ML20198P619
Jump to navigation
Jump to search
| ML20198P619 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 02/05/1997 |
| From: | David Skeen NRC (Affiliation Not Assigned) |
| To: | Trimble D NRC (Affiliation Not Assigned) |
| Shared Package | |
| ML20198P464 | List: |
| References | |
| FOIA-99-32 NUDOCS 9901070094 | |
| Download: ML20198P619 (1) | |
Text
.
From:
A C / DA' lh To:
WNP3.DCT Do i 4 Tcimtle, atR /DRPi Date:
2/5/97 4:13pm
Subject:
BRUNSWlCK - EQ ISSUE
- Dave, I passed along the Brunswick licensee engineering evaluation on the flexible conduit and conduit seal configuration to Frank Ashe of EELB I also told him about the 4:00pm conference call.
He told me that EELB was also looking into another EQ issue at San Onofre concerning rad monitorlead wires. He willlet PECB know if it looks like we might need to develop a generic communication on these issues.
CC:
WNP6.FSA, RLD e
-I 9901070094 981221 h
ff i
_ _ _ _ _ _ _