Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 512 December 2023License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5
L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles15 November 2023License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel CyclesSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Loop seal
High Radiation Area
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Coatings
Surveillance Frequency Control Program
Operability Determination
Exemption Request
Subsequent License Renewal
Earthquake
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Grace period
GOTHIC
Unidentified leakage
Accident Tolerant Fuel
Power Uprate
Affidavit
L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis11 October 2023License Amendment Request 277 Updated Spent Fuel Pool Criticality AnalysisSurveillance Frequency Control Program
Power Uprate
ML23275A1102 October 2023License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5Boric Acid
Shutdown Margin
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
Missed surveillance
Surveillance Frequency Control Program
Nonconservative Technical Specifications
Fuel cladding
Recently irradiated fuel
Power change
Power Uprate
ML23275A1112 October 2023Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Probabilistic Risk Assessment
Pressure Boundary Leakage
ML23275A1122 October 2023Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2Offsite Dose Calculation Manual
Surveillance Frequency Control Program
L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2 October 2023Enclosure 1: Contents of Improved Technical Specifications (ITS) SubmittalShutdown Margin
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Cyber Security
Surveillance Frequency Control Program
Safeguards Contingency Plan
License Renewal
Fire Protection Program
ML23275A1262 October 2023Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16Shutdown Margin
Packing leak
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Incorporated by reference
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Nonconservative Technical Specifications
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Fire Protection Program
ML23275A1142 October 2023Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4Anticipated operational occurrence
Fuel cladding
ML23275A1252 October 2023Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15
ML23275A1242 October 2023Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14Boric Acid
Shutdown Margin
Time to boil
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Control of Heavy Loads
Fuel cladding
Recently irradiated fuel
ML23275A1232 October 2023Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13Safe Shutdown
Shutdown Margin
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
Qualified Offsite Circuit
Surveillance Frequency Control Program
Battery sizing
Control of Heavy Loads
Recently irradiated fuel
Offsite Circuit
ML23275A1222 October 2023Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12Safe Shutdown
Unanalyzed Condition
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Operability Determination
Earthquake
Control of Heavy Loads
Recently irradiated fuel
Power change
ML23275A1212 October 2023Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Stroke time
Coatings
Surveillance Frequency Control Program
Process Control Program
Control of Heavy Loads
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
ML23275A1202 October 2023Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10Boric Acid
Shutdown Margin
Stroke time
Surveillance Frequency Control Program
Fuel cladding
Power Uprate
ML23275A1192 October 2023Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9Unanalyzed Condition
Boric Acid
Shutdown Margin
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Unidentified leakage
Power Uprate
ML23275A1182 October 2023Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8Safe Shutdown
Shutdown Margin
Anticipated operational occurrence
Post Accident Monitoring
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Fuel cladding
Recently irradiated fuel
ML23275A1172 October 2023Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7Anticipated operational occurrence
Missed surveillance
Surveillance Frequency Control Program
Fuel cladding
Power change
ML23275A1162 October 2023Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6Boric Acid
Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Fuel cladding
Power change
ML23275A1152 October 2023Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5Safe Shutdown
Time of Discovery
Fire Barrier
Tornado Missile
Internal Flooding
Incorporated by reference
Missed surveillance
Turbine Missile
Offsite Circuit
L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.28 June 2023Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.
L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 514 June 2023Subsequent License Renewal Application Revision 1, Supplement 5Coatings
Aging Management
Through-Wall Leakage
ML23095A0074 April 2023License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1431 Revision 5
L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis10 February 2023Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / NisCyber Security
Surveillance Frequency Control Program
Time Critical Operator Action
L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results17 January 2023Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors ResultsSafe Shutdown
Time Critical Operator Action
Exclusive Use
Affidavit
L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2 December 2022Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
Fukushima Dai-Ichi
Large early release frequency
Fire Protection Program
L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 24 October 2022Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2
L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 422 September 2022Subsequent License Renewal Application Revision 1, Supplement 4Aging Management
Subsequent License Renewal
ML22243A16226 August 2022Submittal of License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement ProjectHydrostatic
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Fire Protection Program
Very Early Warning Fire Detection
L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)26 August 2022License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)Probabilistic Risk Assessment
Fire Protection Program
L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal13 April 2022Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 SubmittalAging Management
L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 17 April 2022Subsequent License Renewal Application Revision 1 - Supplement 1Safe Shutdown
Boric Acid
Ultimate heat sink
Non-Destructive Examination
Fire Barrier
Coatings
Operating Basis Earthquake
Nondestructive Examination
Incorporated by reference
Aging Management
Foreign Material Exclusion
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
Biofouling
EVT-1
Pressure Boundary Leakage
Through-Wall Leakage
Fire Protection Program
Dissimilar Metal Weld
Unidentified leakage
Power Uprate
ML22010A0965 January 2022Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - MakarBoric Acid
Aging Management
Pressure Boundary Leakage
Through-Wall Leak
L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report12 October 2021Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report
ML21285A11112 October 2021Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report
ML21285A10812 October 2021Enclosure 1: St. Lucie Nuclear Plant, Units 1 and 2, Subsequent Licensee Renewal Application, Revision 1
ML21285A10712 October 2021Subsequent Licensee Renewal Application, Revision 1Weld Overlay
Aging Management
Subsequent License Renewal
ML21265A37223 September 2021Improved Technical Specifications Conversion, Volume 1, Revision 0, Application of Selection Criteria to the Turkey Point Nuclear Generating Station Unit 3 and Unit 4 Technical SpecificationsBoric Acid
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Probabilistic Risk Assessment
Pressure Boundary Leakage
ML21265A37722 September 2021Improved Technical Specifications Conversion, Volume 6, Revision 0, Section 3.1, Reactivity Control SystemsBoric Acid
Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Fuel cladding
Power Uprate
ML21265A38122 September 2021Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.5, Emergency Core Cooling Systems (ECCS)Boric Acid
Stroke time
Surveillance Frequency Control Program
ML21265A38222 September 2021Improved Technical Specifications Conversion, Volume 11, Revision 0, Section 3.6, Containment SystemsBoric Acid
Time of Discovery
High Radiation Area
Stroke time
Hydrostatic
Coatings
Condition Adverse to Quality
Surveillance Frequency Control Program
Fuel cladding
Power Uprate
ML21265A38722 September 2021Improved Technical Specifications Conversion, Volume 16, Revision 0, Section 5.0, Administrative ControlsShutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Incorporated by reference
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Liquid penetrant
Fire Protection Program
ML21265A37922 September 2021Improved Technical Specifications Conversion, Volume 8, Revision 0, Section 3.3, InstrumentationSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Surveillance Frequency Control Program
Recently irradiated fuel
Power Uprate
ML21265A38022 September 2021Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.4, Reactor Coolant Systems (RCS)Unanalyzed Condition
Boric Acid
Shutdown Margin
Non-Destructive Examination
Grab sample
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
Power Uprate
ML21265A38522 September 2021Improved Technical Specifications Conversion, Volume 14, Revision 0, Section 3.9, Refueling OperationsBoric Acid
Shutdown Margin
Time to boil
Surveillance Frequency Control Program
Fuel cladding
Recently irradiated fuel
ML21265A38422 September 2021Improved Technical Specifications Conversion, Volume 13, Revision 0, Section 3.8, Electrical Power SystemsSafe Shutdown
Shutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Qualified Offsite Circuit
Surveillance Frequency Control Program
Battery sizing
Recently irradiated fuel
Offsite Circuit
Continuous fire watch
Power Uprate
ML21265A38622 September 2021Improved Technical Specifications Conversion, Volume 15, Revision 0, Section 4.0, Design Features
L-2021-158, Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) Submittal22 September 2021Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) SubmittalSurveillance Frequency Control Program
ML21265A37322 September 2021Improved Technical Specifications Conversion, Volume 2, Revision 0, Determination of No Significant Hazards Considerations Generic ChangesOffsite Dose Calculation Manual
Surveillance Frequency Control Program