Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20216J67222 September 1999Forwards Copy of Memorandum ,received from La Robertson,Fema Region Iv,Re Summary of Disaster Initiated Review,Hurricane Floyd for Bnpp,Offsite Preparedness.Memo Accurately Reflects Issues Discussed During 990918 TelconSiren
ML20212C07615 September 1999Notification of 990930 Meeting with Firstenergy Nuclear Operating Co in Rockville,Md to Discuss Licensee Recent Submittal Requesting Five Percent Power Uprate
ML20211L3543 September 1999Notification of 990914 Meeting with Util in Southport,Nc to Discuss Brunswick Practices Re Protection of Threatened & Endangered Species of Sea Turtles Near Plant
ML20212J32023 June 1999Forwards Proposed Change to STSs for Review & Comment.Change Would Remove TS Requirements for ESF Features to Be Operable After Sufficient Radioactive Decay Has Occurred to Ensure Off Site Doses Remain Below SRP LimitsStroke time
Anticipated operational occurrence
Qualified Offsite Circuit
Fuel cladding
Recently irradiated fuel
Offsite Circuit
DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action20 April 1999Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action
ML20205P62714 April 1999Notification of 990428 Meeting with Util to Discuss Proposed Asset Transfer Between Duquesne Light Co & First Energy Nuclear Operating Co & Associated License Transfer of Beaver Valley Power Station Per 10CFR50.80
ML20205B88726 March 1999Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary
ML20204E28517 March 1999Requests Entry of Attached Draft Info Provided by CP&L on 990315,into Brunswick Steam Electric Plant Docket Files & Pdr.Info Pertains to Pending Request to Extend Electrical Bus Allowed Outage Time Submitted to NRC on 961101Temporary Modification
Incorporated by reference
Hardened vent
ML20207L6979 February 1999Notification of 990309 Meeting with Util in Rockville,Md to Discuss NRC Staff Questions Re Application to Amend BSEP TSs to Extend AOT for Specific Electrical Buses.Meeting Has Been Cancelled
ML20203C2499 February 1999Notification of 990309 Meeting with Util in Rockville,Md to Discuss NRC Staff Questions Re Application to Amend Brunswick Steam Electric Plant TSs to Extend Allowable Outage Time for Specific Electrical Buses
ML20199L05121 January 1999Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant
ML20198R8837 January 1999Forwards SER Accepting Licensee 971015 Request to Amend Perry Nuclear Power Plant TSs 5.2.2.e to Remove Reference to GL 82-12 & Require Administrative Controls Be Established Which Will Ensure Adequate Shift Coverage
ML20196D94530 November 1998Notification of 981204 Meeting with Centerior Svc Co in Rockville,Md to Discuss Proposed Revs to Licensing Basis for Feedwater Containment Isolation Valves
ML20195B8559 November 1998Notification of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Revisions to Licensing Basis for Feedwater Containment Isolation Valves
ML20155E08130 October 1998Notification of 981117 Meeting with CP&L in Rockville MD to Discuss NRC Staff Questions Re Application to Amend TSs to Extend Allowable Outage Time for Specific Electrical Buses
ML20238F8661 September 1998Forwards Licensee Revs to Svc List for Placing in PDR
ML20238F33431 August 1998Notification of 980915 Meeting W/Centerior Service Co in Rockville,Md to Discuss Licensing Submittal Based Upon Revised Accident Source Term That Deletes MSIV Leakage Control Sys & Relaxes MSIV Leakage Limits
ML20238F58628 August 1998Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages
ML20238F18628 August 1998Notification of 980910 Meeting W/Centerior Service Co in Rockville,Md to Discuss Proposed Revs to Licensing Basis for Feedwater Containment Isolation Valves
ML20248F4572 June 1998Notification of 980625 Meeting W/Util in Rockville,Md to Discuss Analytical Testing Bases for Mark III ECCS Suction Strainer
ML20198P7288 May 1998Discusses OI Rept 2-97-015 Re Brunwsick Alleged Discrimination Against Employee for Raising Concerns Re Environmental Qualification Program to Nrc.Oi Did Not Substantiate Allegation
ML20216D85514 April 1998Forwards Signed Original of Order Imposing Civil Monetary Penalty.Addl 5 Copies & Disk Encl,For Use.W/O Encl
ML20197B7836 March 1998Notification of 980331 Meeting W/Ceic in Rockville,Md to Discuss Proposed Testing Program for ECCS Suction Strainer. (Proprietary Info Will Be Discussed)
ML20217B8446 March 1998Notification of Cancellation of 980331 Meeting in Rockville, MD to Discuss Proposed Testing Program for ECCS Suction Strainer
ML20216B0964 March 1998Forwards SER Accepting 971117 Request for Approval of Alternative to Insp of RPV Circumferential Welds in Plant, Unit 1 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii)(A)(5) for Next Two Operating Cycles
ML20198R40516 January 1998Notification of 980128 Meeting W/Carolina Power & Light Co in Rockville,Md to Discuss NRC Staff Questions Re Brunswick Steam Electric Plant Conversion to Improved TSs
ML20197K11515 December 1997Notification of Meeting W/Cp&L on 980108 in Rockville,Md to Discuss Staff Questions Re Plant Conversions to Improved TSs
ML20199J69520 November 1997Notification of 971202 Meeting W/Util to Discuss NRC Staff Questions Re Licensee TS Amend Request to Support Hardware Upgrades to Control Building Ventilation Sys
ML20199J71920 November 1997Notification of 971205 Meeting W/Util to Discuss NRC Staff Questions Re Licensee Conversion to Improved TS
ML20199A32913 November 1997Forwards NRC Operator Licensing Exam Rept 50-440/97-309OL on 970825-30 w/as-given Written Exam
ML20199A30713 November 1997Forwards NRC Operator Licensing Exam Rept (Included Completed & Graded Tests) for Tests Administered During Wk of 970825Safe Shutdown
Squib
Job Performance Measure
Scram Discharge Volume
Earthquake
Fire Protection Program
Scaffolding
Power change
ML20236N39210 September 1997Discusses Closure of TIA 97-006 Re Vessel Disassembly W/O Secondary Containment Integrity Established for Brunswick Steam Electric Plant,Unit 1Shutdown Margin
Control of Heavy Loads
ML20217K82113 August 1997Notification of 970904 Meeting W/Util in Rockville,Md to Discuss Staff Questions Re Units 1 & 2 Conversion to Improved TSs
ML20217H8347 August 1997Notification of 970814 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Plant,Units 1 & 2 Conversion to Improved TSs
ML20217H8487 August 1997Notification of 970811 Meeting W/Util in Southport,Nc to Discuss Consultation Procedures Associated W/Endangered Species Act
ML20198G1127 August 1997Notification of 970908 Meeting W/Cp&L in Rockville,Md to Discuss Staff Questions Re Plant Conversion to Improved TSs
ML20198G1187 August 1997Notification of 970820 Meeting W/Cp&L in Rockville,Md to Discuss Staff Questions Re Plant Conversion to Improved TSs
ML20149L5411 August 1997Notification of 970806 Meeting W/Util in Rockville,Md to Discuss Status & Review Schedule for BSEP Conversion to Improved TSs
ML20149K89225 July 1997Notification of 970801 Meeting W/Cp&L in Rockville,Maryland to Discuss Status & Review Schedule for Various CP&L Licensing Actions Under NRC Review
ML20198P7129 July 1997Discusses OI Rept 2-96-036 Re Brunswick Steam Electric Plant Discrimination Against Engineer for Raising Technical Concerns About Equipment Qualification Practices.Also Encl, Viewgraphs Re Cpl EQ Program Reconstitution EffortPast operability
ML20138D84529 April 1997Notification of 970508 Meeting W/Clei in Rockville,Md to Discuss Priorities & Schedules of Licensing Issues for Plant
ML20147J22710 April 1997Forwards for Transmittal Notice of Proposed Merger for Perry Nuclear Power Plant,Unit 1
ML20136F97413 March 1997Notification of 970324 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md to Discuss Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept & to Discuss Acoustic Methodology Applied to Upper Lift Load
ML20135E4785 March 1997Notification of 970306 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md to Review Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept.Meeting Cancelled
ML20134Q12725 February 1997Notification of 970306 Meeting W/Util in Rockville,Md to Review Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept & to Discuss Acoustic Methodology Applied to Upper Lift Load Reduction
ML20198P66412 February 1997Submits Brunswick Responses to Recipient EQ Questions
ML20198P6195 February 1997Informs That Author Passed Along Brunswick Licensee Engineering Evaluation on Flexible Conduit & Conduit Seal Configuration to F Ashe of Eelb
ML20138J7675 February 1997Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register PersonnelGeneric Fundamentals Examination
ML20134P90126 November 1996Notification of 961204 Meeting W/Clei & Teco in Rockville,Md to Discuss Potential Submittals Concerning Proposed Merger of Centerior Energy Co & Oec
ML20134E91929 October 1996Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps