Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000282/2023004 | 1 February 2024 | Integrated Inspection Report 05000282/2023004 and 05000306/2023004 | |
ML23356A123 | 29 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) | |
ML24024A072 | 24 January 2024 | Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML24022A117 | 23 January 2024 | Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations | |
ML24017A018 | 19 January 2024 | Confirmation of Initial License Examination | |
ML23356A003 | 17 January 2024 | Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) | Pressure and Temperature Limits Report |
ML24012A242 | 16 January 2024 | Acceptance of Requested Licensing Action License Transfer Request | |
L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, | 2 January 2024 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, | |
ML23236A004 | 27 December 2023 | Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme | Exemption Request Minimum staff Overexposure |
ML23355A124 | 26 December 2023 | Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements | Cyber Security |
ML23192A077 | 26 December 2023 | Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance | |
ML23263A977 | 22 December 2023 | Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation | Ultimate heat sink Probabilistic Risk Assessment FLEX B.5.b Tornado Generated Missile Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Exemption Request Earthquake Control of Heavy Loads Fuel cladding Accidental discharge Grace period Fatality Seismic Walkdown Report |
ML23191A522 | 22 December 2023 | Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) | |
ML23354A260 | 21 December 2023 | Reference Simulator Inspection Request for Information | |
IR 07200010/2023401 | 20 December 2023 | Independent Spent Fuel Storage Installation Security Inspection Report 07200010/2023401 | |
L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report | 20 December 2023 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report | Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report |
L-23-019, Proof of Financial Protection 10 CFR 140.15 | 18 December 2023 | Proof of Financial Protection 10 CFR 140.15 | |
ML23349A057 | 15 December 2023 | and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota | |
ML23215A167 | 15 December 2023 | Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 | |
PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations | 14 December 2023 | License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations | |
IR 05000282/2023401 | 13 December 2023 | Security Baseline Inspection Report 05000282/2023401 and 05000306/2023401 | Fitness for Duty |
PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements | 12 December 2023 | Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements | Cyber Security |
PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments | 6 December 2023 | Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments | Cyber Security Safeguards Contingency Plan License Renewal Exemption Request Subsequent License Renewal Fire Protection Program Affidavit |
L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | 5 December 2023 | Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
ML23319A318 | 15 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
ML23304A163 | 15 November 2023 | Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Revise SR 3.8.1.2 Note 3 | |
L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point | 13 November 2023 | Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point | |
IR 05000282/2023003 | 8 November 2023 | Integrated Inspection Report 05000282/2023003 and 05000306/2023003 | Shutdown Margin Past operability Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program Coast down |
ML23311A357 | 7 November 2023 | Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2. Cycle 33. Revision 0 | Shutdown Margin Power Uprate Measurement Uncertainty Recapture |
ML23291A440 | 3 November 2023 | Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations | Exemption Request |
ML23285A306 | 12 October 2023 | Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant | Safe Shutdown Health Physics Network Offsite Dose Calculation Manual Earthquake Minimum staff Grace period Integrated Public Alert and Warning System Siren |
IR 05000255/2023003 | 4 October 2023 | NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant | High Radiation Area Offsite Dose Calculation Manual Met Tower |
ML23275A001 | 2 October 2023 | Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant | |
ML23270B902 | 29 September 2023 | Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report | Pressure and Temperature Limits Report License Renewal |
L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | 28 September 2023 | License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 | 28 September 2023 | Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 | Offsite Dose Calculation Manual FLEX Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report License Renewal Exemption Request Fuel cladding Biofouling Environmental Justice Siren |
PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations | 28 September 2023 | Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations | |
ML23265A253 | 26 September 2023 | Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report | Pressure and Temperature Limits Report License Renewal |
ML23262B037 | 19 September 2023 | Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports | |
ML23256A168 | 13 September 2023 | Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection |