|
---|
Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles ML24150A2192024-05-29029 May 2024 (E-Mail) St. Lucie, Unit 2 - License Amendment Request, Updated Spent Fuel Pool Criticality Analysis - Acceptance Review L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis ML24005A2772024-02-20020 February 2024 Issuance of Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 ML23275A1112023-10-0202 October 2023 Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2022-175, Application to Adopt 10 CPR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 42022-09-22022 September 2022 Subsequent License Renewal Application Revision 1, Supplement 4 L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 ML21285A1082021-10-12012 October 2021 Enclosure 1: St. Lucie Nuclear Plant, Units 1 and 2, Subsequent Licensee Renewal Application, Revision 1 ML21285A1112021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicants Environmental Report L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary ML21215A3192021-08-0303 August 2021 Appendix E - Applicant'S Environmental Report for St. Lucie L-2021-192, Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-05-26026 May 2021 Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 L-2020-164, License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2020-12-21021 December 2020 License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2020-020, License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years2020-02-18018 February 2020 License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years L-2019-091, License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2019-10-0909 October 2019 License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2018-161, License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2018-12-20020 December 2018 License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2018-182, License Amendment Request Iodine Removal System Elimination2018-11-0909 November 2018 License Amendment Request Iodine Removal System Elimination L-2018-201, Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-0909 November 2018 Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-147, Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications2018-08-0202 August 2018 Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications L-2018-121, License Amendment Request to Reduce the Number of Control Element Assemblies2018-06-29029 June 2018 License Amendment Request to Reduce the Number of Control Element Assemblies 2024-09-27
[Table view] |
Text
St. Lucie Nuclear Plant Units 1 and 2 Dockets 50-335 and 50-389 L-2021-192 Enclosure 1 Page 1 of 6
ENCLOSURE 1
ST. LUCIE NUCLEAR PLANT UNITS 1 AND 2
SUBSEQUENT LICENSE RENEWAL APPLICATION
ENCLOSURES
SUMMARY
(REVISION 1)
St. Lucie Nuclear Plant Units 1 and 2 Dockets 50-335 and 50-389 L-2021-192 Enclosure 1 Page 2 of 6
ENCLOSURES
SUMMARY
St. Lucie Nuclear Plant Units 1 and 2 Subsequent License Renewal Application Enclosures Summary Affidavits Supporting Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 Attachment 1 CAW-21-5221, Affidavit for Westinghouse proprietary portions of LTR-SDA-21-021-P Rev. 2, dated September 16, 2021 (Enclosure 5 Attachment 1)
Attachment 2 CAW-21-5222, Affidavit for Westinghouse proprietary portions of LTR-SDA-II-20-31-P, Revision 3, dated September 16, 2021 (Enclosure 5 Attachment 2)
Attachment 3 MSLEF-LTR-001 Rev. 0, Affidavit for BWXT proprietary portions of MSLEF-SR-01-P, St. Lucie Unit l Replacement Steam Generator - Environmental Assisted Fatigue Report, dated July 16, 2021 (Enclosure 5 Attachment 3)
Attachment 4 No. 86-9329644-001, Affidavit for Framatome proprietary portions of Document No.
86-9329644-001, entitled, St. Lucie SLR CUFen Evaluations Summary, dated July 14, 2021 (Enclosure 5 Attachment 4)
Attachment 5 CAW-21-5189, Affidavit for Westinghouse proprietary portions of WCAP-18617-P, Revision 1, dated June 3, 2021 (Enclosure 5 Attachment 5)
Attachment 6 CAW-21-5223, Affidavit for Westinghouse proprietary portions of LTR-SDA-20-097-P, Rev. 3, dated Septemeber 16, 2021 (Enclosure 5 Attachment 6)
Attachment 7 CAW-21-5224, Affidavit for Westinghouse proprietary portions of LTR-SDA-20-104-P, Rev. 3, dated Septemeber 16, 2021 (Enclosure 5 Attachment 7)
Attachment 8 CAW-21-5225, Affidavit for Westinghouse proprietary portions of LTR-SDA-20-099-P Rev. 2, dated Septemeber 16, 2021 (Enclosure 5 Attachment 8)
St. Lucie Nuclear Plant Units 1 and 2 Dockets 50-335 and 50-389 L-2021-192 Enclosure 1 Page 3 of 6
ENCLOSURES
SUMMARY
Attachment 9 No. 86-9329645-000, Affidavit for Framatome proprietary portions of Document No 86-9329645-000, entitled, St. Lucie SLR Crack Growth Analysis Summary, dated July 14, 2021 (Enclosure 5 Attachment 9)
Attachment 10 LTR-SDA-II-20-31-P Rev. 3, Affidavit for Flowserve proprietary portions of LTR-SDA-II-20-31-P Rev. 3, dated September 28, 2021 (Enclosure 5 Attachment 2) St. Lucie Nuclear Plant Units 1 and 2 Subsequent License Renewal Application (Public Version)
Attachment 1 St. Lucie Nuclear Plant Units 1 and 2 Subsequent License Renewal Application (Public Version)
October 2021 Revision 1 Attachment 2 Appendix E Applicants Environmental Report Subsequent Operating License Renewal Stage St. Lucie Nuclear Plant Units 1 and 2 Non-proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)
Attachment 1 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal:
Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 Attachment 2 Westinghouse Report LTR-REA-21-2-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal:
Unit 2 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, June 7, 2021 Attachment 3 Westinghouse Report LTR-SDA-21-021-NP, Revision 2, St. Lucie Units 1&2 Subsequent License Renewal:
Reactor Pressure Vessel Supports Assessment, September 15, 2021 Attachment 4 Westinghouse Report WCAP-18609-NP, Revision 2, St. Lucie Units 1 & 2 Subsequent License Renewal:
Time-Limited Aging Analyses on Reactor Vessel Integrity, July 16, 2021 St. Lucie Nuclear Plant Units 1 and 2 Dockets 50-335 and 50-389 L-2021-192 Enclosure 1 Page 4 of 6
ENCLOSURES
SUMMARY
Attachment 5 Westinghouse Report LTR-SDA-II-20-32-NP, Revision 3, St. Lucie Units 1 & 2 Subsequent License Renewal: 80-Year Projected Transient Cycles, July 15, 2021 Attachment 6 Westinghouse Report LTR-SDA-II-20-31-NP, Rev. 3, St. Lucie Units 1 & 2 Subsequent License Renewal:
Primary Equipment and Piping Environmentally Assisted Fatigue Evaluations, September 14, 2021 Attachment 7 BWXT Report MSLEF-SR-01-NP, Revision 0, St.
Lucie Unit 1 Replacement Steam Generator Environmentally Assisted Fatigue Report (Non-Proprietary), July 16, 2021 Attachment 8 Framatome Document No. 86-9329647-000, St. Lucie SLR CUFen Evaluations Summary - Non Proprietary, July 15, 2021 Attachment 9 Structural Integrity Report No. 2001262.403, Revision 0, Summary of Fatigue Usage for Charging Nozzle at St. Lucie, Units 1 and 2 for Subsequent License Renewal, June 25, 2021 Attachment 10 Westinghouse Report WCAP-18617-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal:
Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis, June 3, 2021 Attachment 11 Westinghouse Report LTR-SDA-20-097-NP, Revision 3, St. Lucie Units 1 & 2 Subsequent License Renewal: Alloy 600 Half Nozzle Repair Flaw Evaluation, September 15, 2021 Attachment 12 Westinghouse Report LTR-SDA-20-104-NP, Rev. 3, St. Lucie Units 1&2 Subsequent License Renewal:
Evaluation of Time-Limited Aging Analysis of the Reactor Vessel Internals, September 14, 2021 Attachment 13 Westinghouse Report LTR-SDA-20-099-NP, Revision 2, St. Lucie Units 1&2 Subsequent License Renewal:
Task 9E RCP Casing Code Case N-481 Evaluation, September 14, 2021 St. Lucie Nuclear Plant Units 1 and 2 Dockets 50-335 and 50-389 L-2021-192 Enclosure 1 Page 5 of 6
ENCLOSURES
SUMMARY
Attachment 14 Structural Integrity Report No. 2001262.402, Revision 1, Flaw Tolerance Evaluation of St. Lucie Units 1 and 2 CASS Components for SLR, July 15, 2021 Attachment 15 Framatome Document No. 86-9329648-000, St. Lucie SLR Crack Growth Analysis Summary -
Non Proprietary, July 2, 2021 Attachment 16 Structural Integrity Report No. 2001262.401, Revision 1, Flaw Tolerance Evaluation of St. Lucie, Units 1 and 2 Surge Line Using ASME Code,Section XI, Appendix L for Subsequent License Renewal, July 15, 2021 10 CFR 2.390 Withheld Proprietary Documents
Attachment 1 Westinghouse Report LTR-SDA-21-021-P, Revision 2, St. Lucie Units 1&2 Subsequent License Renewal:
Reactor Pressure Vessel Supports Assessment, September 15, 2021 Attachment 2 Westinghouse Report LTR-SDA-II-20-31-P, Rev. 3, St. Lucie Units 1 & 2 Subsequent License Renewal:
Primary Equipment and Piping Environmentally Assisted Fatigue Evaluations, September 15, 2021 Attachment 3 BWXT Report MSLEF-SR-01-P, Revision 0, St. Lucie Unit 1 Replacement Steam Generator Environmentally Assisted Fatigue Report, July 16, 2021 Attachment 4 Framatome Document No. 86-9329644-001, St. Lucie SLR CUFen Evaluations Summary, July 15, 2021 Attachment 5 Westinghouse Report WCAP-18617-P, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal:
Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis, June 3, 2021 Attachment 6 Westinghouse Report LTR-SDA-20-097-P, Revision 3, St. Lucie Units 1 & 2 Subsequent License Renewal:
Alloy 600 Half Nozzle Repair Flaw Evaluation, September 16, 2021 St. Lucie Nuclear Plant Units 1 and 2 Dockets 50-335 and 50-389 L-2021-192 Enclosure 1 Page 6 of 6
ENCLOSURES
SUMMARY
Attachment 7 Westinghouse Report LTR-SDA-20-104-P, Rev. 3, St.
Lucie Units 1&2 Subsequent License Renewal:
Evaluation of Time-Limited Aging Analysis of the Reactor Vessel Internals, September 14, 2021 Attachment 8 Westinghouse Report LTR-SDA-20-099-P, Revision 2, St. Lucie Units 1&2 Subsequent License Renewal:
Task 9E RCP Casing Code Case N-481 Evaluation, September 15, 2021 Attachment 9 Framatome Document No. 86-9329645-000, St. Lucie SLR Crack Growth Analysis Summary, July 1, 2021