ML102150073

From kanterella
Jump to navigation Jump to search
License Amendment Request H09-02 to Relocate the Reactor Recirculation System Motor-Generator (MG) Set Scoop Tune Stop Setting Surveillance
ML102150073
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/20/2010
From: Mulligan P
State of NJ, Dept of Environmental Protection
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LAR H09-02
Download: ML102150073 (2)


Text

Starir of Njefti 3jrrsr DEPARTMENT OF ENVIRONMENTAL PROTECTION CHRIS CHRISTIE Governor Division of Environmental Safety and Health BOB MARTIN Radiation Protection and Release Prevention Element Commissioner KIM GUADAGNO Bureau of Nuclear Engineering Lt. Governor PO Box 415 Trenton, New Jersey 08625-0415 Phone: (609) 984-7700 Fax: (609) 984-7513 July 20, 2010 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Gentlemen:

Subject:

Hope Creek Generating Station (HCGS), Docket No. 50-354, License Amendment Request (LAR) H09-02§'. "License Amendment Request to Relocate the Reactor Recirculation System Motor-Generator (MG) Set Scoop Tube Stop Setting Surveillance" PSEG Nuclear LLC (PSEG) submitted the subject amendment request to the Nuclear Regulatory Commission (NRC) on July 30, 2009. The proposed amendment would relocate the Technical Specification surveillance requirements for the Reactor Recirculation System MG Set Scoop Tube Stop setpoints to the Technical Requirements Manual (TRM).

The New Jersey Department of Environmental Protection's Bureau of Nuclear Engineering (NJ BNE) reviewed the request in accordance with the requirements of 10 CFR 50.91(b). We have no comments. This was previously communicated to Mr. Rick Ennis, NRC Hope Creek Project Manager.

If you have any questions, please contact Jerry Humphreys at (609) 984-7469.

'Sincerely,-

Patrick Mulligan Manager Bureau of Nuclear Engineering New Jersey is an Equal Opportunity Employer, Printedon Recycled Paper and Recvclable

c: P. Baldauf, New Jersey DEP, Assistant Director N. McNamara, NRC Region I State Liaison Officer R. Ennis, NRC Hope Creek Project Manager B. Welling, NRC Senior Resident Inspector, Hope Creek M. Gaffney, PSEG Manager Hope Creek Regulatory Assurance C. Neely, PSEG Director Regulatory Affairs