsar), Revision 03, Techical Requirements Manual (Trm), November 2009, Section 1.0 Through 5.7 | 13 October 2009 | 2009 Amendment Update to the Final Safety Analysis Report (Fsar), Revision 03, Techical Requirements Manual (Trm), November 2009, Section 1.0 Through 5.7 | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Post Accident Monitoring Hydrostatic Emergency Lighting Locked High Radiation Area Missed surveillance Significance Determination Process Earthquake Turbine Missile Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Scaffolding Stretch Power Uprate |
ML082070155 | 26 June 2008 | Distribution of IP3 Technical Specification Amendment 236 | Boric Acid Shutdown Margin Ultimate heat sink Post Accident Monitoring Missed surveillance |
BVY 09-037, Off-Site Dose Calculation Manual, Revision 32 | 24 June 2008 | Off-Site Dose Calculation Manual, Revision 32 | Loop seal Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
ML090400347 | 4 June 2008 | Condition Report CR-IP2-2008-02917 | Safe Shutdown |
ML090410322 | 15 April 2008 | Entergy'S Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008 | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Fire Protection Program Grace period |
BVY 09-037, Vermont Yankee - Off-Site Dose Calculation Manual, Revision 31 | 8 April 2008 | Vermont Yankee - Off-Site Dose Calculation Manual, Revision 31 | |
ML090400254 | 1 April 2008 | Excerpt TRM - Sbo/Dpp. R Diesel Electrical Distribution System | Safe Shutdown |
ML090540561 | 8 January 2008 | IPEC Site Management Manual, Radiological Ground Water Monitoring Program | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report |
ML072480163 | 6 July 2007 | Revision 0 to IPEC Site Management Manual, IP-SMM-AD-103, IP3 Its/Bases | Fire Protection Program |
ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 | 15 June 2007 | Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Fire Protection Program Grace period |
ML071500322 | 29 March 2007 | IPEC Site Management Manual, Technical Specification Bases Update 23-05/16/07 | Boric Acid Missed surveillance |
ML071140203 | 29 March 2007 | Technical Specification Bases | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Post Accident Monitoring Nondestructive Examination Missed surveillance Fuel cladding Pressure Boundary Leakage |
ML070720537 | 26 February 2007 | Improved Technical Specifications, Amendment 233 | Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Post Accident Monitoring Nondestructive Examination Annual Radiological Environmental Operating Report Pressure Boundary Leakage |
ML070530371 | 30 January 2007 | Email: (PA-LR) VYNPS TRM | Safe Shutdown Time of Discovery Fire Barrier Annual Radioactive Effluent Release Report Scram Discharge Volume Process Control Program Fuel cladding Fire Protection Program Fire Watch Hourly Fire Watch Early Warning Fire Detection |
ML070290352 | 19 January 2007 | Revision 0 to IPEC Site Management Manual, IP-SMM-AD-103, IP3 Its/Bases | Fire Protection Program |
ML070290345 | 4 December 2006 | Revision 0 to IPEC Site Management Manual, IP-SMM-AD-103, IP3 Its/Bases | High Radiation Area |
ML070400247 | 8 November 2006 | E-Mail from J. Noggle of USNRC to J. Kottan of USNRC and T. Rice of Department of Environmental Conservation, Regarding Gwmp Plan and Procedure | |
ML070400243 | 7 November 2006 | E-Mail from J. Adler of Entergy to J. Noggle of USNRC, Regarding Gwmp Plan and Procedure | |
ML061780183 | 15 June 2006 | Technical Specification Update for Unit 3 | |
NL-06-056, Offsite Dose Calculation Manual (ODCM) | 15 May 2006 | Offsite Dose Calculation Manual (ODCM) | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML063190524 | 19 April 2006 | Technical Specification Bases Manual, IP-SMM-AD-103 | Missed surveillance |
ML062000369 | 19 April 2006 | Update to IP3 Technical Specifications Bases | Boric Acid Shutdown Margin Missed surveillance |
ML061770070 | 4 April 2006 | VYNPS Environmental Review Procedure, Nuclear Management Manual Fleet Procedure EN-EV-115, Rev. 4 | License Renewal |
ML070680154 | 13 February 2006 | (2) ENN-NDE-10.01, Rev. 2; VT-1 Examination, 02/13/2006 | Non-Destructive Examination Coatings Nondestructive Examination VT-2 Liquid penetrant |
ML070790208 | 2 February 2006 | ENN-NDE-10.03, 02/02/06, VT-3 Examination | Non-Destructive Examination Coatings Nondestructive Examination VT-2 Moisture barrier |