RS-23-121, Sixth Ten-Year Interval Inservice Testing Program | 30 November 2023 | Sixth Ten-Year Interval Inservice Testing Program | Safe Shutdown Packing leak High Radiation Area Grab sample Stroke time Squib Incorporated by reference Locked High Radiation Area Surveillance Frequency Control Program Scram Discharge Volume Excess Flow Check Valve Cold shutdown justification Power-Operated Valves Power Operated Valves |
RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 8 November 2023 | Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | Non-Destructive Examination Nondestructive Examination VT-2 |
RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 16 October 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | 12 October 2023 | Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | |
RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station | 7 September 2023 | Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station | Accident Tolerant Fuel |
RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | 30 August 2023 | Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | Shutdown Margin Surveillance Frequency Control Program |
RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR | 30 August 2023 | Application to Adopt TSTF-564, Safety Limit MCPR | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation | 21 August 2023 | Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation | Safe Shutdown Reactor Vessel Water Level Safe Shutdown Earthquake Internal Flooding Hydrostatic Earthquake Recently irradiated fuel |
RS-23-085, Supplemental Information Related to Request for Partial Site Release | 3 August 2023 | Supplemental Information Related to Request for Partial Site Release | |
RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | 16 June 2023 | Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times | 16 June 2023 | Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times | |
RS-23-073, Request for Partial Site Release | 7 June 2023 | Request for Partial Site Release | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | 25 May 2023 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Hydrostatic Surveillance Frequency Control Program |
RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel | 16 May 2023 | Supplement to License Amendment Request Regarding Transition to GNF3 Fuel | |
RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel | 17 April 2023 | Supplement to License Amendment Request Regarding Transition to GNF3 Fuel | |
RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | 23 March 2023 | Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | Decommissioning Funding Plan Authorized possession limits |
RS-23-041, Response to Request for Additional Information for Alternative Request RV-23H | 14 March 2023 | Response to Request for Additional Information for Alternative Request RV-23H | |
RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air | 1 March 2023 | Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Nonconservative Technical Specifications Fuel cladding |
RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 | 28 February 2023 | Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 | Fitness for Duty |
RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 | 31 January 2023 | Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 | Safe Shutdown Fitness for Duty Shutdown Margin Non-Destructive Examination Offsite Dose Calculation Manual Commercial Grade Dedication Safe Shutdown Earthquake Coatings Nondestructive Examination Temporary Modification Cyber Security Condition Adverse to Quality Aging Management Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Operability Determination License Renewal Maintenance Rule Program Fire Protection Program |
RS-23-004, Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request | 23 January 2023 | Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request | |
RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing | 13 January 2023 | Application to Adopt TSTF-332, ECCS Response Time Testing | Surveillance Frequency Control Program Scram Discharge Volume Pressure Boundary Leakage |
RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | 30 November 2022 | Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications | 9 November 2022 | Notice of Intent to Pursue Subsequent License Renewal Applications | |
RS-22-117, Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | 3 November 2022 | Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | |
RS-22-116, Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval | 1 November 2022 | Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval | Stroke time Power-Operated Valves |
RS-22-115, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | 19 October 2022 | Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors | |
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 3 October 2022 | Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | Reactor Vessel Water Level |
RS-22-107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station | 29 September 2022 | Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station | |
RS-22-066, License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times | 25 August 2022 | License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times | Anticipated operational occurrence |
RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans | 18 August 2022 | Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans | |
RS-22-065, License Amendment Request Regarding Transition to GNF3 Fuel | 18 August 2022 | License Amendment Request Regarding Transition to GNF3 Fuel | Anticipated operational occurrence |
RS-22-101, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval | 10 August 2022 | Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval | VT-2 |
RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock | 25 July 2022 | Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock | High winds |
RS-22-099, Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 | 19 July 2022 | Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 | Non-Destructive Examination Incorporated by reference Moisture barrier |
RS-22-082, Defueled Safety Analysis Report Update, Revision 11 | 22 June 2022 | Defueled Safety Analysis Report Update, Revision 11 | Safe Shutdown Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Zebra Mussel Emergency Lighting Process Control Program Earthquake Control of Heavy Loads Fuel cladding Fire Protection Program Backfit Siren |
RS-22-080, Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals | 9 June 2022 | Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals | VT-2 Incorporated by reference |
RS-22-064, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 | 8 June 2022 | License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 | Aging Management Earthquake |
RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling | 24 May 2022 | Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling | |
RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves | 24 May 2022 | Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves | High Radiation Area Hydrostatic Recently irradiated fuel |
RS-22-068, Constellation Radiological Emergency Plan Addendum Revision | 19 May 2022 | Constellation Radiological Emergency Plan Addendum Revision | |
RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan | 18 April 2022 | Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan | Scaffolding |
RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists | 12 April 2022 | Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists | |
RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock | 7 April 2022 | Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Tornado-Generated Missile Tornado Missile Protection Fuel cladding Recently irradiated fuel |
RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for | 4 April 2022 | Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V | |
RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | 25 March 2022 | Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | |
RS-22-046, Relief Requests Associated with the Sixth Inservice Inspection Interval | 25 March 2022 | Relief Requests Associated with the Sixth Inservice Inspection Interval | VT-2 Surveillance Frequency Control Program |
RS-22-042, Report on Status of Decommissioning Funding for Shutdown Reactors | 23 March 2022 | Report on Status of Decommissioning Funding for Shutdown Reactors | |
RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated | 23 February 2022 | Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P | Surveillance Frequency Control Program |