MONTHYEARIR 05000271/20120082012-04-20020 April 2012 Official Exhibit - NYS000462-00-BD01 - IR 05000271-12-008; 1/9 - 13, 1/23 - 27, and 3/19 - 20/2012; Vermont Yankee Nuclear Power Station; Post Approval Site Inspection for License Renewal 1P71003. ML15331A1572011-12-23023 December 2011 Official Exhibit - NYS000460-00-BD01 - Commitment Charge Process. IR 05000271/20110112011-12-22022 December 2011 Official Exhibit - NYS000459-00-BD01 - IR 05000271-11-011; 10/17/2011 - 12/11/2011; Vermont Yankee Nuclear Power Station; Review of License Renewal Activities. ML0825303982008-09-14014 September 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-28-VY, VY EPRI Checworks Wear Rate Analysis Results Cycles 20 & 21 (2001) ML0825303092008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-16-VY, INPO Report OE-17654 (Clinton) ML0823406802008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-UW_02, Curriculum Vitae of Ulrich Witte ML0825303082008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-15-VY, INPO Report OE-20246 (Clinton) ML0825303072008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-15-VY, INPO Report OE-20246 (Clinton) ML0825303062008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-13-UY, INPO Report OE-17412 (Clinton) ML0825302762008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-06-VY, VY Procedure EN-DC-315 ML0825302732008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-03-VY, Fitzpatrick Cv BVY 04-058, 2008-08/12-Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-04-VY Attachment 2 to Supplement 8 to VY EPU Application2008-08-12012 August 2008 2008-08/12-Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-04-VY Attachment 2 to Supplement 8 to VY EPU Application BVY 05-084, Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-05-VY, Attachment 6 to Supplement 33 to VY EPU Application2008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-05-VY, Attachment 6 to Supplement 33 to VY EPU Application ML0825301682008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-02-VY, Hoffman Cv ML0825200232008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-06-VY, NUREG/CR-6583 ML0823304162008-08-12012 August 2008 Entergy Exhibit List - Appendix a, Entergy Nuclear Vermont Yankee LLC and Entergy Nuclear Operations Inc. July 2008 Evidentiary Hearing ML0823304192008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing, New England Coalition Exhibit List ML0824904732008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-29-VY, List of Drawings Provided to NEC in Discovery ML0823304172008-08-12012 August 2008 NRC Staff Exhibit List - Vermont Yankee Nuclear Power Station July 2008 Evidentiary Hearing ML0824904142008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-02-VY, Fitzpatrick Jc ML0823304982008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_35, NRC, Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Amendment No. 229 to Facility Operating License No. DPR-28 Entergy Nuclear Vermont... ML0823407342008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-UW_20, Vermont Yankee Nuclear Power Station, PP7028: Piping FAC Inspection Program - FAC Inspection Program Records for 2005 Refueling Outage. (Corrected) ML0823407332008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-UW_15, L. E. Hochreiter, Data Collection of Pipe Failures Occurring in Stainless Steel and Carbon Steel Piping, Nuce 597D - Project 1 (April 2005) (Corrected) ML0825303102008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-17-VY, INPO Report OE-21421 (Dresden 3) ML0825303452008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-08-VY, Flow-Accelerated Corrosion in Power Plants ML0823406782008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-RH_02, Curriculum Vitae of Rudolf Hausler ML0825303692008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-18-VY, NRC Exhibit NEC-JH_18 LRA A3 Fdw 02 at Lph Ppb ML0825303702008-08-12012 August 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-19-VY, Effects of Chemistry on Corrosion-Erosion of Steels in Water and Wet Steam ML0825303182008-07-31031 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Application Exhibit E4-43-VY, Dr. Horowitz'S Checworks Presentation ML0823305252008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_43, PP7028 FAC Inspections 2004 Refueling Outage. ML0824904812008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-39-VY, Vermont Yankee Transient Counting Status ML0825304702008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-14-VY, INPO Report OE-18478 (Clinton) ML0825303752008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-29-VY, EPRI Checworks Wear Rate Cycle 22B (2003) ML0825301692008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E3-03-VY, Lukens C V ML0825303722008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-22-VY, Heat and Mass Transfer Downstream of Abrupt Nozzle Expansion in Turbulent Flow ML0825302722008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-02-VY, Horowitz Cv ML0825302742008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-04-VY, Section B.1.13 of VY LRA ML0825303212008-07-23023 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-39-VY, Checworks v1.0G_Enhancements ML0823406772008-07-21021 July 2008 Vermont Yankee July 2008 Evidentiary Hearing-Intervenor Exhibit NEC-JH_71, Bignold, G.J. Et Al, Paper 1, Water Chemistry II, Bnes (1980): 5-18 ML0823304232008-07-21021 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_02, Curriculum Vitae of Joram Hopenfeld ML0825504092008-07-21021 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E2-36-VY, Transcript of ACRS Meeting 03/06/08 (Excerpt) ML0825303632008-07-21021 July 2008 Vermont Yankee July 2008 Evidentiary Hearing - Applicant Exhibit E4-21-VY, INPO Report OE-20127 (Calvert Cliffs) ML0823200362008-06-0202 June 2008 Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhbit B, Approved Applications for Power Uprates -www.NRC.gov/reactors/operating/licensing/power-uprates/approved-applications.html ML0823406792008-06-0202 June 2008 Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-RH_05, Rudolf Hausler, Flow Assisted Corrosion (FAC) and Flow Induced Localized Corrosion: Comparison and Discussion ML0823809422008-05-31031 May 2008 2008/05/31-Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 1, NUREG-1907 Safety Evaluation Related to the License Renewal of Vermont Yankee Nuclear Power Station - Volume 1 (ML081430057) & Volume 2 (ML081430109) Combined (May 2 ML0823809412008-05-31031 May 2008 2008/05/31-Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 1, NUREG-1907 Safety Evaluation Related to the License Renewal of Vermont Yankee Nuclear Power Station - Volume 1 (ML081430057) & Volume 2 (ML081430109) Combined (May 2 ML0813501622008-05-13013 May 2008 Vermont Yankee - Exhibit List of NRC Staff Initial Statement of Position on NEC Contentions 2A, 2B, 3 and 4 ML0817500382008-05-12012 May 2008 Exhibits to Entergy'S Direct Testimony on NEC Contention 4 - Flow-Accelerated Corrosion Includes Exhibits E4-02 Through E4-29, Volume 1 ML0817500362008-05-12012 May 2008 Exhibits to Entergy'S Direct Testimony on NEC Contention 2 - Environmentally Assisted Fatigue - Includes Exhibits E2-02 Through E2-20, Volume 1 ML0823200192008-05-12012 May 2008 Vermont Yankee July 2008 Evidentiary Hearing - Staff Exhibit 2, Affidavit of Kenneth C. Chang 2012-04-20
[Table view] |
Text
ILP~ K->OS UNITED STATES CO~ NEC-JH_35 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 229 TO FACILITY OPERATING LICENSE NO. DPR-28 ENTERGY NUCLEAR VERMONT YANKEE, LLC AND ENTERGY NUCLEAR OPERATIONS, INC.
DOCKETED USNRC VERMONT YANKEE NUCLEAR POWER STATION August 12, 2008 (11:00am) DOCKET NO. 50-271 OFFICE OF SECRETARY RULEMAKINGS 1ND ADJUDICATIONS tTAFF Proprietary information pursuant to Title 10 of the Code of FederalRegulations Section 2.390 1! has been redacted from this document.
Redacted information is identified by blank space enclosed within double brackets.
.tI I OFFBWE by. AgcaIk~enl/m 4serve NRC Staff Other_
j Aft ~Th~m RPEJETED UWOIHCRM I
F6-l4ý -L~~oak bg -0 S
190 -
implementation of the proposed EPU. Based on this, the NRC staff concludes that spent fuel storage at VYNPS will continue to meet the requirements of draft GDC-40, 42, and 66 following implementation of the proposed EPU. Therefore, the NRC staff finds the proposed EPU acceptable with respect to spent fuel storage.
2.8.7 Additional Review Area - Methods Evaluation 2.8.7.1 Application of NRC-approved Analytical Methods and Codes The analyses supporting safe operation at EPU conditions are required to be performed using NRC-approved licensing methodology, analytical methods and codes. In general, the analytical methods and codes are assessed and benchmarked against measurement data, comparisons to actual nuclear plant test data and research reactor measurement data. The validation and benchmarking process provides the means to establish the associated biases and uncertainties. The uncertainties associated with the predicted parameters and the correlations modeling the physical phenomena are accounted for in the analyses. NRC-approved licensing methodology, topical reports and codes specify the applicability ranges. The generic licensing topical reports (LTR) covering specific analytical methods or code systems quantify the accuracy of the methods or the code used. The safety evaluation reports approving topical reports include restrictions that delineate the conditions that warrant specific actions, such as obtaining measurement data or obtaining further NRC approval. In general, the use of NRC-approved analytical methods is contingent upon application of these methods and codes within the ranges for which the data were provided and against which the methods were evaluated.
Thus, a plant-specific application does not entail review of the NRC-approved analytical methods and codes.
To implement the proposed EPU and maintain the current 18-month cycle, a higher number of maximum powered bundles are loaded into the core and the power of the average bundles is also increased, making the core radial power distribution flatter. Due to an increased two-phase pressure drop and higher coolant voiding, the flow in the maximum powered bundles decreases. This effect leads to a higher bundle power-to-flow ratio and higher exit void fraction.
Since the maximum powered bundles set the thermal limits, EPU operation reduces the margins to thermal limits.
Table 2.8.7-1 below shows the predicted operating conditions for the maximum powered bundles for VYNPS as shown in Table 6-2 of Attachment 3 to Reference 25. Figures 2.8.7-1 through 2.8.7-4 show plots for some of these parameters for VYNPS throughout the core cycle.
I4
- 191 -
Table 2.8.7-1 Ranges of Operational Experience Metric VYNPS Prediction
((
1]
As shown, the VYNPS maximum exit void fraction is 87% and the core average bundle exit void fraction is 76%.
2.8.7.2 Applicability of Neutronic Methods 2.8.7.2.1 Methods Review Topics In Enclosure 3 to a letter dated March 4, 2004, (Reference 69) GE provided its evaluation of the impact of operation at higher void conditions on all of GE's licensing methodologies. The generic evaluation was also based on core thermal-hydraulic conditions that bound the EPU conditions (void fraction 90% or greater). Specifically, operation with a large number of bundles operating at high in-channel void fractions could potentially affect the following topics:
- 1. Assumptions made in the generation of the lattice physics data that establish the neutronic feedback (see SE Section 2.8.7.2.2).
- 2. Accuracy of the fuel isotopics generated considering the method employed in the lattice physics (see SE Section 2.8.7.2.2).
- 3. Assumptions made in the generation of the neutronic parameters in assuming 0%
bypass voiding, although voiding is present during some transients (see SE
.1 Section 2.8.7.2.2).
- 4. Applicability of the thermal-hydraulic correlations used to model physical phenomena I1 (see SE Section 2.8.7.3).
j
.1