July 2008 Evidentiary Hearing - Applicant Exhibit E2-39-VY, Vermont Yankee Transient Counting Status
ML082490481
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/23/2008
From:
- No Known Affiliation
To:
NRC/SECY/RAS
SECY RAS
References
06-849-03-LR, 50-271-LR, Entergy-Applicant-E2-39-VY, RAS M-301
Download: ML082490481 (1)


Text

k-K-S q - -?::, C) /

EXHIBIT E2-39 Vermont Yankee Transient Counting Status: July 23, 2008 No of Transient No. of Actual Transient Cycles Assumed in Cycles Experienced Event / Transient Description Analysis for 60 Years To-Date Boltup and Unbolt of Reactor Vessel Head 123 32 Hydrostatic Pressure or Leak Test t 120 33 Startup = Heatup at 100 degrees F/hr 300 92 Turbine Roll & Increase to Rated Power 300 92 Reduction to 75% Rated Power and Return to 10,000 143 Rated Power Reduction to 50% Rated Power 2,000 79 and Return to Rated Power Turbine Trip at 25% Power 10 1

Feedwater Heater Bypass 70 1

Scram - Loss of Feedwater Pumps Isolation 10 3

Valves Close (3 HPCI Injections per Event)

Reactor Overpressure with Delayed Scram -

1 0

Feedwater Stays on, Isolation Valves Open Scram - Single Relief or Safety Valve 1

0 Blowdown Scram -Turbine. Generator Trip, Feedwater 268.

63 Stays on, Isolation Valves Open & All other Scrams Improper Start of a Cold Recirculation Loop 1

0 Sudden Start of Pump in a Cold Recirculation 1

0 Loop Reduction to 0% Power/Cooldown = Shutdown 300 90 at 100°F/hr Hot Standby (Feedwater Injection) 300 33 ASME Code (Pre-service) Hydrostatic Test to 1

1 1,563 psig (One time only event during plant life only)