Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000282/20230041 February 2024Integrated Inspection Report 05000282/2023004 and 05000306/2023004
ML23356A12329 January 2024Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)
ML24024A07224 January 2024Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
ML24022A11723 January 2024Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations
ML24017A01819 January 2024Confirmation of Initial License Examination
ML23356A00317 January 2024Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)Pressure and Temperature Limits Report
ML24012A24216 January 2024Acceptance of Requested Licensing Action License Transfer Request
L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2 January 2024Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,
ML23236A00427 December 2023Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level SchemeExemption Request
Minimum staff
Overexposure
ML23355A12426 December 2023Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan RequirementsCyber Security
ML23192A07726 December 2023Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance
ML23263A97722 December 2023Exemption from Certain Emergency Planning Requirements and Related Safety EvaluationUltimate heat sink
Probabilistic Risk Assessment
FLEX
B.5.b
Tornado Generated Missile
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Exemption Request
Earthquake
Control of Heavy Loads
Fuel cladding
Accidental discharge
Grace period
Fatality
Seismic Walkdown Report
ML23191A52222 December 2023Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032)
ML23354A26021 December 2023Reference Simulator Inspection Request for Information
IR 07200010/202340120 December 2023Independent Spent Fuel Storage Installation Security Inspection Report 07200010/2023401
L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report20 December 2023Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits ReportHydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
L-23-019, Proof of Financial Protection 10 CFR 140.1518 December 2023Proof of Financial Protection 10 CFR 140.15
ML23349A05715 December 2023and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota
ML23215A16715 December 2023Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3
PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations14 December 2023License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations
IR 05000282/202340113 December 2023Security Baseline Inspection Report 05000282/2023401 and 05000306/2023401Fitness for Duty
PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements12 December 2023Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan RequirementsCyber Security
PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments6 December 2023Application for Order Consenting to Transfer of Control of License and Approving Conforming License AmendmentsCyber Security
Safeguards Contingency Plan
License Renewal
Exemption Request
Subsequent License Renewal
Fire Protection Program
Affidavit
L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 35 December 2023Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3Safe Shutdown
Surveillance Frequency Control Program
Offsite Circuit
ML23319A31815 November 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
ML23304A16315 November 2023Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Revise SR 3.8.1.2 Note 3
L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point13 November 2023Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point
IR 05000282/20230038 November 2023Integrated Inspection Report 05000282/2023003 and 05000306/2023003Shutdown Margin
Past operability
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
Coast down
ML23311A3577 November 2023Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2. Cycle 33. Revision 0Shutdown Margin
Power Uprate
Measurement Uncertainty Recapture
ML23291A4403 November 2023Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power OperationsExemption Request
ML23285A30612 October 2023Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating PlantSafe Shutdown
Health Physics Network
Offsite Dose Calculation Manual
Earthquake
Minimum staff
Grace period
Integrated Public Alert and Warning System
Siren
IR 05000255/20230034 October 2023NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear PlantHigh Radiation Area
Offsite Dose Calculation Manual
Met Tower
ML23275A0012 October 2023Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant
ML23270B90229 September 2023Review of Reactor Vessel Material Surveillance Program Capsule N Technical ReportPressure and Temperature Limits Report
License Renewal
L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 328 September 2023License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3Safe Shutdown
Surveillance Frequency Control Program
Offsite Circuit
PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.8228 September 2023Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82Offsite Dose Calculation Manual
FLEX
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
License Renewal
Exemption Request
Fuel cladding
Biofouling
Environmental Justice
Siren
PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations28 September 2023Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations
ML23265A25326 September 2023Review of Reactor Vessel Material Surveillance Program Capsule N Technical ReportPressure and Temperature Limits Report
License Renewal
ML23262B03719 September 2023Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports
ML23256A16813 September 2023Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection