Entergy Exhibit List - Appendix a, Entergy Nuclear Vermont Yankee LLC and Entergy Nuclear Operations Inc. July 2008 Evidentiary Hearing
ML082330416
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 08/12/2008
From:
- No Known Affiliation
To:
NRC/SECY/RAS
SECY RAS
References
06-849-03-LR, 50-271-LA, RAS M-258
Download: ML082330416 (9)


Text

Pks o>_0c_.; 0-n C (0

C Co Appendix A Na 0 G0 /) 7 Ni 0-9-m 0 0 0 Entergy Nuclear Vermont Yankee L.L.C. and Entergy Nuclear Operations Inc. > >-n (Vermont Yankee Nuclear Power Station). Docket No. 50-271-LA 0

July 2008 Evidentiary Hearing Entergy Exhibit List Party Witness/ Offered in Action Exh. Panel Description Evid.

  1. (date/page) Adm. Rej. Wdr.

E2-02 Fitzpatrick/Stevens Fitzpatrick CV 7/21/08 V (NEC 2A/2B) Tr. at 764 E2-03 Fitzpatrick/Stevens Thadani Memo 7/21/08 (NEC 2A/2B) Tr. at 764 NUREG/ CR-6260 (excerpt) 7/21/08 E2-04 Fitzpatrick/Stevens (NEC 2A/2B) Tr. at 764

E2-05 Fitzpatrick/Stevens Section X.M1 of GALL Report, Vol 2 7/21/08 (NEC 2A/2B) Tr. at 764 E2-06 Fitzpatrick/Stevens NUREG/CR-6583 7/21/08 V, (NEC 2A/2B) Tr. at 764 E2-07 Fitzpatrick/Stevens NUREG/CR- 5704 7/21/08 V" (NEC 2A/2B) Tr. at 764 7/21/08 E2-08 Fitzpatrick/Stevens Stevens CV V (NEC 2A/2B) Tr. at 764 4L1plý -\jký -0Z- 9"',

Party Witness/ Offered in Action Exh. Panel Description Evid.

  1. (date/page) Adm. Rej. Wdr.

E2-09 Fitzpatrick/Stevens VY LRA Amendment 35 7/21/08 ,

(NEC 2A/213) Tr. at 764 E2-10 Fitzpatrick/Stevens Calculation VY- 16Q-301 R 7/21/08 (NEC 2A/2B) Tr. at 764 Calculation VY- 16Q-302R0 7/21/08 E2-11 Fitzpatrick/Stevens (NEC 2A/2B) Tr. at 764 Calculation VY-16Q-303r0 (REDACTED) 7/21/08 E2-12 Fitzpatrick/Stevens (NEC 2A/2B) Tr. at 764 Calculation VY- 16Q-304R0 7/21/08.

E2-13 Fitzpatrick/Stevens (NEC 2A/2B) Tr. at 764 E2-14 Fitzpatrick/Stevens Calculation VY- 16Q-305r0 7/21/08 (NEC 2A/2B) Tr. at 764 E2-15 Fitzpatrick/Stevens Calculation VY- 16Q-306R0 7/21/08 ,

(NEC 2A/2B) Tr. at 764 E2-16 Fitzpatrick/Stevens Calculation VY-16Q-307r0 7/21/08 V/

(NEC 2A/2B) Tr. at 764 E2-17 Fitzpatrick/Stevens Calculation VY- 16Q-308R0 7/21/08 (NEC 2A/2B) Tr. at764 E2-18 Fitzpatrick/Stevens Calculation VY-1 6Q-309R1 7/21/08 /

(NEC 2A/2B) Tr. at 764 Calculation VY-1 6Q-31 OR1 7/21/08 ,

E2-19 Fitzpatrick/Stevens (NEC 2A/2B) Tr. at 764 2

Party Witness/ Offered in Action Exh. Panel Description Evid.

  1. (date/page) Adm. Rej. Wdr.

Calculation VY-16Q-311RO 7/21/08 E2-20 Fitzpatrick/Stevens (NEC 2A/2B) Tr. at 764 Calculation VY-1 6Q-401 r0 (REDACTED) 7/21/08 E2-21 Fitzpatrick/Stevens (NEC 2A/2B) Tr. at 764 E2-22 Fitzpatrick/Stevens Calculation VY-1 6Q-402r0 7/21/08 (NEC 2A/2B) Tr. at 764 E2-23 Fitzpatrick/Stevens Calculation VY-16Q-403rl 7/21/08, (NEC 2A/2B) Tr. at 764 Calculation VY-16Q-404rl (Report SIR-07-132-NPS) (REDACTED) 7/21/08 E2-24 Fitzpatrick/Stevens (NEC 2A/2B) Tr. at 764 Calculation VY-19Q-301rO 7/21/08 E2-25 Fitzpatrick/Stevens (NEC 2A/2B) Tr. at 764 E2-26 Fitzpatrick/Stevens Calculation VY-1 9Q-302r0 7/21/08 (NEC 2A/2B) Tr. at 764 E2-27 Fitzpatrick/Stevens Calculation VY-19Q-303r0 7/21/08 V, (NEC 2A/2B) Tr. at 764 E2-28 Fitzpatrick/Stevens VY LRA Amendment 34 7/21/08 V, (NEC 2A/2B) Tr. at 764 E2-29 Fitzpatrick/Stevens List of Drawings Provided to NEC in Discovery 7/21/08 (NEC 2A/2B) Tr. at 764 NUREG/CR-6909 7/21/08 E2-30 Fitzpatrick/Stevens (NEC 2A/2B) Tr. at 764 3

Party Witness/ Offered in Action Exh. Panel Description Evid.

  1. (datelpage) Adm. Rej. Wdr.

Fitzpatrick/Stevens Transcript of ACRS Meeting 02/07/2008 (Excerpt) 7/21/08 E2-31 (NEC 2A/2B) Tr. at 764 E2-32 Fitzpatrick/Stevens WRC Bulletin 487 "PVRC's Position on Environmental Effects on 7/21/08 V/

(NEC 2A/2B) Fatigue Life in LWR Applications" Tr. at 764 Excerpts from 2007 GE VY Feedwater Nozzle Inspection Report 7/21/08 E2-33 Fitzpatrick/Stevens (NEC 2A/2B) Tr. at 764 Excerpt from EPRI BWRVIP-120 Report - Non-Proprietary version of 7/21/08 E2-34 Fitzpatrick/Stevens (NEC 2A/2B) Chapter 13 Tr. at 764 E2-35 Fitzpatrick/Stevens VY LRA Amendment 33 7/21/08 /

(NEC 2A/2B) Tr. at 764 E2-36 Fitzpatrick/Stevens Transcript of ACRS Meeting 03/06/08 (Excerpt) .7/21/08 V, (NEC 2A/2B) Tr. at 764 E2-37 Fitzpatrick/Stevens VY ACRS Letter to Commission re VY License Renewal (3-20-2008) 7/21/08 (NEC 2A/2B) Tr. at 764 E2-39 Fitzpatrick/Stevens Vermont Yankee Transient Counting Status 7/24/08 (NEC 2A/2B) Tr. at 1457 E3-02 Hoffman/Lukens Hoffman CV 7/23/08 /

(NEC 3) Tr. at 1186.

E3-03 Hoffman/Lukens Lukens CV 7/23/08 V/

(NEC 3) Tr. at 1186 E3-04 Hoffman/Lukens Attachment 2 to Supplement 8 to VY EPU Application 7/23/08 "

(NEC 3) ___ _t 1_1 _

4

Party Witness/ Offered in Action Exh. Panel Description Evid.

  1. (date/page) Adm. Rej. Wdr.

I E3-05 Hoffman/Lukens Attachment 6 to Supplement 33 to VY EPU Application 7/23/08 V (NEC 3) Tr .t 11 RC%

E3-06 Hoffman/Lukens GE SIL 644 Rev. 1 7/23/08 V" (NEC 3) Tr nt 11 IR E3-07 Hoffman/Lukens VY Off-Normal Procedure ON 3178 7/23/08 V/

(NEC 3) Tr. at 1186 E3-08 Hoffman/Lukens Page IV B1-6 of GALL Report, Vol 2 7/23/08 V/

(NEC 3) Tr. at 1186 E3-09 Hoffman/Lukens GE SIL 644 Rev. 2 7/23/08 v/

(NEC 3) Tr. at 1186 E3-10 Hoffman/Lukens VY Operating Procedure OP 0631 7/23/08 v-(NEC 3) Tr. at 1186 E3-11 Hoffman/Lukens VY Procedure EN-OP-0 104 7/23/08 /

(NEC 3) Tr. at 1186 E3-12 Hoffman/Lukens VY-RPT-06-00006 re Reactor Vessel Internals Inspection Program 7/23/08 V-(NEC 3) Tr. at 1186 E3-13 Hoffman/Lukens VY 2004 Dryer Inspection Results Summary 7/23/08 V/

(NEC 3) Tr. at 1186 E3-14 Hoffman/Lukens VY 2005 Dryer Inspection Results Summary 7/23/08 V/

(NEC 3) Tr. at 1186 E3-15 Hoffman/Lukens VY 2007 Dryer Inspection Results Summary (Corrected) 7/23/08 v/

(NEC 3) _1 Tr. at 1186 5

Party Witness/ Offered in Action Exh. Panel Description Evid.

  1. __(date/page) Adm. Rej. Wdr.

E3-16 Hoffman/Lukens 2007 GE VY Steam Dryer Flaw Evaluation Report (excerpt) 7/23/08 (NEC 3) Tr nt11 A E4 - Horowitz/Fitzpatrick Horowitz CV 7/23/08 V/

02 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick Fitzpatrick CV- 7/23/08 V 03 (NEC 4) ___________________________ r it 1 AM __

E4 - Horowitz/Fitzpatrick Section B. 1.13 of VY LRA 7/23/08 "

04 (NEC 4) _Tr. at 1425 E4 - Horowitz/Fitzpatrick Section XI.M17 of GALL Report 7/23/08 V 05 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY Procedure EN-DC-315 7/23/08 v 06 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick EPRI Report NSAC_202LR3_050206 (non-proprietary version) 7/23/08 V 07 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick EPRI Flow-Accelerated Corrosion in Power Plants ("FAC Book") 7/23/08 V/

08 (NEC 4) (selected pages) (Corrected Tr. at 1425 E4 - Horowitz/Fitzpatrick Declaration of Neil Wilmshurst 7/23/08 V" 09 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY Engineering Report VY-RPT-08-0022 7/23/08 V/

10 (NEC 4) Tr: at. 1425 E4 - Horowitz/Fitzpatrick O Information Notice IN 86-106 (Surry) 7/23/08 V 11 (NEC 4) Tr.at1425 6

Party Witness/ Offered in Action Exh. Panel Description Evid.

  1. (datelpage) Adm. Rej. Wdr.

E4 - Horowitz/Fitzpatrick .01 Information Notice IN 87-36 (Trojan) 7/23/08 12 (NEC 4) Tr nt IA' E4 - Horowitz/Fitzpatrick INPO Report OE-i17412 (Clinton) 7/23/08 V 13 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick INPO Report OE-1 8478 (Clinton) 7/23/08 /

14 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick INPO Report OE-20246 (Clinton) 7/23/08 V 15 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick INPO Report OE-17654 (Clinton) 7/23/08 V/

"16 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick INPO Report OE-21421 (Dresden 3) 7/23/08 11/

17 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick NEC Exhibit NEC-JH 18 LRA A3 FDW 02 at LPH PPB 7/23/08 V" 18 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick Effects of Chemistry on Corrosion-Erosion of Steels in Water and Wet 7/23/08 V" 19 (NEC 4) Steam Tr. at 1425 E4 - Horowitz/Fitzpatrick INPO Report OE-15860 (Calvert Cliffs) 7/23/08 V/

20 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick INPO Report OE-20127 (Calvert Cliffs) 7/23/08 V 21 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick Heat and Mass Transfer Downstream of Abrupt Nozzle Expansion in 7/23/08 V 22 (NEC 4) Turbulent Flow Tr. at 1425 7

Party Witness/ Offered in Action Exh. Panel Description Evid.

  1. (datelpage) Adm. Rej. Wdr.

E4 - Horowitz/Fitzpatrick The Use of a Corrosion Process to Obtain Mass Transfer Data 7/23/088 /

23 (NEC 4) Tr 2t 1d _*)

E4 - Horowitz/Fitzpatrick Mihama Rupture Report (Final, March 2005) 7/23/08 ,/

24 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick Entergy Engineering Standard ENN-EP-S-005 7/23/08 ,/

25 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY QA Audit Report. QA-8-2004-VY-l1 7/23/08 "

26 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick EPRI Letter 2-28-2000P (PROPRIETARY) 7/23/08 ,/

27 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY EPRI CHECWORKS Wear Rate Cycles 20&21 (2001). 7/23/08 /

28 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY EPRI CHECWORKS WEAR RATE Cycle22B (2003) 7/23/08 /

29 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY EPRI CHECWORKS WEAR RATE Cycle25 (2006) 7/23/08 V/

30 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY Condition Report CR-VTY-2006-02699 7/23/08 V/

31 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY Engineering Report VY-RPT-05-00012-RO 7/23/08 /

32 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick EPRI Report NSAC-202L-R2 (PROPRIETARY) 7/23/08 /

33 (NEC 4) . Tr. at 1425 8

Party Witness/ Offered in Action Exh. Panel Description Evid.

  1. (datelpage) Adm. Rej. Wdr.

E4 - Horowitz/Fitzpatrick VY Procedure PP 7028 7/23/08 34 (NEC 4) -Tr nt 1 A?;

E4 - Horowitz/Fitzpatrick VY 2001 RFO FAC Inspection Report 7/23/08 35 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY 2002 RFO FAC Inspection Report 7/23/08 "

36 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY 2004 RFO FACInspection Report 7/23/08 37 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY 2005 RFO FAC Inspection Report 7/23/08 V/

38 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick CHECWORKS vl.OGEnhancements 7/23/08 "

39 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY FAC Inspection Location Worksheet 2004 RFO 7/23/08 "

40 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick VY FAC Small Bore Component Selection Review RevO 7/23/08 V" 41 (NEC 4) Tr. at 1425 E4 - Horowitz/Fitzpatrick FAC Small Bore FAC Small Bore Component Selection Review Revl 7/23/08 "

42 (NEC 4) Tr. at 1425 E4-43 Horowitz/Fitzpatrick Dr. Horowitz's CHECWORKS Presentation 7/23/08 "

(NEC 4) Tr. at 1425 9