IR 05000271/201200820 April 2012Official Exhibit - NYS000462-00-BD01 - IR 05000271-12-008; 1/9 - 13, 1/23 - 27, and 3/19 - 20/2012; Vermont Yankee Nuclear Power Station; Post Approval Site Inspection for License Renewal 1P71003.Safe Shutdown
Fire Barrier
Coatings
Aging Management
License Renewal
EVT-1
ML15331A15723 December 2011Official Exhibit - NYS000460-00-BD01 - Commitment Charge Process.
IR 05000271/201101122 December 2011Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities.License Renewal
ML08253039814 September 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-28-VY, VY EPRI Checworks Wear Rate Analysis Results Cycles 20 & 21 (2001)
ML08253030912 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-16-VY, INPO Report OE-17654 (Clinton)Through-Wall Leak
ML08234068012 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-UW_02, Curriculum Vitae of Ulrich WitteFinite Element Analysis
Fire Protection Program
ML08253030812 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-15-VY, INPO Report OE-20246 (Clinton)
ML08253030712 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-15-VY, INPO Report OE-20246 (Clinton)
ML08253030612 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-13-UY, INPO Report OE-17412 (Clinton)
ML08253027612 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-06-VY, VY Procedure EN-DC-315Non-Destructive Examination
Liquid penetrant
Scaffolding
ML08253027312 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-03-VY, Fitzpatrick CvAging Management
BVY 04-058, 2008-08/12-Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-04-VY Attachment 2 to Supplement 8 to VY EPU Application12 August 20082008-08/12-Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-04-VY Attachment 2 to Supplement 8 to VY EPU ApplicationSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Non-Destructive Examination
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Finite Element Analysis
Design basis earthquake
Earthquake
Hardened vent
Turbine Missile
Flow Induced Vibration
BVY 05-084, Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-05-VY, Attachment 6 to Supplement 33 to VY EPU Application12 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-05-VY, Attachment 6 to Supplement 33 to VY EPU ApplicationPower Uprate
ML08253016812 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-02-VY, Hoffman CvWeld Overlay
ML08252002312 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-06-VY, NUREG/CR-6583Boric Acid
Aging Management
Backfit
ML08233041612 August 2008Entergy Exhibit List - Appendix a, Entergy Nuclear Vermont Yankee LLC and Entergy Nuclear Operations Inc. July 2008 Evidentiary Hearing
ML08233041912 August 2008Vermont Yankee July 2008 Evidentiary Hearing, New England Coalition Exhibit ListAging Management
ML08249047312 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-29-VY, List of Drawings Provided to NEC in Discovery
ML08233041712 August 2008NRC Staff Exhibit List - Vermont Yankee Nuclear Power Station July 2008 Evidentiary Hearing
ML08249041412 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-02-VY, Fitzpatrick Jc
ML08233049812 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_35, NRC, Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont...
ML08234073412 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-UW_20, Vermont Yankee Nuclear Power Station, PP7028: Piping FAC Inspection Program - FAC Inspection Program Records for 2005 Refueling Outage. (Corrected)Weld Overlay
Temporary Modification
Through-Wall Leak
Through Wall Leak
ML08234073312 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-UW_15, L. E. Hochreiter, Data Collection of Pipe Failures Occurring in Stainless Steel and Carbon Steel Piping, Nuce 597D - Project 1 (April 2005) (Corrected)Boric Acid
Flow Induced Vibration
ML08253031012 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-17-VY, INPO Report OE-21421 (Dresden 3)
ML08253034512 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-08-VY, Flow-Accelerated Corrosion in Power PlantsWeld Overlay
ML08234067812 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-RH_02, Curriculum Vitae of Rudolf Hausler
ML08253036912 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-18-VY, NRC Exhibit NEC-JH_18 LRA A3 Fdw 02 at Lph Ppb
ML08253037012 August 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-19-VY, Effects of Chemistry on Corrosion-Erosion of Steels in Water and Wet Steam
ML08253031831 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Application Exhibit E4-43-VY, Dr. Horowitz'S Checworks Presentation
ML08233052523 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_43, PP7028 FAC Inspections 2004 Refueling Outage.High Radiation Area
Weld Overlay
Through Wall Leak
ML08249048123 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-39-VY, Vermont Yankee Transient Counting StatusHydrostatic
ML08253047023 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-14-VY, INPO Report OE-18478 (Clinton)
ML08253037523 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-29-VY, EPRI Checworks Wear Rate Cycle 22B (2003)
ML08253016923 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-03-VY, Lukens C V
ML08253037223 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-22-VY, Heat and Mass Transfer Downstream of Abrupt Nozzle Expansion in Turbulent Flow
ML08253027223 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-02-VY, Horowitz Cv
ML08253027423 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-04-VY, Section B.1.13 of VY LRAAging Management
ML08253032123 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-39-VY, Checworks v1.0G_Enhancements
ML08234067721 July 2008Vermont Yankee July 2008 Evidentiary Hearing-Intervenor Exhibit NEC-JH_71, Bignold, G.J. Et Al, Paper 1, Water Chemistry II, Bnes (1980): 5-18
ML08233042321 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_02, Curriculum Vitae of Joram Hopenfeld
ML08255040921 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-36-VY, Transcript of ACRS Meeting 03/06/08 (Excerpt)Finite Element Analysis
ML08253036321 July 2008Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-21-VY, INPO Report OE-20127 (Calvert Cliffs)Through Wall Leak
ML0823200362 June 2008Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhbit B, Approved Applications for Power Uprates -www.NRC.gov/reactors/operating/licensing/power-uprates/approved-applications.html
ML0823406792 June 2008Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-RH_05, Rudolf Hausler, Flow Assisted Corrosion (FAC) and Flow Induced Localized Corrosion: Comparison and DiscussionAging Management
ML08238094231 May 20082008/05/31-Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 1, NUREG-1907 Safety Evaluation Related to the License Renewal of Vermont Yankee Nuclear Power Station - Volume 1 (ML081430057) & Volume 2 (ML081430109) Combined (May 2
ML08238094131 May 20082008/05/31-Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 1, NUREG-1907 Safety Evaluation Related to the License Renewal of Vermont Yankee Nuclear Power Station - Volume 1 (ML081430057) & Volume 2 (ML081430109) Combined (May 2Safe Shutdown
Reactor Vessel Water Level
Loop seal
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Coatings
Nondestructive Examination
Emergency Lighting
Aging Management
Abnormal operational transient
Scram Discharge Volume
Excess Flow Check Valve
License Renewal
Earthquake
Maintenance Rule Program
Fire Protection Program
Siren
Power Uprate
ML08135016213 May 2008Vermont Yankee - Exhibit List of NRC Staff Initial Statement of Position on NEC Contentions 2A, 2B, 3 and 4
ML08175003812 May 2008Exhibits to Entergy'S Direct Testimony on NEC Contention 4 - Flow-Accelerated Corrosion Includes Exhibits E4-02 Through E4-29, Volume 1Safe Shutdown
Boric Acid
Fitness for Duty
High Radiation Area
Weld Overlay
Coatings
Nondestructive Examination
Aging Management
Liquid penetrant
Through-Wall Leak
Through Wall Leak
Scaffolding
ML08175003612 May 2008Exhibits to Entergy'S Direct Testimony on NEC Contention 2 - Environmentally Assisted Fatigue - Includes Exhibits E2-02 Through E2-20, Volume 1Boric Acid
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Finite Element Analysis
Aging Management
EVT-1
Dissimilar Metal Weld
Backfit
Power change
Flow Induced Vibration
ML08232001912 May 2008Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 2, Affidavit of Kenneth C. ChangAging Management
License Renewal
Flow Induced Vibration
Weak link
Power Uprate