Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217A5295 October 1999Notification of 991026 Meeting with Vynpc in King of Prussia,Pa to Discuss Licensee Responses to Maint Rule Violation of 10CFR50.65(a)(3), Balancing Reliability with UnavailabilityMaintenance Rule Program
ML20211H44427 August 1999Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues
ML20196D70225 June 1999Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to PublicBackfit
DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action20 April 1999Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action
ML20205J2816 April 1999Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon
ML20205B23025 March 1999Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28Safe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Grab sample
Missed surveillance
Job Performance Measure
Process Control Program
Earthquake
Deep Dose Equivalent
Pressure Boundary Leakage
Continuous fire watch
Hourly Fire Watch
Power change
Coast down
Operability Assessment
IR 05000275/199930125 March 1999Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28
ML20207M76416 March 1999Forwards Monthly Rept of Status of 10CFR2.206 Petitions as of 990228.During Feb Director'S Decision DD-99-01,DD-99-02, DD-99-03 & DD-99-04,became Final Agency Actions & Closed. Attachment 3 Filed in Central FilesFuel cladding
ML20205J2739 March 1999Forwards Request for Addl Info Transmitted on 990224 to T Silko of Vermont Yankee Nuclear Power Corp.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAISafe Shutdown
ML20207M3402 March 1999Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon
ML20207J75619 February 1999Forwards Proposed Transmittal Ltr & Comments on Physical Protection Plan in Response to Verbal Request from Rancho Seco to Provide Addl Comments on ISFSI Physical Protection Installation
ML20202E40228 January 1999Forwards Draft RAI Re Proposed Amend on SFP Assemblies Storage Expansion.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position
ML20196A95419 November 1998Notification of 981217 Meeting with Util in Rockville,Md to Discuss Util Plans & Activities Related to long-term Spent Fuel Storage at Vermont Yankee Nuclear Power Station
ML20155H9053 November 1998Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage
ML20239A2961 September 1998Notification of Significant Licensee Meeting 98-078 W/Util on 980916 to Discuss NRC Systematic Assessment of Licensee Performance of Vermont Yankee Nuclear Power Station for Period 970119-980718Systematic Assessment of Licensee Performance
ML20236Y6308 August 1998Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld
ML20237A0017 August 1998Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl
ML20248M28812 June 1998Provides Document That Can Be Referenced as Basis for Opening TAC MA2057 - Humboldt Bay Vent Stack Removal. 10CFR50.59 SE Prepared by PG&E for Addition of New Vent Stack & Removal of Existing Vent Stack EnclProbabilistic Risk Assessment
Earthquake
ML20248L8629 June 1998Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld
ML20248H7533 June 1998Notification of 980623 Meeting W/Vermont Yankee Nuclear Power Corp in Rockville,Md to Discuss Util Plans & Activities Related to Long Term Spent Fuel Storage at Plant
ML20248L5182 June 1998Forwards Document Developed by Cecil & R Croteau to Be Forwarded to V Dricks as Response to MulliganProbabilistic Risk Assessment
Fatality
ML20248K4452 June 1998Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl
ML20217F41522 April 1998Forwards Facility Submittal of Initial/Operating Retake Exam Administered on 980209Half scram
ML20216D67313 April 1998Notification of 980429 Meeting W/Util in Eureka,Ca to Discuss Planned Decommissioning of Humboldt Bay Power Plant
ML20247G9087 April 1998Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion
ML20217B85723 March 1998Notification of 980407 Meeting W/Util in Rockville,Md to Discuss Plant Plans & Activities Re Assurance of Adequate NPSH for Certain safety-related Pumps
ML20216G13213 March 1998Notification of 980324 Meeting W/Util to Discuss Licensee Plans & Activities Re Torus Strainer Replacement & Containment Issues.Meeting Will Take Place in Rockville,Md
ML20216G76411 March 1998Notification of 980320 Meeting W/Util in Rockville,Md Re PG&E Plans for Removing Sf from Humboldt Bay SFP
ML20217N44810 March 1998Responds to 971110 Request for Assistance in Reviewing Technical Adequacy of Vermont Yankee Assessment & Repair of Structural Defects in Skid Mounted Piping for Edgs.Noted No Immediate Safety Concerns.Nrr Evaluation Encl
ML20217N47227 February 1998Forwards SER Re Structural Integrity of skid-mounted Piping Associated W/Edgs at Vermont Yankee.Based on Review,Staff Finds No Immediate Safety Concerns Re near-term Operability of EDGsDesign basis earthquake
ML20203H90923 February 1998Notification of 980305 Meeting W/Utility in Rockville,Md to Discuss Vynpc Plans & Activities Re Containment Analysis, Bases for Maintaining Operations Related to Startup
ML20203A93217 February 1998Notification of Significant Licensee Meeting 98-17 W/Util on 980302 in King of Prussia,Pa to Discuss Apparent Violations in NRC Insp Rept 50-271/97-10 (EA-97-531)
ML20198L2228 January 1998Notification of 980112 Meeting W/Utility in Rockville,Md to Discuss Utility Plans & Activities Re Implementation of Torus Strainers at Vermont Yankee Nuclear Power Station. Meeting Cancelled
ML20198G14423 December 1997Notification of Meeting W/Vynpc on 980112 in Rockville,Md to Discuss Plans & Activities Re Implementation of Torus Strainers at Plant.Participants Listed.Agenda Encl
ML20217J51314 October 1997Notifies on 971103 Meeting W/Util in Rockville,Md to Discuss Util Plans & Activities Re Future Submittal on Imporved TSs for Plant
ML20236N4556 October 1997Submits Revised Response to Work Request Requesting Review of Region I Task Interface Agreement Re Interpretation of TSs at Vermont Yankee
ML20236N3578 September 1997Responds to Work Request Dtd 970804,requesting Review of Region I Task Interface Agreement Re Interpretation of TSs at Vermont Yankee,Revised Response
ML20216E9854 September 1997Notification of 970917 Meeting W/Vynp in Rockville,Md to Discuss Submittals & 970815 Re Implementation of ASME Code Case N560 at Vermont Yankee Nuclear Power StationLarge early release frequency
ML20236N27111 August 1997Discusses Work Request Requesting Review of Region I TIA Re Interpretation of TS at Vermont Yankee
ML20198K8523 July 1997Informs That Enforcement Action Not Appropriate for OI Rept 1-96-005, Discrimination Against Senior Engineer for Raising Concerns Over Design Change to Advanced Off Gas Sys, Because OI Did Not Substantiate Allegation
ML20198K83123 June 1997Forwards OI Rept of Investigation Re Discrimination Against Senior Engineer for Raising Concerns Over Design Change to Advanced Off Gas Sys,Case 1-96-005
ML20248L97519 May 1997Responds to 970519 Memo from H Eichenholtz.Informs That D Vito Also Spoke W/Alleger on 970516 Re Allegation 96-128/97-0066.Alleger Was Barely Coherent & Complained About Delays in NRC Followup.Encl Partially Deleted
ML20248L96716 May 1997Informs That Alleger Called on 970517 & Threatened to Talk to Public & Media Unless NRC Addressed All Issues in Favor of Alleger Re Allegation 96-128/97-0066
ML20138E20022 April 1997Notification of 970515 (Revised Date) Meeting W/Myaps in King of Prussia,Pennsylvania to Discuss Performance Improvements in Engineering Area:Design Basis Project;Sys Engineering Function;Other Process & Organization Lessons
ML20140D61817 April 1997Notification of 970514 Meeting Mn 97-45 W/Util in King of Prussia,Pa to Discuss Performance Improvements in Engineering Area,Design Basis Project,Sys Engineering Function & Other Process/Organization Lessons Learned
ML20198K68610 April 1997Submits Conversation W/H Eichenholz
ML20137P4017 April 1997Notification of 970430 Meeting W/Util in Rockville,Md to Discuss Analyses & Code Use Relative to Fuel Cycle 20
ML20137C14420 March 1997Notification of Meeting on 970326 W/Util in Rockville,Md to Discuss Continuous Improvement Initiatives for Vermont Yankee Nuclear Power Station
ML20135F78511 March 1997Notification of 970331 Meeting W/Licensee in Rockville,Md to Discuss Licensing Activities & Schedules for Vermont Yankee Nuclear Power Station
ML20136C1036 March 1997Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR