Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions17 January 2024Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions
CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-4711 January 2024Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47EVT-1
CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)10 January 2024Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)
CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability9 January 2024Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System OperabilityTime of Discovery
Fire Barrier
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Turbine Missile
CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)8 January 2024Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)Anticipated operational occurrence
Qualified Offsite Circuit
Surveillance Frequency Control Program
Offsite Circuit
CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation21 December 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation21 December 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)18 December 2023Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)Safe Shutdown
Anticipated operational occurrence
CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)13 December 2023Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)Boric Acid
Shutdown Margin
Anticipated operational occurrence
Surveillance Frequency Control Program
Process Control Program
Fuel cladding
CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan29 November 2023Submittal of Fifth 10-Year Interval Inservice Testing Program PlanSafe Shutdown
High Radiation Area
Stroke time
Anchor Darling
Incorporated by reference
Locked High Radiation Area
FLEX
B.5.b
Scram Discharge Volume
Large early release frequency
Excess Flow Check Valve
Power Operated Valves
Grace period
Weak link
CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions27 November 2023Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision20 September 2023Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision
CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-20 September 2023Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03Coatings
Surveillance Frequency Control Program
Fuel cladding
CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 645 September 2023Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64
CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)7 August 2023License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)Incorporated by reference
Pressure and Temperature Limits Report
CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2 August 2023Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)Coatings
Surveillance Frequency Control Program
Fuel cladding
CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills25 July 2023Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills
CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions18 July 2023Tennessee Valley Authority - Radiological Emergency Plan Revisions
CNL-23-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-473 July 2023American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47EVT-1
CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)28 June 2023Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)Safe Shutdown
Hydrostatic
Surveillance Frequency Control Program
Offsite Circuit
CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .26 June 2023Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .Offsite Dose Calculation Manual
CNL-23-046, Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal6 June 2023Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal
CNL-23-037, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Request1 June 2023Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative RequestsStroke time
VT-2
Incorporated by reference
Surveillance Frequency Control Program
CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out1 June 2023Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out
CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions16 May 2023Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure RevisionsOffsite Dose Calculation Manual
CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)4 May 2023Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)Safe Shutdown Earthquake
Operating Basis Earthquake
Pressure and Temperature Limits Report
Pressure Boundary Leakage
CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 4127 April 2023Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41Fitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
Cyber Security
Process Control Program
Fire Protection Program
Grace period
CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update27 April 2023Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update
CNL-23-034, 10 CFR 50.46 Annual Report26 April 202310 CFR 50.46 Annual Report
CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision24 April 2023Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure RevisionOffsite Dose Calculation Manual
CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions11 April 2023Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
CNL-23-012, Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)11 April 2023Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)
CNL-23-023, Annual Insurance Status Report30 March 2023Annual Insurance Status Report
CNL-23-018, Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540)30 March 2023Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540)Anticipated operational occurrence
Water Inventory Control
Surveillance Frequency Control Program
CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report29 March 2023TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report
CNL-23-022, Decommissioning Funding Status Report29 March 2023Decommissioning Funding Status Report
CNL-23-027, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524)29 March 2023Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524)
CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche20 March 2023Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu
CNL-23-019, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-3211 March 2023Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32Non-Destructive Examination
VT-2
Incorporated by reference
Pressure Boundary Leakage
CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 410 March 2023Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4Surveillance Frequency Control Program
CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions8 March 2023Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)27 February 2023Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)Surveillance Frequency Control Program
CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)31 January 2023Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)Surveillance Frequency Control Program
CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A30 January 2023Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-AFire Protection Program
CNL-23-011, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements18 January 2023Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting RequirementsNondestructive Examination
CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.124 January 2023Response to Request for Additional Information Request to Revise Technical Specification 3.4.12Anticipated operational occurrence
Pressure and Temperature Limits Report
CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements22 December 2022Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting RequirementsNondestructive Examination
CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions22 December 2022Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)20 December 2022License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)Incorporated by reference
Surveillance Frequency Control Program
CNL-22-090, Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval12 December 2022Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing IntervalSafe Shutdown
Stroke time
Incorporated by reference
Scram Discharge Volume
Weak link