MONTHYEARML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML22251A3682022-09-0909 September 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000335 2022011, 05000389 2022011) and Request for Information (RFI) ML22077A3732022-03-22022 March 2022 Review of the Spring 2021 Steam Generator Tube Inspection Report IR 05000335/20170112017-04-18018 April 2017 Final Significance Determination of a White Finding; NRC Inspection Report 05000335/2017011 IR 05000335/20080072008-04-18018 April 2008 IR 05000335-08-007, IR 05000389-08-007, and IR 07200061-08-001, on 02/25/2008 - 03/14/2008, for St. Lucie, Units 1 and 2, and ISFSI, Inspector Notes IR 05000335/20074022007-07-26026 July 2007 Transmittal Letter for St. Lucie Nuclear Plant - NRC Security Inspection Report 05000335/2007402 and 05000389/2007402 - SGI Removed ML0708501102007-03-22022 March 2007 NRC Inspection Report No. 05000335,389/2007401 IR 05000335/20070012007-03-0101 March 2007 Annual Assessment Letter - St. Lucie Nuclear Plant (NRC Inspection Report 05000335, 389/2007001) IR 05000335/20064012007-01-18018 January 2007 NRC Inspection Report 05000335-06-401 and 05000389-06-401 IR 05000335/20060072006-11-24024 November 2006 IR 05000335-06-007, 05000389-06-007, Safeguards Information Removed IR 05000033/20060032006-07-27027 July 2006 IR 0500033-06-003, 05000389-06-003, on 04/01/2006 - 06/30/2006, St. Lucie, Units 1 & 2 ML0401608942003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0401201012003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0401200992003-12-22022 December 2003 Undated Input for St. Lucie Fire Protection Baseline Inspection on 03/10-14 and 24-28/2003 ML0400902832003-12-22022 December 2003 Undated Inspection Post-Inspection Debrief to Region II DRS Managers Regarding St. Lucie Triennial Fire Protection Inspection ML0401201042003-04-0404 April 2003 Input for St Lucie Inspection Report 03-02 IR 05000335/20020052002-05-21021 May 2002 IR 05000335/2002-005 & 05000389/2002-005, St. Lucie Nuclear Plant, Inspection on 04/15/2002-04/25/2002 Related to Identification & Resolution of Problems. No Findings of Significance Identified ML0209508842002-04-0505 April 2002 IR 05000335/2002-006, St. Lucie Nuclear Power Plant, Inspection on 03/14/2002-04/03/2002 Related to Fire Protection Unresolved Item 50-335, 389/98-201-09 IR 05000335/20010072002-03-0707 March 2002 IR 05000335/2001-007 & IR 05000389/2001-007 for Inspection on 02/01/2002 Related to Safety System Design & Performance Capability. No Violations Noted IR 05000335/20010052002-01-28028 January 2002 IR 05000335/2001-005 & IR 05000389/2001-005, St. Lucie, Units 1 & 2, Inspection on 09/30 - 12/29/2001 Related to Administrative & Engineering Controls. Non-cited Violation Noted 2023-06-30
[Table view] Category:Letter
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] |
Text
March 22, 2007 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION EA-06-092 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
ST. LUCIE NUCLEAR PLANT - NRC INSPECTION REPORT NO.
05000335,389/2007401
Dear Mr. Stall:
This refers to the Nuclear Regulatory Commissions (NRC) inspection completed on March 2, 2006, at Florida Power and Light Companys (FPL) St. Lucie Nuclear Plant. A Special Inspection Team (SIT) was established to examine activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. The results of the SIT inspection, which included an Unresolved Item (URI) at St. Lucie, were forwarded to you in NRC inspection report 50-335, 389/2006009 dated May 8, 2006. This report documents findings as a result of additional in-office inspection, that were discussed at an exit meeting on March 5, 2007, with Mr. Terry Patterson, Site Licensing Manager and other members of your staff.
This inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.
Based on the results of this inspection, one apparent violation was identified and is being considered for escalated enforcement action in accordance with the NRC Enforcement Policy.
The details associated with the apparent violation are described in the enclosed inspection report. The current Enforcement Policy is located on the NRCs Web site at www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html.
Before the NRC makes its enforcement decision, we are providing you an opportunity to either:
(1) respond to the apparent violation addressed in this letter within 30 days of the date of this letter or (2) request a pre-decisional enforcement conference. If a conference is held, it will not be open for public observation. Please contact Mr. Joel Munday, within 10 business days of the date of your receipt of this letter to notify us of your intentions.
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
FPL 2 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION If you choose to provide a written response, it should clearly be marked as a Response to An (Apparent Violation) EA-06-092" and should include: (1) the reason for the apparent violation, or, if contested, the basis for disputing the apparent violation; (2) the corrective steps that have been taken and the results achieved; (3) the corrective steps that will be taken to avoid further violations; and (4) the date when full compliance will be achieved. In presenting your corrective actions, you should be aware that the promptness and comprehensiveness of your actions will be considered in assessing any civil penalty for the apparent violation. Your response should be submitted under oath or affirmation and it may reference or include previously docketed correspondence, if the correspondence adequately addresses the required response. If an adequate response is not received within the time specified or an extension of time has not been granted by the NRC, the NRC will proceed with its enforcement decision.
Since the NRC has not made a final determination in this matter, no Notice of Violation is being issued for this inspection finding at this time. In addition, please be advised that the number and characterization of the apparent violations described in this inspection report may change as a result of further NRC review. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.
gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of the enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
Sincerely,
/RA/
Joseph W. Shea, Director Division of Reactor Safety Docket No. 50-335, 389 License No. DPR-67, NPF-16
Enclosures:
(See page 3)
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
FPL 3 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Enclosures:
- 1. Inspection Report 05000335/2007401, 05000389/2007401 w/
Attachment:
Supplemental Information (OUO)
- 2. NUREG/BR-0317 cc w/encls:
Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 Christopher R. Costanzo Plant General Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 Mr. Bill Parks Operations Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 Terry L. Patterson Licensing Manager St. Lucie Nuclear Plant 6351 South Ocean Drive Jensen Beach, FL 34957 William E. Webster Vice President, Nuclear Operations Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 34408 Mark Warner, Vice President Nuclear Operations Support Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 (cc w/encl contd - See page 4)
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
FPL 4 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION (cc w/ecl contd)
Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Seth B. Duston Training Manager St. Lucie Nuclear Plant Jensen Beach, Florida 34957-2000 M. S. Ross, Managing Attorney Florida Power & Light P. O. Box 14000 Juno Beach, FL 33408-0420 cc w/o encl:
Marjan Mashhadi, Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW, Suite 220 Washington, DC 20004 William A. Passetti Bureau of Radiation Control Department of Health 2020 Capital Circle SE, Bin #C21 Tallahassee, FL 32399-1741 Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 J. Kammel Radiological Emergency Planning Administrator Department of Public Safety 6000 SE Tower Drive Stuart, FL 34997 (cc w/o encl contd - See page 5)
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
FPL 5 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION (cc w/o encl contd)
Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION