RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | 28 May 2024 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | Safe Shutdown High winds Ultimate heat sink Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Tornado Missile Protection Large early release frequency Earthquake Turbine Missile Biofouling Failure to Scram Overspeed trip |
ML24129A135 | 8 May 2024 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-59 | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Tornado Missile Water Inventory Control Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Zebra Mussel Qualified Offsite Circuit FLEX B.5.b Fukushima Dai-Ichi Seismically rugged Surveillance Frequency Control Program Design basis earthquake Scram Discharge Volume Feedwater Controller Failure Large early release frequency Tornado Missile Risk Evaluator Flood Hazard Mitigation Strategies Assessment Earthquake Turbine Missile Fuel cladding Biofouling Offsite Circuit Seismic Walkdown Report Overspeed trip Subsequent actuation |
ML24108A010 | 30 April 2024 | Subsequent License Renewal Application | |
RS-24-029, Subsequent Operating License Renewal - Appendix E - Applicants Environmental Report | 29 February 2024 | Subsequent Operating License Renewal - Appendix E - Applicants Environmental Report | License Renewal |
RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | 25 May 2023 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Hydrostatic Surveillance Frequency Control Program |
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 3 October 2022 | Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | Reactor Vessel Water Level |
RS-22-066, License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times | 25 August 2022 | License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times | Anticipated operational occurrence |
RS-22-065, License Amendment Request Regarding Transition to GNF3 Fuel | 18 August 2022 | License Amendment Request Regarding Transition to GNF3 Fuel | Anticipated operational occurrence |
RS-22-064, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 | 8 June 2022 | License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 | Aging Management Earthquake Affidavit GNF3 Water rod |
RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 4 January 2022 | Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | Process Control Program Pressure Boundary Leakage |
ML21277A193 | 16 November 2021 | Enclosure 2, Draft Conforming License Amendments | Safe Shutdown Fire Barrier Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security Aging Management Annual Radioactive Effluent Release Report Local Leak Rate Testing Feedwater Heater Eddy Current Testing Safeguards Contingency Plan Preemption Authority License Renewal Subsequent License Renewal Fuel cladding Liquid penetrant Fire Protection Program Scaffolding Unidentified leakage Power Uprate |
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 27 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Stroke time Water Inventory Control Surveillance Frequency Control Program Operability Determination Control of Heavy Loads Fuel cladding Recently irradiated fuel Scaffolding Water hammer |
RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments | 25 March 2021 | Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments | Safe Shutdown Safety Limit Minimum Critical Power Ratio Fire Barrier Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security Aging Management Local Leak Rate Testing Feedwater Heater Eddy Current Testing Safeguards Contingency Plan Preemption Authority License Renewal Subsequent License Renewal Fuel cladding Liquid penetrant Fire Protection Program Coast down Unidentified leakage Power Uprate |
RS-21-021, License Amendment Request - Proposed Changes to the Dresden Nuclear Power Station Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition | 17 March 2021 | License Amendment Request - Proposed Changes to the Dresden Nuclear Power Station Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition | FLEX Abnormal operational transient Fukushima Dai-Ichi Design basis earthquake B.5.b Mitigating Strategies Exemption Request Earthquake Fuel cladding Minimum staff Fire Protection Program Siren |
ML21057A273 | 25 February 2021 | Application for Order Approving License Transfers and Proposed Conforming License Amendments | Decommissioning Funding Plan Exclusive Use Affidavit |
RS-21-016, Supplement to Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems | 29 January 2021 | Supplement to Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems | Hydrostatic Surveillance Frequency Control Program |
ML20323A254 | 18 November 2020 | Markup of Proposed Technical Specifications Bases Pages | Reactor Vessel Water Level Ultimate heat sink Water Inventory Control Qualified Offsite Circuit Surveillance Frequency Control Program Control of Heavy Loads Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 18 November 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
RS-20-132, License Amendment Request, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition | 29 October 2020 | License Amendment Request, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition | Safe Shutdown Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security Missed surveillance Abnormal operational transient Surveillance Frequency Control Program Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Feedwater Controller Failure Safeguards Contingency Plan License Renewal Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Fire Protection Program Unidentified leakage Water rod Operational leakage Loss of condenser vacuum |
RS-20-116, License Amendment Request - Proposed Changes to Unit 1 Technical Specifications Section 6.1, Responsibility, and Units 2 and 3 Technical Specifications 1.1, Definitions, and 5.0, Administrative | 24 September 2020 | License Amendment Request - Proposed Changes to Unit 1 Technical Specifications Section 6.1, Responsibility, and Units 2 and 3 Technical Specifications 1.1, Definitions, and 5.0, Administrative | Offsite Dose Calculation Manual Surveillance Frequency Control Program Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process | 30 April 2020 | License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program |
RS-20-025, Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls | 24 February 2020 | Supplement to Exelon Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls | High Radiation Area Deep Dose Equivalent |
RS-19-093, Secondary Containment Drawdown Analysis | 17 October 2019 | Secondary Containment Drawdown Analysis | GOTHIC |
RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions | 28 August 2019 | License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions | Safe Shutdown Fire Protection Program |
RS-19-069, License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) | 23 August 2019 | License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) | Safe Shutdown |
JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 27 June 2019 | Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | Fire Barrier Tornado Missile Internal Flooding Incorporated by reference High Energy Line Break Turbine Missile |
RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 25 June 2019 | Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Shutdown Margin Surveillance Frequency Control Program Pressure Boundary Leakage Unidentified leakage |
RS-19-054, Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control | 18 June 2019 | Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control | Reactor Vessel Water Level Stroke time Water Inventory Control Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit |
ML19036A586 | 21 March 2019 | Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements | Health Physics Network Severe Accident Management Guideline Minimum staff Fire Protection Program |
RS-18-134, Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits | 5 December 2018 | Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Abnormal operational transient |
RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | 1 November 2018 | Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | Safe Shutdown Post Accident Monitoring Offsite Circuit |
RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement | 15 June 2018 | Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement | Surveillance Frequency Control Program |
RS-18-032, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers | 25 April 2018 | Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers | |
RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) | 1 March 2018 | Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR) | Coatings Stress corrosion cracking Commercial Grade Fire Protection Program |
ML18053A183 | 31 January 2018 | Enclosure 4 - Dresden Units 1, 2 & 3 - Evaluation of Proposed Changes | Safe Shutdown Fitness for Duty Cyber Security Severe Accident Management Guideline Fuel cladding Minimum staff |
RS-18-021, Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | 31 January 2018 | Exelon Generation Co, LLC - License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | Minimum staff |
RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | 31 January 2018 | License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements | Minimum staff |
ML18053A173 | 31 January 2018 | Attachment 4A - Dresden Marked-up Emergency Plan EP-AA-1000 Pages | Safe Shutdown Fitness for Duty Health Physics Network Nuclear Accident Reporting System Severe Accident Management Guideline Minimum staff Potassium iodide |
ML18053A174 | 31 January 2018 | Attachment 4B - Dresden Clean Emergency Plan EP-AA-1000 Pages | Nuclear Accident Reporting System Severe Accident Management Guideline Minimum staff Potassium iodide |
RS-17-174, Additional Supplement to Dresden Nuclear Power Station, Units 2 and 3 - Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | 21 December 2017 | Additional Supplement to Dresden Nuclear Power Station, Units 2 and 3 - Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | Water Inventory Control |
RS-17-173, Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | 20 December 2017 | Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | Water Inventory Control |
RS-17-137, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | 8 November 2017 | Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements | Shutdown Margin Surveillance Frequency Control Program Recently irradiated fuel |
RS-17-060, Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 3 May 2017 | Request for License Amendment to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | Safe Shutdown Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Aging Management Fukushima Dai-Ichi Surveillance Frequency Control Program Local Leak Rate Testing Large early release frequency Excess Flow Check Valve Integrated leak rate test Severe Accident Management Guideline Moisture barrier License Renewal Power Uprate |
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | 28 March 2017 | Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process | Safe Shutdown Time of Discovery Missed surveillance |
RS-17-029, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 10 February 2017 | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. | Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Stroke time Water Inventory Control Post Accident Monitoring Operating Basis Earthquake Squib Qualified Offsite Circuit Surveillance Frequency Control Program Scram Discharge Volume Power-Operated Valves Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Scaffolding |
ML16280A402 | 6 October 2016 | License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. | Shutdown Margin Reactor Vessel Water Level Packing leak High Radiation Area Stroke time Hydrostatic Squib Surveillance Frequency Control Program Excess Flow Check Valve Power Operated Valves Pressure Boundary Leakage Recently irradiated fuel Power change Unidentified leakage Water hammer |
RS-16-199, Supplement to Request for License Amendment Regarding Transition to Areva Fuel | 28 September 2016 | Supplement to Request for License Amendment Regarding Transition to Areva Fuel | Post Accident Monitoring Surveillance Frequency Control Program |
ML16209A218 | 26 July 2016 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. | Shutdown Margin Reactor Vessel Water Level Packing leak High Radiation Area Stroke time Hydrostatic Squib Incorporated by reference Missed surveillance Surveillance Frequency Control Program Excess Flow Check Valve Power Operated Valves Pressure Boundary Leakage Recently irradiated fuel Power change Unidentified leakage Water hammer |
RS-16-105, Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel | 26 April 2016 | Supplemental Information in Support of Request for License Amendment Regarding Transition to Areva Fuel | |
RS-16-035, County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings | 3 February 2016 | County, and Quad Cities - Request for License Amendment to Address Secondary Containment Access Openings | Surveillance Frequency Control Program |