RA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report | 5 February 2024 | Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) | 10 January 2024 | Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) | |
RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX | 8 January 2024 | Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX | Packing leak Offsite Dose Calculation Manual Operating Basis Earthquake Exemption Request Earthquake Pressure Boundary Leakage Grace period Unidentified leakage Operational leakage |
RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval | 4 January 2024 | Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval | |
RA-24-0006, 10 CFR 50.54(q) Evaluation | 4 January 2024 | 10 CFR 50.54(q) Evaluation | |
RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation | 14 December 2023 | Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation | Finite Element Analysis Aging Management Stress corrosion cracking Affidavit |
RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency | 14 December 2023 | Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency | |
RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. | 12 December 2023 | Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. | Exemption Request Pressure Boundary Leakage Grace period Unidentified leakage Operational leakage |
RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 4 December 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Exemption Request |
RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 16 November 2023 | RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency | 16 November 2023 | Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency | Safe Shutdown Mission time Offsite Dose Calculation Manual Coatings Incorporated by reference Aging Management Local Leak Rate Testing Moisture barrier Recently irradiated fuel Scaffolding |
RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report | 16 November 2023 | End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report | Nondestructive Examination Flow Accelerated Corrosion |
RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) | 14 November 2023 | Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) | Boric Acid Shutdown Margin |
RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific | 6 November 2023 | Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific | Safe Shutdown Surveillance Frequency Control Program |
RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power | 2 November 2023 | Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power | Safe Shutdown High winds Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Qualified Offsite Circuit Incorporated by reference FLEX Fukushima Dai-Ichi Seismically rugged Design basis earthquake Large early release frequency Flooding Focused Evaluation Earthquake Commercial Grade Maintenance Rule Program Pandemic Turbine Missile COVID-19 Offsite Circuit Seismic Walkdown Report |
RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes | 1 November 2023 | Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes | Exemption Request Siren |
RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) | 12 October 2023 | Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) | Subsequent License Renewal |
RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area | 5 October 2023 | License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area | High Radiation Area Fuel cladding |
RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan | 29 September 2023 | Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan | Safe Shutdown Boric Acid Stroke time Incorporated by reference Missed surveillance Local Leak Rate Testing Large early release frequency Operability Determination Cold shutdown justification Power Operated Valves Scaffolding Grace period Exclusive Use Subsequent actuation Manual Operator Action |
RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) | 28 September 2023 | Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) | |
RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report | 25 September 2023 | Refuel 27 (C1 R27) Inservice Inspection (ISI) Report | |
RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals | 21 September 2023 | Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals | Safe Shutdown Unanalyzed Condition Non-Destructive Examination Nondestructive Examination Functionality Assessment Aging Management Stress corrosion cracking Eddy Current Testing License Renewal Subsequent License Renewal EVT-1 Power change Power Uprate Measurement Uncertainty Recapture Thermal fatigue |
RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes | 20 September 2023 | Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes | Met Tower Exemption Request |
RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 175 | 14 September 2023 | Registration for Use of General License Spent Fuel Cask Number 175 | |
RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology | 30 August 2023 | License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology | Safe Shutdown Earthquake Stress corrosion cracking License Renewal Fuel cladding Pressure Boundary Leakage Pressure boundary leak Unidentified leakage Affidavit Operational leakage |
RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks | 28 August 2023 | Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks | |
RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 | 23 August 2023 | Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 | |
RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 1 | 23 August 2023 | On-Shift Staffing Analysis (Ossa), Revision 1 | Safe Shutdown Severe Accident Management Guideline Fire Protection Program |
RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks | 22 August 2023 | Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks | |
RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-02 | 17 August 2023 | Reply to a Notice of Violation (NOV) 05000270/2023010-02 | Condition Adverse to Quality Significance Determination Process |
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 20 July 2023 | Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Non-Destructive Examination Weld Overlay Finite Element Analysis |
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 20 July 2023 | Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | Non-Destructive Examination |
RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) | 20 July 2023 | Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) | |
RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) | 18 July 2023 | Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) | Boric Acid Shutdown Margin |
RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | 12 July 2023 | Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule | License Renewal Subsequent License Renewal |
RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 | 10 July 2023 | Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 | |
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require | 7 July 2023 | Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require | Incorporated by reference Surveillance Frequency Control Program Operational leakage |
RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record | 28 June 2023 | 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record | Incorporated by reference |
RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) | 20 June 2023 | Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) | FLEX License Renewal Subsequent License Renewal Environmental Justice Power Uprate Measurement Uncertainty Recapture |
RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications | 19 June 2023 | License Amendment Application to Revise Control Room Cooling Technical Specifications | Post Accident Monitoring Enforcement Discretion Surveillance Frequency Control Program Recently irradiated fuel |
RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory | 7 June 2023 | Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory | |
RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 | 31 May 2023 | Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 | |
RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications | 31 May 2023 | License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications | Safe Shutdown Boric Acid High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Probabilistic Risk Assessment Incorporated by reference Locked High Radiation Area Surveillance Frequency Control Program Process Control Program |
RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | 30 May 2023 | Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | |
RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report | 18 May 2023 | Refuel 32 (O1R32) Steam Generator Tube Inspection Report | |
RA-23-0018, Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1 | 4 May 2023 | Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1 | Weld Overlay Nondestructive Examination Incorporated by reference Stress corrosion cracking Dissimilar Metal Weld |
RA-23-0105, Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core | 4 May 2023 | Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core | Boric Acid Shutdown Margin |
RA-23-0118, Cycle 29, Revision 1, Core Operating Limits Report (COLR) | 3 May 2023 | Cycle 29, Revision 1, Core Operating Limits Report (COLR) | Boric Acid Shutdown Margin |
RA-23-0117, Report of Changes to Duke Energy McGuire Emergency Plan Annex | 1 May 2023 | Report of Changes to Duke Energy McGuire Emergency Plan Annex | |
RA-23-0111, Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 27 April 2023 | Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | |