Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20210L4362 August 1999Cycle 9 12-Month SG Insp Rept
ML20210L44531 July 1999Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20211F90330 June 1999Cycle 9 Refueling Outage
ML20206J12030 April 1999Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators
ML20205B66328 February 1999Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys
ML20206T79931 January 1999Iodine Revolatizitation in Grand Gulf Loca
ML20198S73031 December 1998Cycle 10 Voltage-Based Repair Criteria 90-Day Rept
ML20155F1961 September 1998Engineering Rept for Evaluation of BWR CR Drive Mounting Flange Cap Screw
ML20206J12730 April 1998Pressure Locking Thrust Evaluation Methodology for Flexible Wedge Gate ValvesFLEX
ML20199J25731 January 1998Cycle 9 Voltage-Based Repair Criteria 90-Day Rept
ML20199J24429 January 1998Snp Unit 2 Cycle Refueling Outage Oct 1997
L-97-215, SG Secondary Side Loose Object Safety Evaluation23 October 1997SG Secondary Side Loose Object Safety Evaluation
ML20203B95918 September 1997Pressure Locking Summary & Evaluations Using Commonwealth Edison Methodology for Sqn
ML20210J17631 July 1997Unit 1,Cycle 9 Alternate Plugging Criteria 90 Day ReptFlow Induced Vibration
ML20138D1994 April 1997Special Project97-928S, Sequoyah Nuclear Plant Assessments
ML20138A20431 March 1997Pre-SALP Rept for SALP Period 960225-970906Safe Shutdown
Fitness for Duty
High Radiation Area
Non-Destructive Examination
Grab sample
Fire Barrier
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Job Performance Measure
Foreign Material Exclusion
Process Control Program
Maintenance Rule Program
Downpower
ML20138C53724 March 1997Rev 0 to Pressurizer Level EventTime of Discovery
Scaffolding
ML20217G2403 March 1997Non-proprietary Rev 0 to SE of Reduced Thermal Design FlowShutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Fuel cladding
Flow Induced Vibration
Coast down
ML20199G71928 January 1997Rev 0 to Grand Gulf Nuclear Station Engineering Rept GGNS-97-0002 for GL 96-06 Evaluation of Drywall & Containment PenetrationsFinite Element Analysis
Earthquake
ML20117J3611 August 1996SE of Safety Valve Setpoint Tolerance RelaxationUltimate heat sink
Deep Dose Equivalent
Fuel cladding
ML20141A13231 July 1996Prediction of Onset of Fission Gas Release from Fuel in Generic Bwr
ML20115A58520 June 1996GGNS Engineering Rept for Evaluation of Ampacity Deratings for Thermo-Lag Fire Barrier Encl Cables in Fire Areas/Zones OC214,OC302,OC308 & 1A539Safe Shutdown
Fire Barrier
Fire Protection Program
ML20108D08630 April 1996Surveillance Specimen Program Evaluation for Grand Gulf Nuclear Station
ML20115A58318 April 1996Engineering Rept for Evaluation of Ampacity Deratings for Thermo-Lag Fire Barrier Encl Cables in Fire Areas/Zones OC202,OC402,OC702 & 1A316Safe Shutdown
Fire Barrier
ML20117K9465 March 1996Reliability Study
ML20117K95129 February 1996Reliability Common Cause Assessment, for Feb 1996
ML20100J86222 February 1996Engineering Rept Safety/Relief Valves Safety Function Lift Setpoint Tolerance Relaxation Summary ReptFeedwater Controller Failure
Fuel cladding
ML20094M52420 November 1995Self Assessment SALP Period 940227-960224Fitness for Duty
Non-Destructive Examination
Grab sample
Fire Barrier
Missed surveillance
Job Performance Measure
Foreign Material Exclusion
Earthquake
Maintenance Rule Program
ML20095J1895 October 1995Design & Analysis of Weld Overlay Repair for Sequoyah Unit 1 CRDM Lower Canopy Seal WeldsWeld Overlay
ML20081D38312 March 1995Simulator Four Yr Test Rept for 950312Fuel cladding
ML20078S1358 February 1995SWS Operational Performance Insp (Swsopi) for GgnsSafe Shutdown
Ultimate heat sink
Fire Barrier
Hydrostatic
Emergency Lighting
Job Performance Measure
Operability Determination
Biofouling
Through Wall Leak
ML20083N95216 November 199410CFR50.59 Rept to NrcSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
ML20072C98930 April 1994Survey of Melcor Assessment & Selected Applications, Third DraftLoop seal
Grab sample
Hydrostatic
Probabilistic Risk Assessment
ML20063H77931 December 19931993 Self AssessmentFitness for Duty
Half scram
Job Performance Measure
Systematic Assessment of Licensee Performance
Earthquake
Fire Protection Program
Downpower
ML20024H84919 July 1993Evaluation of Ultrasonic Test Results from 1993 ISI on Underclad Flaw Indications in Sequoyah,Unit 1 Rv Nozzles.
ML20046A26018 June 1993Safety Sys Functional Assessment, Low Pressure Core Spray & RCIC Sys.Reactor Vessel Water Level
Stroke time
Temporary Modification
ML18010B0845 May 1993NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216.Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Stroke time
Temporary Modification
Stress corrosion cracking
Liquid penetrant
Overspeed trip
ML18010A95230 November 1992NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216.Nondestructive Examination
Liquid penetrant
ML20116K80013 November 1992Quarterly Status Rept for Period Ending 920930, 'Degraded Core Accident Hydrogen Control Program.'
ML20118D19421 September 1992Technical Rept on Hydrogen Control Measures & Effects of Hydrogen Burns on Safety Equipment
ML20114A66415 August 1992920619 Self-Assessment. Several Hardware & Software Enhancements to Emergency Response Ctrs Completed During Reporting PeriodFire Barrier
Coatings
Condition Adverse to Quality
Job Performance Measure
Foreign Material Exclusion
Systematic Assessment of Licensee Performance
Fire Watch
Downpower
ML20095K09530 April 1992Resolution of High Groundwater Levels at Grand Gulf Nuclear StationHydrostatic
ML20141M13427 March 1992Spent Fuel Pool Mod for Increased Storage CapacityOperating Basis Earthquake
Design basis earthquake
Control of Heavy Loads
Fuel cladding
ML20086K47431 October 1991Cycle 6 Plant Transient AnalysisAnticipated operational occurrence
Feedwater Controller Failure
ML20086K51931 October 1991Nonproprietary Siemens Nuclear Power Corp Grand Gulf Unit 1 Reload XN-1.3,Cycle 4 Mechanical Design Rept Suppl 1Anticipated operational occurrence
Power change
ML20086K51131 October 1991LOCA Analysis for Single Loop OperationFLEX
Fuel cladding
ML20086K49931 October 1991Cycle 6 Reload AnalysisAnticipated operational occurrence
Fuel cladding
ML20029C34631 March 1991Simulator Certification Rept for Grand Gulf Nuclear Station.
ML20073K84531 March 1991Entergy Nuclear Performance Rept,Mar 1991Unanalyzed Condition
Fire Barrier
Nondestructive Examination
Missed surveillance