ML23208A211 | 27 July 2023 | Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions | Shutdown Margin Reactor Vessel Water Level Packing leak Water Inventory Control Surveillance Frequency Control Program Pressure Boundary Leakage |
W3F1-2023-0035, Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program | 26 July 2023 | Application for Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program | Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program |
GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 6 June 2023 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Fukushima Dai-Ichi Tornado Missile Protection Surveillance Frequency Control Program Large early release frequency Tornado Missile Risk Evaluator |
GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 6 June 2023 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Reactor Vessel Water Level High Radiation Area Ultimate heat sink Tornado Missile Water Inventory Control Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Condition Adverse to Quality FLEX Tornado-Generated Missile Abnormal operational transient Fukushima Dai-Ichi Seismically rugged Tornado Missile Protection Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Tornado Missile Risk Evaluator Earthquake Recently irradiated fuel Offsite Circuit Fire Protection Program |
RBG-48143, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 27 February 2023 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Tornado Missile Protection Surveillance Frequency Control Program Large early release frequency Tornado Missile Risk Evaluator |
ML23033A049 | 1 February 2023 | Emergency Action Level (EAL) Technical Bases Document Revision 3 | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Stroke time Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Cyber Security FLEX Pressure and Temperature Limits Report Surveillance Frequency Control Program Scram Discharge Volume Process Control Program Earthquake Maintenance Rule Program Fuel cladding Pressure Boundary Leakage Fire Protection Program Grace period |
W3F1-2021-0061, Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual | 14 October 2021 | Supplement to License Amendment Request to Relocate Chemical Detection Systems Technical Specifications to Technical Requirements Manual | Surveillance Frequency Control Program Fire Protection Program |
ML21279A231 | 6 October 2021 | Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement | Shutdown Margin Packing leak Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
ML21266A161 | 23 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program Recently irradiated fuel |
W3F1-2021-0039, Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years | 25 August 2021 | Application for Technical Specification Change to Revise Pressure/Temperature and Low Temperature Overpressure Protection for 55 Effective Full Power Years | Hydrostatic |
W3F1-2021-0055, Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual | 20 August 2021 | Supplement to License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual | Boric Acid Surveillance Frequency Control Program |
ML21182A158 | 1 July 2021 | Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | Nondestructive Examination |
ML21175A362 | 24 June 2021 | Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions | Shutdown Margin Packing leak Surveillance Frequency Control Program |
RBG-48083, Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials | 15 June 2021 | Application to Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials | Anticipated operational occurrence |
ML21148A104 | 28 May 2021 | Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Surveillance Frequency Control Program |
W3F1-2021-0032, Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | 21 May 2021 | Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | Shutdown Margin Anticipated operational occurrence Coatings Cyber Security Surveillance Frequency Control Program Process Control Program Fuel cladding |
W3F1-2021-0027, Supplement to Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 8 April 2021 | Supplement to Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
W3F1-2021-0026, Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | 19 March 2021 | Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | |
ML21062A198 | 3 March 2021 | Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 | Surveillance Frequency Control Program |
W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B | 8 February 2021 | Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Hot Short Safe Shutdown High winds High Radiation Area Ultimate heat sink Mission time Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Tornado Generated Missile Thermoset Surveillance Frequency Control Program Large early release frequency Turbine Missile Offsite Circuit Fire Protection Program Fire Watch |
W3F1-2021-0002, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | 22 January 2021 | Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | |
RBG-48033, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 4 September 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level Stroke time Water Inventory Control Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Control of Heavy Loads Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | 23 July 2020 | License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System | Safe Shutdown Shutdown Margin Anticipated operational occurrence Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Coatings Cyber Security B.5.b Surveillance Frequency Control Program Process Control Program Fuel cladding Affidavit |
ML20091M363 | 31 March 2020 | Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test | Safe Shutdown High winds Mission time Tornado Missile Internal Flooding Probabilistic Risk Assessment Coatings Incorporated by reference FLEX Aging Management Tornado Generated Missile Fukushima Dai-Ichi Surveillance Frequency Control Program Foreign Material Exclusion Large early release frequency MELLLA Spent Fuel Pool Instrumentation Moisture barrier Pandemic COVID-19 Fuel cladding Scaffolding GOTHIC |
W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification | 12 March 2020 | Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification | |
CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 | 26 February 2020 | Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 | Safe Shutdown Surveillance Frequency Control Program |
GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies | 19 February 2020 | License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies | Safe Shutdown High winds Mission time Tornado Missile Internal Flooding Probabilistic Risk Assessment Coatings Incorporated by reference FLEX Aging Management Tornado Generated Missile Fukushima Dai-Ichi Surveillance Frequency Control Program Foreign Material Exclusion Large early release frequency MELLLA Spent Fuel Pool Instrumentation Moisture barrier Fuel cladding Scaffolding |
CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process | 24 January 2020 | Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process | Hydrostatic Surveillance Frequency Control Program |
CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 | 24 January 2020 | Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 | Safe Shutdown Offsite Circuit Backfit |
RBG-47983, Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. | 18 November 2019 | Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. | Reactor Vessel Water Level Water Inventory Control Incorporated by reference Surveillance Frequency Control Program |
GNRO-2019/00045, Emergency Plan, Revision 79 | 29 October 2019 | Emergency Plan, Revision 79 | |
W3F1-2019-0073, (Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements | 24 October 2019 | (Waterford 3) - License Amendment Request to Revise Technical Specification 3.8.1.1 Surveillance Requirements | Surveillance Frequency Control Program |
W3F1-2019-0062, License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual | 20 September 2019 | License Amendment Request to Relocate Boration Systems Technical Specifications to the Technical Requirements Manual | Boric Acid Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Power change |
W3F1-2019-0047, Application for Technical Specification Change to Control Room Air Conditioning System | 27 August 2019 | Application for Technical Specification Change to Control Room Air Conditioning System | Surveillance Frequency Control Program |
GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. | 13 June 2019 | Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. | Grace period |
ML19072A281 | 13 March 2019 | Supplement 1 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control | Water Inventory Control |
CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 | 7 March 2019 | Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 | Reactor Vessel Water Level Anticipated operational occurrence Surveillance Frequency Control Program Minimum Critical Power Ratio Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 | 31 January 2019 | Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 | Safe Shutdown Time of Discovery Incorporated by reference Missed surveillance Offsite Circuit |
GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation | 23 January 2019 | Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation | Shutdown Margin Anticipated operational occurrence Abnormal operational transient Fuel cladding Grace period |
RBG-47925, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | 20 December 2018 | Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | Water Inventory Control Surveillance Frequency Control Program Recently irradiated fuel |
RBG-47918, Removal of the Table of Contents from the Technical Specifications | 29 November 2018 | Removal of the Table of Contents from the Technical Specifications | Shutdown Margin High Radiation Area Ultimate heat sink Post Accident Monitoring Hydrostatic Scram Discharge Volume |
GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control | 23 October 2018 | Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control | Stroke time Water Inventory Control |
RBG-47906, Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 | 18 October 2018 | Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Operator Manual Action FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change Downpower Coast down |
RBG-47883, Amendment 1 to License Renewal Application | 2 August 2018 | Amendment 1 to License Renewal Application | Aging Management |
W3F1-2018-0043, Amendment 2 to License Renewal Application | 30 July 2018 | Amendment 2 to License Renewal Application | Aging Management |
RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | 24 July 2018 | Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | Surveillance Frequency Control Program Recently irradiated fuel |
RBG-47882, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | 10 July 2018 | Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | Surveillance Frequency Control Program Recently irradiated fuel |
W3F1-2018-0031, Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components | 13 June 2018 | Supplemental Information Supporting the License Amendment Request Regarding Use of the Tranflow Code for Determining the Pressure Drops Across the Steam Generator Secondary Side Internal Components | Design basis earthquake |
GNRO-2018/00029, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | 7 June 2018 | Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | Mission time Internal Flooding Probabilistic Risk Assessment |
W3F1-2018-0025, (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update | 17 May 2018 | (Waterford 3) - Supplemental Information Supporting the License Amendment Request Regarding Proposed Change to Technical Specification 3/4.7.4 for Ultimate Heat Sink Design Basis Update | Boric Acid Ultimate heat sink Mission time Tornado Missile Met Tower FLEX Tornado Missile Protection Earthquake |