Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20210J15629 July 1999Rev 0 to Wolf Creek Generating Station,Unit 1 Pressure & Temp Limts ReptHydrostatic
Pressure and Temperature Limits Report
ML20195E75910 November 1998WCNOC Proposed PASS Function ReductionShutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Post Accident Monitoring
Severe Accident Management Guideline
ML20249B24518 May 1998Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial RevsBoric Acid
Fuel cladding
ML20248C36818 May 1998Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear PlantsBoric Acid
Fuel cladding
ML20202F68829 September 1997Evaluation of Underground Essential Svc Water Pipeline LeakUltimate heat sink
ML20133F8458 January 1997WCGS Quadrennial Simulator Certification ReptBoric Acid
Shutdown Margin
Job Performance Measure
Fuel cladding
ML20117J0498 May 1996At&T Round Cell Nuclear Util User'S Council Charter
ML20100R42928 February 1996Incident Investigation Team Rept, Plant Shutdown Due to Circulating Water & Essential Svc Water Intake IcingHigh winds
Shutdown Margin
Ultimate heat sink
Temporary Modification
Frazil ice
Power change
ML20100Q20331 December 1995Annual SER 11 for Jan-Dec 1995Safe Shutdown
Boric Acid
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Fire impairment
Operating Basis Earthquake
Nondestructive Examination
Temporary Modification
Emergency Lighting
Missed surveillance
Battery sizing
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
ML20091K41222 August 1995Nonproprietary SE of Cycle 9 Core Reload Analysis for Wolf CreekSafe Shutdown
Shutdown Margin
Fuel cladding
ML20086R32831 July 1995Human Interactions Evaluation Failure to Isolate Incorrect Valve Alignment During ShutdownStroke time
Probabilistic Risk Assessment
ML20086A6533 May 1995Pyrolysis Gas Chromatography Analysis of 5 Thermo-Lag Fire Barrier SamplesFire Barrier
ML20081D54828 February 1995RCS Draindown Evaluation Summary Rept
ML20126M10731 December 1992Power Rerate Rept for Wolf Creek Generating StationSafe Shutdown
Boric Acid
Ultimate heat sink
Emergency Lighting
Battery sizing
Fuel cladding
Flow Induced Vibration
ML20126B09014 December 1992WCGS Simulator Certificate Data
ML20116A85931 October 1992Safety Evaluation & Cycle 7 TS Change Rept for Wolf Creek Generating Station
ML20029A7396 February 1991Economic Impact Study of Proposed KPL/KG-E Merger.
ML20247F13223 March 1989Post-Tensioning Sys Evaluation,Callaway Unit 1 Containment & Wolf Creek Unit 1 Containment
ML20154K78819 September 19881988 Radiological Emergency Preparedness Exercise Objectives
ML20195H41914 January 1988Final Rept on NRC IE Bulletin 85-003Mission time
Stroke time
FLEX
Coast down
ML20147E82531 December 1987Spent Fuel Storage Rack Criticality Analyses for Wolf Creek Generating StationBoric Acid
Earthquake
ML20147E83631 December 1987New Fuel Storage Rack Criticality Analysis for Wolf Creek Generating Station
ML20237H31016 July 1987Emergency Preparedness 1987 Field Exercise Scenario
ML20215J05119 June 1987Safety Evaluation Supporting Proposed Rev to Tech Spec 3/4.10.4 Re Reactor Coolant Loops to Replace Refs in Reactor Protection Sys P-7 Permissive w/P-10 Permissive
ML20207R69131 December 1986Annual Summary of Safety Evaluations Rept 2 for Jan-Dec 1986Boric Acid
Grab sample
Fire Barrier
Stroke time
Tornado Missile
Temporary Modification
Fire Watch
ML20137L63823 January 1986Reactor Vessel Ref Temp for Pressurized Thermal Shock
ML20140A37417 January 1986Final Rept of Independent Review of Environ Qualification Programs to NUREG-0588Boric Acid
Coatings
ML20141H62031 December 1985Nonproprietary Steam Generator Single-Tube Rupture Analysis for Snupps Plants Callaway & Wolf CreekStroke time
ML20116E81724 April 1985Final Rept:Task Analysis & Verification of Snupps Control RoomBoric Acid
Stroke time
ML20113A49619 January 1985Rev 1 to Evaluation of Aws Field Welding on Structural & Miscellaneous Steel at Wolf Creek Generating Station, Final ReptEarthquake
ML20126H60311 January 1985Const Self Assessment Corrective Action EvaluationFire Barrier
ML20129D39231 December 1984FSAR Commitment Compliance Study Results ReptUltimate heat sink
Stroke time
Coatings
Earthquake
Turbine Missile
ML20198B83227 December 1984Evaluation of Aws Field Welding on Structural & Miscellaneous Steel at Wolf Creek Generating Station, Final Rept.Related Info Encl
ML20133C91327 December 1984Final Rept on Evaluation of Aws Field Welding on Structural & Miscellaneous Steel at Wolf Creek Generating Station. Related Documentation Encl
ML20101K28221 December 1984Draft Interim Justification Position for Seismic & Environ Qualification of In-Core Thermocouples,Connectors,Adaptors & Ref Junction Box (ESE-43 & ESE-44)Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML20096D47231 August 1984Rev 2 to Plant Recovery Core Damage Assessment Methodology
ML20108B70320 July 1984Monthly Progress Rept for June 1984
ML20093A39130 June 1984Rev 1 to Detailed Control Room Design Review Summary Rept for Snupps, in Response to Generic Ltr 82-33,(NUREG-0737, Suppl 1)Boric Acid
Backfit
ML20086L0212 February 1984Detailed Control Room Design Review Summary Rept for Snupps, in Response to Generic Ltr 82-33,NUREG-0737, Suppl 1Boric Acid
ML20079Q39627 January 1984Rev 1 to Rept on Control of Heavy LoadsControl of Heavy Loads
ML20079G50613 January 1984Rev 1 to SAR for Safety Parameter Display SysBoric Acid
ML20086M96131 December 1983Evaluation of Containment Coating Acceptance TestsCoatings
ML20079G38431 December 1983Purge Valve Operability Rept,Snupps Project
ML20082H97328 November 1983Interim Rept on Water Seepage at Station 58 of Wolf Creek Generating Station Main Dam. W/One Oversize Figure. Aperture Card Is Available in PDR
ML20071E68410 March 1983Rept of Independent Review of Environ Qualification Programs to NUREG-0588Boric Acid
Ultimate heat sink
Coast down
ML20064G58931 December 1982Pressurizer Safety & Relief Line Piping & Support Evaluation,Callaway Unit 1 & Wolf Creek UnitLoop seal
Earthquake
ML20062E85823 July 1982Seismic Evaluation of Wolf Creek Generating Station Structures Using Livermore Spectrum,Evaluation of Piping Sys & SupportsUltimate heat sink
ML20062K1771 July 1982Essential Svc Water Sys Pump Restraint Embed ReptEarthquake
ML20054L49315 June 1982Pressurizer & Safety Relief Line Piping & Support Evaluation & Action Plan, Interim ReptLoop seal
ML20052D86630 April 1982to Seismic Evaluation of Wolf Creek Generating Station Structures Using Lll Spectrum.Safe Shutdown Earthquake
Operating Basis Earthquake
Tornado Generated Missile
Earthquake