Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23310A036 | 9 November 2023 | International, Inc. - U.S. Nuclear Regulatory Commission Inspection Report 07201014/2023201 | Commercial Grade Dedication Nondestructive Examination Condition Adverse to Quality |
ML23145A175 | 12 September 2023 | NRC Choice Letter to Holtec International with Attached Safety Inspection Report, IR 72-1014/2022-201, December 12-15, 2022, Inspection of Holtec International in Camden, New Jersey (Docket Nos.: 72-1014, 72-1032) | Commercial Grade Dedication Nondestructive Examination Finite Element Analysis Liquid penetrant |
IR 05000293/2023401 | 31 August 2023 | NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) | Affidavit |
IR 05000293/2023002 | 4 August 2023 | NRC Inspection Report No. 05000293/2023002 | Grab sample Offsite Dose Calculation Manual |
ML23195A038 | 14 July 2023 | U.S. Nuclear Regulatory Commission Inspection Report No. 72-1014/2023-201 | |
IR 05000293/1957001 | 26 May 2023 | 635390- Amendment 8 Providence Imaging Center 50-29357-01/030-38077 | |
IR 05000293/2022004 | 15 February 2023 | NRC Inspection Report No. 05000293/2022004 | High Radiation Area Coatings Fire Protection Program |
IR 05000293/2022003 | 18 November 2022 | NRC Inspection Report No. 05000293/2022003 | High Radiation Area Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Chernobyl |
IR 05000293/2022002 | 12 August 2022 | NRC Inspection Report No. 05000293/2022002 | Fire Barrier Fire Protection Program |
IR 05000293/2022001 | 11 May 2022 | NRC Inspection Report No. 05000293/2022001 | High Radiation Area Locked High Radiation Area |
IR 05000293/2021004 | 9 February 2022 | NRC Inspection Report No. 05000293/2021004 | Hydrostatic COVID-19 |
IR 05000293/2021003 | 12 November 2021 | NRC Inspection Report No. 05000293/2021003 | Fire Barrier Hydrostatic COVID-19 Fire Protection Program |
ML21301A166 | 28 October 2021 | Inspection, NRC Inspection Report 07201014/2021201 | Tornado Missile Commercial Grade Dedication |
IR 05000293/2021002 | 10 August 2021 | NRC Innspection Report No. 05000293/2021002 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program COVID-19 |
ML21187A270 | 12 July 2021 | NRC Independent Spent Fuel Storage Security Inspection Report No. 07201044/2021401 | Coronavirus |
IR 05000293/2021402 | 12 July 2021 | Security Decommissioning Inspection Report 05000293/2021402 | Coronavirus COVID-19 |
IR 05000293/2021001 | 13 May 2021 | NRC Inspection Report No. 05000293/2021001, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station | COVID-19 |
IR 05000293/2021401 | 27 April 2021 | Security Decommissioning Inspection Report 05000293/2021401 | Coronavirus COVID-19 |
IR 05000293/2020004 | 22 February 2021 | NRC Inspection Report No. 05000293/2020004, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program COVID-19 |
IR 05000293/2020401 | 17 December 2020 | Security Decommissioning Inspection Report 05000293/2020401 Without OUO Enclosure (Public Cover Letter Only) | COVID-19 Affidavit |
ML20335A009 | 30 November 2020 | NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts | Hydrostatic Locked High Radiation Area Spent Fuel Pool Instrumentation COVID-19 Liquid penetrant Fire Protection Program |
IR 05000293/2020002 | 30 November 2020 | NRC Inspection Report No. 05000293/2020002 & 2020003, Holtec Decommissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts | Hydrostatic Locked High Radiation Area Spent Fuel Pool Instrumentation COVID-19 Liquid penetrant Fire Protection Program |
ML20262G981 | 14 September 2020 | NRC Form 591S - Safety Inspection Report and Compliance with Attached Inspector Notes, IR 0721014/2020201, August 10-13, 2020, Inspection of Holtec International'S Orrvilon Manufacturing Facility in Orrville, Ohio | |
ML20070P334 | 10 March 2020 | NRC Inspection Report No. 07201044/2019001, Holtec Decomissioning International, LLC, Pilgrim Nuclear Power Station, Plymouth, Massachusetts | Earthquake |
IR 05000293/1982001 | 3 January 2020 | David Paul Dba C.Q.C. Company; Termination; License 50-29382-01; Docket 030-38241; Control 616184 | |
ML19228A016 | 16 August 2019 | Letter to Holtec International - U.S. Nuclear Regulatory Commission Follow-Up Inspection Report No. 07201014/2019-201 and Notice of Violation (W/ Enclosures 1 and 2) | Condition Adverse to Quality |
IR 05000293/2019002 | 24 July 2019 | Integrated Inspection Report 05000293/2019002 and Assessment Follow-up Letter | |
IR 05000293/2019001 | 13 May 2019 | Integrated Inspection Report 05000293/2019001 | |
IR 05000293/2018006 | 4 March 2019 | Annual Assessment Letter for Pilgrim Nuclear Power Station (Report 05000293/2018006) and Confirmatory Action Letter Closure | |
IR 05000293/2018004 | 13 February 2019 | Integrated Inspection Report 05000293/2018004 and Independent Spent Fuel Storage Installation Report 07201044/2018201 | Safe Shutdown Reactor Vessel Water Level Internal Flooding Enforcement Discretion Temporary Modification Squib Functionality Assessment Operability Determination Fire Protection Program Downpower |
IR 05000293/2018013 | 23 January 2019 | Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018013 | Foreign Material Exclusion Operability Determination |
IR 05000293/2018501 | 6 December 2018 | Evaluated Emergency Preparedness Exercise Inspection Report 05000293/2018501 | |
ML18306A853 | 29 November 2018 | Holtec International; U.S Nuclear Regulatory Commission Inspection Report 07201014/2018201 | Commercial Grade Dedication Design basis earthquake Fuel cladding |
IR 05000293/2018015 | 21 November 2018 | Triennial Fire Protection Inspection Report 05000293/2018015 | Safe Shutdown Fire Barrier Hydrostatic Fire impairment Multiple Spurious Operation Emergency Lighting FLEX B.5.b Job Performance Measure Exemption Request Fire Protection Program |
IR 05000293/2018003 | 13 November 2018 | Integrated Inspection Report 05000293/2018003 and Independent Spent Fuel Storage Installation Inspection Report 07201014/2018001 | Safe Shutdown Ultimate heat sink Mission time Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
IR 05000293/2018012 | 1 November 2018 | Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018012 | Operability Determination Power change |
IR 05000293/2018011 | 9 October 2018 | Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018011 | Operability Determination |
IR 05000293/2018411 | 24 September 2018 | Baseline Security Inspection Report 05000293/2018411 | Affidavit |
IR 05000293/2018005 | 28 August 2018 | Assessment Follow-up Letter and Updated Inspection Plan (Inspection Report 05000293/2018005) | |
IR 05000293/2018002 | 14 August 2018 | Integrated Inspection Report 05000293/2018002 | Time of Discovery Fitness for Duty High Radiation Area Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination Fire Protection Program Power change |
IR 05000293/2018410 | 20 June 2018 | Baseline Security Inspection Report 05000293/2018410 (Letter Only) | Affidavit |
IR 05000293/2018010 | 13 June 2018 | Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2018010 | Functionality Assessment Condition Adverse to Quality Operability Determination |
IR 05000293/2018001 | 14 May 2018 | Integrated Inspection Report 05000293/2018001 | Time to boil Past operability Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
IR 05000416/2017014 | 12 March 2018 | Confirmatory Order, NRC Inspection Report 05000416/2017014, and NRC Investigation Reports 4-2016-004 and 4-2014-021 | Enforcement Discretion Exemption Request |
IR 05000293/2017006 | 28 February 2018 | Annual Assessment Letter for Pilgrim Nuclear Power Station (Reports 05000293/2017006, 05000293/2017402, and 05000293/2017501) | Fitness for Duty |
IR 05000293/2017004 | 14 February 2018 | Integrated Inspection Report 05000293/2017004 | Fire Barrier Internal Flooding Temporary Modification Functionality Assessment Significance Determination Process Job Performance Measure Operability Determination Siren Failure to Scram |
IR 05000293/2017010 | 1 February 2018 | Confirmatory Action Letter (EA-17-086) Follow-Up Inspection Report 05000293/2017010 | Functionality Assessment Operability Determination |
IR 05000293/2017009 | 21 December 2017 | Problem Identification and Resolution Inspection Report 05000293/2017009 | Time of Discovery Mission time Condition Adverse to Quality Significance Determination Process Operability Determination Maintenance Rule Program Operability Assessment |
IR 05000293/2017201 | 21 November 2017 | NRC Security Inspection Report 05000293/2017201 | Affidavit |
IR 05000293/2017003 | 14 November 2017 | Integrated Inspection Report 05000293/2017003 | Packing leak Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Enforcement Discretion Functionality Assessment Condition Adverse to Quality Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Large early release frequency Operability Determination Downpower Flow Induced Vibration Operability Assessment |