ML20216B096

From kanterella
Jump to navigation Jump to search

Forwards SER Accepting 971117 Request for Approval of Alternative to Insp of RPV Circumferential Welds in Plant, Unit 1 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii)(A)(5) for Next Two Operating Cycles
ML20216B096
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/04/1998
From: Sullivan E
NRC (Affiliation Not Assigned)
To: Kuo P
NRC (Affiliation Not Assigned)
Shared Package
ML20216B103 List:
References
IEIN-97-063, IEIN-97-63, TAC-MA0345, TAC-MA345, NUDOCS 9803120411
Download: ML20216B096 (3)


Text

.

og

. -p g UNITED STATES o

g NUCLEAR REGULATORY COMMISSION o WASHINGTON, D.C. 30EeH001 ,yh

,m, March 4, 1998 MEMORANDUM TO: P. T. Kuo, Acting Director Project Directorate ll-1 j Division of Reactor Projects,1/ll FROM: Edmund J. Sullivan, Acting Chief Materials and Chemical Engineering Branch Division of Engineering

SUBJECT:

REQUEST FOR APPROVAL OF ALTERNATIVE TO INSPECTION OF REACTOR PRESSURE VESSEL CIRCUMFERENTIAL WELDS IN BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 (TAC NO. MA0345)

By [[letter::BSEP-97-0459, Requests Approval to Use Alternative Requirements for ISI Delineated in ASME Section XI Code Case N-535.Alternative Is Needed to Extend Third Period of Second ten-yr ISI Interval to Coincide W/End of Bsep,Unit 1,refueling Outage 11|letter dated November 17,1997]], Carolina Power & Light Company (CP&L or the licensee) requested NRC approval of an attemative reactor vessel weld examination pursuant to the provisions of 10 CFR 50.55a(a)(3)(i) and 10 CFR 50.55a(g)(6)(ii)(A)(5) for the Brunswick Steam Electric Plant (BSEP) Unit 1 for the next two operating cycles. CP&L has proposed inspections of essentially 100 percent of the longitudinal seem welds in the reactor pressure vessel (RPV) shell and essentially 0 percent of the RPV circumferential seam welds, which will result in partial examination (2 to 3 percent) of the circumferential welds at their points of intersection with the longitudinal welds.

These inspections were proposed as an attemative to the augmented examinations specifed in 10 CFR 50.55a(g)(6)(ii)(A)(2) for circumferential welds and as an attemative to the inservice inspection requirements for circumferential welds in the American Society of Mechanical Engineers (ASME) Code,Section XI,1980 Edition, through Winter 1981 Addenda, for circumferentialwelds.

In Information Notice (IN) 97-63, " Status of NRC Staffs Review of BWRVIP-05," the staff j indicated that it would consider such requests, when technically justified, from BWR licensees who are scheduled to perform inspections of the Boiling Water Reactor (BWR) RPV circumferential welds during the fall 1997 or spring 1998 outage seasons. BWRVIP-05  !

provides BWR Owners Group recommendations for RPV shell weld inspections. l The NRC staff has reviewed the licensee's request and concluded that the Brunswick Unit i RPV can be operated during the next two operating periods with an acceptable level of quality N and safety and the inspection of the circumferential welds can be delayed for two operating periods. Therefore, the proposed attemative is authorized pursuant to 10 CFR 50.55a(a)(3)(i).

l l

LONTACT: A. D. Lee, NRR (301) 415-2735

~

9803120411 900304 PDR ADOCK 05000325 G _

PDR

. Epi!IRill1111 Nac HLE CENTER CO

l 1

Further details regarding the stafs evaluation and conclusions are contained in the attached  !

Safety Evaluation. This : ienicrondum completes the staffs effort for TAC No. MA0345. )

Docket No.: 50-325

Attachment:

As stated l

cc: D. Trimble l

l l

l 1

i j

1 l

I l

e a

Further details regarding the staffs evaluation and conclusions are contained in the attached Safety Evaluation. This memorandum completes the staffs effort for TAC No. MA0345.

Docket No.: 50-325 l

Attachment:

As stated i

cc: D. Trimble DISTRIBUTION PUBLIC

! Pile Center 7; EMCB RF/PF BWSheron GClaines JRStrosnider BABoger JAZwolinski GMHolahan SFNewberry I

RCaruso MEMayfield EHackett MMitchell DOCUMENT NAME: G:\ LEE \REL_BRS1.WPD F l

To receive a copy of this document, indicate in tne box: "E" = Copy w#nclosure: "N" = No copy EMCB E EMCB g SF.XB EMC g SRXB:BC g EMCB:(A) g ADLeeIk CECarpenter KAKavanagh KRWichman TECollinrdh EJSullivan 2/h8 3/t /98 3/298 Mb 3Q/98 Oc3/98 3/ V/98 4TW 1

I I

l l