Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20196D890 | 30 November 1998 | Non-proprietary Reload Analysis Methodology for Songs,Units 2 & 3 | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Rod Drop Event Fuel cladding Coast down |
ML20155F608 | 17 September 1998 | Non-proprietary Version of San Onofre 2 & 3 Replacement LP Rotors | |
ML20151Q121 | 14 August 1998 | Rev 0 to Control of Hazard Barriers | |
ML20248B898 | 26 May 1998 | Updated SG Run Time Analysis Cycle 9 | Boric Acid |
ML20248B922 | 30 April 1998 | Rev 0 to AES 98033327-1-1, Updated Probabilistic Operational Assessment for SONGS Unit 2,Second Mid Cycle Operating Period,Cycle 9 | |
05000361/LER-1998-003, LOCA Evaluation of Safety Significance of Failure of Emergency Sump Valve Linestarter (LER 1998-003) | 6 April 1998 | LOCA Evaluation of Safety Significance of Failure of Emergency Sump Valve Linestarter (LER 1998-003) | Boric Acid Probabilistic Risk Assessment |
ML20217Q616 | 5 April 1998 | Failure Analysis Rept 98-005,Failure Analysis of 2HV9305 Motor Starter | Probabilistic Risk Assessment Job Performance Measure |
ML20217D470 | 2 March 1998 | Rev 1 to 90459, Failure Modes & Effects Analysis DG Cross- Tie,DCP7048.00SE | Hot Short |
ML20203K914 | 3 February 1998 | Rev 0 to ESFAS Radiation Monitor Single Failure Analysis. W/96 Foldout Drawings | Pressure Boundary Leakage |
ML20199H062 | 13 November 1997 | Rev 0 to 90459, Failure Modes & Effects Analysis DG Cross- Tie;DCP7048.00SE SONGS Units 2 & 3 | |
ML20248L372 | 5 November 1997 | Combined Annual Frequency of Tornado-Generated Missile Strike Per Unit Area of Exposure at Songs,Units 2 & 3 | Tornado Missile Probabilistic Risk Assessment Tornado-Generated Missile |
ML20217K025 | 16 October 1997 | Rev 1 to A-SONGS-9416-1168, Thermal Hydraulic Analysis of SCE SONGS Unit 3 SG W/Degraded Eggcrates | Safe Shutdown Earthquake Finite Element Analysis Flow Induced Vibration |
ML20155B819 | 14 October 1997 | Non-proprietary Version of Rev 17 to San Onofre Retrofit Missile Analysis Rept | Turbine Missile |
ML20211D252 | 30 September 1997 | Rev 2 to AES 97043057-1-1, Probabilistic Operational Assessment of SG Tube Degradation at Songs,Unit 2,for Cycle 9 | |
ML20211D236 | 25 September 1997 | Steam Generator Run Time Analysis Cycle 9 | Boric Acid Hydrostatic Nondestructive Examination |
ML20203L026 | 25 July 1997 | Rev 0 to Software Configuration Data Base | |
ML20203L016 | 30 May 1997 | Rev 0 to Software Evaluation Rept | |
ML20203L687 | 24 February 1997 | Software Reliability Assessment of Radiation Monitoring Sys | Mission time |
ML20203L035 | 20 December 1996 | Rev 4 to Chapter 1-J | |
ML20203K894 | 19 June 1996 | Rev 0 to Software Verification & Validation Final Rept | |
ML20116C684 | 10 May 1996 | Rev 0 to Fuel Consolidation & Storage Rept | Boric Acid Ultimate heat sink Hydrostatic Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Tornado-Generated Missile Design basis earthquake Exemption Request Earthquake Control of Heavy Loads Fuel cladding |
ML20203K713 | 3 April 1996 | Rev 1 to System Software Requirements Specifications | |
ML20236P393 | 22 March 1996 | Rev 0 to Maint Rule Scoping & Risk Significance Determination Results of Expert Panel Meetings | Annual Radioactive Effluent Release Report Maintenance Rule Program |
ML20100Q627 | 31 October 1995 | Summary Rept Primary Plant Make-Up Storage Tank Upgrade San Onofre Nuclear Generating Station Units 2 & 3 | |
ML20095B690 | 18 October 1995 | Rev 0 to Evaluation of Handling & Storage of 4.8 Weight Percent Enrich Fuel | Fuel cladding Recently irradiated fuel |
ML20133G407 | 25 August 1995 | Final Rept, Seismic Hazard at Songs. W/One Oversize Drawing | Probabilistic Risk Assessment Earthquake |
ML20087B110 | 12 July 1995 | Safety Engineering Command & Control Evaluation | Boric Acid VT-2 |
ML20203K697 | 7 July 1995 | Rev O to Radiation Monitoring Sys Protocol Tss | |
ML20082C388 | 18 March 1995 | Rev 2 to White Paper, Fastener Strength Analysis,Nuclear Safety Concern 93-11 | |
ML20072U707 | 8 September 1994 | Rev 1 to White Paper Fastener Strength Analysis Nuclear Safety Concern 93-11 | |
ML20072S935 | 18 August 1994 | PRA Evaluation of Risk Impact of Proposed One-Time Exemption from Requirements of 10CFR50,App J for ILRT Testing at San Onofre Nuclear Generating Station Units 2 & 3 | Probabilistic Risk Assessment Exemption Request |
ML20072S893 | 18 August 1994 | PRA Evaluation of Population Dose Risk from Severe Accidents at San Onofre Nuclear Generating Station Units 2 & 3 | Probabilistic Risk Assessment Fuel cladding |
ML20084C631 | 19 May 1994 | Rev 2 to Songs,Unit 2 Response to GL 92-01 | |
ML20084C643 | 19 May 1994 | Rev 2 to Songs,Unit 3 Response to GL 92-01 | |
ML20069Q279 | 19 May 1994 | Response to Generic Ltr 92-01. Response Includes Info for Units 2 & 3 | |
ML20069H437 | 6 May 1994 | White Paper Fastner Strength Analysis Nuclear Safety Concern 93-11 | |
ML20064G173 | 28 February 1994 | Reactor Coolant Pump 3P002 Mechanical Seal Failure | Hydrostatic |
ML20058G578 | 31 December 1993 | Evaluation of Foreign Objects in SONGS Unit 3 Steam Generators | Pressure Boundary Leakage |
ML20063D330 | 6 December 1993 | PRA Evaluation of Tornado-Generated Missile Impact on SONGS 2/3 AFW Sys | Tornado Missile Probabilistic Risk Assessment Tornado Generated Missile Tornado Missile Protection TORMIS |
ML20059G568 | 4 November 1993 | Evaluation of Pressurizer Surge Line for Stratified Flow Conditions | |
ML20056H277 | 3 September 1993 | Primary Plant Make Up Storage Tank Seismic Upgrade SONGS, Unit 2 Summary Rept | |
ML20056F686 | 30 June 1993 | Nonproprietary Root Cause Evaluation for CPC Axial Shape Anomaly for Songs,Units 2 & 3 | |
ML20128B776 | 22 January 1993 | Response to GL 92-01,Rev 1 | |
ML20128B790 | 22 January 1993 | Response to GL 92-01,Rev 1 | |
ML20203E325 | 30 June 1992 | SONGS 3 Pressurizer Level Instrument Nozzle Leakage, Root Cause Evaluation | Liquid penetrant |
ML20101N124 | 24 June 1992 | Nonproprietary SCE Songs,Unit 2 Response to GL 92-01 Final Rept | |
ML20101N127 | 23 June 1992 | Nonproprietary SCE Songs,Unit 3 Response to GL 92-01 Final Rept | |
ML20099K307 | 13 May 1992 | Rev 2 to Design Rept, SCE - San Onofre SG Manway & Handhole Stud/Studhole Repair Evaluation Units 2 & 3 | |
ML20101G390 | 31 March 1992 | EDG 2G003 Camshaft Assembly Failure, Root Cause Rept | |
ML20079P179 | 5 November 1991 | MSIV 2HV8204 Rail/Skirt Failure, Safety Engineering Root Cause Rept |