Issue date | Title | Topic | |
---|---|---|---|
ML23216A141 | 30 June 2023 | August 2023 RP Inspection Document Request | Offsite Dose Calculation Manual |
ML22251A368 | 9 September 2022 | Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000335 2022011, 05000389 2022011) and Request for Information (RFI) | Safe Shutdown Fitness for Duty Exemption Request Fire Protection Program |
ML22077A373 | 22 March 2022 | Review of the Spring 2021 Steam Generator Tube Inspection Report | |
IR 05000335/2017011 | 18 April 2017 | Final Significance Determination of a White Finding; NRC Inspection Report 05000335/2017011 | Probabilistic Risk Assessment Significance Determination Process Job Performance Measure Preliminary White Finding |
IR 05000335/2008007 | 18 April 2008 | IR 05000335-08-007, IR 05000389-08-007, and IR 07200061-08-001, on 02/25/2008 - 03/14/2008, for St. Lucie, Units 1 and 2, and ISFSI, Inspector Notes | Safe Shutdown High winds Non-Destructive Examination Commercial Grade Dedication Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Design basis earthquake Earthquake Control of Heavy Loads Fuel cladding Fire Protection Program |
IR 05000335/2007402 | 26 July 2007 | Transmittal Letter for St. Lucie Nuclear Plant - NRC Security Inspection Report 05000335/2007402 and 05000389/2007402 - SGI Removed | Affidavit |
ML070850110 | 22 March 2007 | NRC Inspection Report No. 05000335,389/2007401 | |
IR 05000335/2007001 | 1 March 2007 | Annual Assessment Letter - St. Lucie Nuclear Plant (NRC Inspection Report 05000335, 389/2007001) | |
IR 05000335/2006401 | 18 January 2007 | NRC Inspection Report 05000335-06-401 and 05000389-06-401 | Affidavit |
IR 05000335/2006007 | 24 November 2006 | IR 05000335-06-007, 05000389-06-007, Safeguards Information Removed | Affidavit |
IR 05000033/2006003 | 27 July 2006 | IR 0500033-06-003, 05000389-06-003, on 04/01/2006 - 06/30/2006, St. Lucie, Units 1 & 2 | Boric Acid High winds Ultimate heat sink Internal Flooding Enforcement Discretion Nondestructive Examination Foreign Material Exclusion Operability Determination Through-Wall Leak |
ML040160894 | 22 December 2003 | Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 | Safe Shutdown Fire Barrier Temporary Modification Emergency Lighting Fire Protection Program |
ML040120101 | 22 December 2003 | Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 | Safe Shutdown |
ML040120099 | 22 December 2003 | Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 | |
ML040090283 | 22 December 2003 | Undated Inspection Post-Inspection Debrief to Region II DRS Managers Regarding St. Lucie Triennial Fire Protection Inspection | Hot Short Safe Shutdown Fire Barrier Fire Protection Program |
ML040120104 | 4 April 2003 | Input for St Lucie Inspection Report 03-02 | |
IR 05000335/2002005 | 21 May 2002 | IR 05000335/2002-005 & 05000389/2002-005, St. Lucie Nuclear Plant, Inspection on 04/15/2002-04/25/2002 Related to Identification & Resolution of Problems. No Findings of Significance Identified | Probabilistic Risk Assessment Coatings Significance Determination Process Maintenance Rule Program |
ML020950884 | 5 April 2002 | IR 05000335/2002-006, St. Lucie Nuclear Power Plant, Inspection on 03/14/2002-04/03/2002 Related to Fire Protection Unresolved Item 50-335, 389/98-201-09 | Hot Short Safe Shutdown Fitness for Duty Fire Barrier Coatings Significance Determination Process Preliminary White Finding Fire Protection Program Fire Watch |
IR 05000335/2001007 | 7 March 2002 | IR 05000335/2001-007 & IR 05000389/2001-007 for Inspection on 02/01/2002 Related to Safety System Design & Performance Capability. No Violations Noted | Boric Acid Stroke time Internal Flooding Significance Determination Process Job Performance Measure |
IR 05000335/2001005 | 28 January 2002 | IR 05000335/2001-005 & IR 05000389/2001-005, St. Lucie, Units 1 & 2, Inspection on 09/30 - 12/29/2001 Related to Administrative & Engineering Controls. Non-cited Violation Noted | Boric Acid High Radiation Area Post Accident Monitoring Temporary Modification VT-2 Significance Determination Process Foreign Material Exclusion Pressure Boundary Leakage Downpower |