Issue date | Title | Topic | |
---|---|---|---|
ML20210D846 | 30 June 1999 | INEEL/EXT-99-00415, Technical Evaluation Rept(Rev 1) on Proposed Alternative to Iwe/Iwl Containment Insp,Comanche Peak Electric Station | Coatings Nondestructive Examination VT-2 Moisture barrier Dissimilar Metal Weld |
ML20209G756 | 28 February 1999 | Final Rept, Technical Evaluation Rept on 'Submittal-Only' Review of Individual Plant Exam of External Events at Comanche Peak Steam Electric Station,Units 1 & 2 | Hot Short Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Tornado Generated Missile Earthquake |
ML20199G840 | 6 November 1997 | Rev 0 to Ltr Rept, Supplemental Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits | Safe Shutdown Boric Acid Fire Barrier |
ML20140G572 | 24 April 1997 | Rev 0 to, Technical Evaluation of South Texas Project Analysis of Cable Ampacity Limits | Fire Barrier |
ML20135B382 | 24 February 1997 | Exam of Motor-Operated Valve Failures W/Application to Increasing Surveillance Testing Period at Texas Utilities Co. Comanche Peak,Units 1 & 2 | |
ML20135B433 | 6 January 1997 | Evaluation of Candidate LSSC Check Valves for Risk Based IST Extension at Comanche Peak Units 1,2 | |
ML20138H994 | 2 January 1997 | Technical Evaluation Rept of IPE Submittal & RAI Responses for Comanche Peak Steam Electric Station,Unit 1 | Boric Acid Mission time Internal Flooding Probabilistic Risk Assessment Finite Element Analysis |
ML20117E220 | 28 June 1996 | Rev 0 to, Review of South Texas Project Fire Barrier Ampacity Assessments, Ltr Rept | Fire Barrier |
ML20117J012 | 13 November 1995 | Assessment of Cable Functionality Performance Issues for Tue Comanche Peak Unit 1 Thermo-Lag Fire Endurance Tests, Technical Evaluation Rept | Fire Barrier Functionality Assessment |
ML20094A484 | 31 August 1995 | Technical Evaluation Rept,Rev 6 for Plant Odcm | Offsite Dose Calculation Manual |
L-95-014, TER on First 10-Yr Interval ISI Program Plan:Tuec,Cpses, Unit 2 | 30 April 1995 | TER on First 10-Yr Interval ISI Program Plan:Tuec,Cpses, Unit 2 | Boric Acid VT-2 Incorporated by reference Liquid penetrant |
ML20080J184 | 28 February 1995 | Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:South Texas-1/2 | |
ML20059F429 | 31 December 1993 | Auxiliary Feedwater System RISK-BASED Inspection Guide for the South Texas Project Nuclear Power Plant | Packing leak Stroke time Probabilistic Risk Assessment |
ML20080G313 | 31 March 1993 | Draft Review of Operating Experience for South Texas 1 & 2, 1991-1992.Related Info Encl | Unanalyzed Condition Loop seal Temporary Modification Missed surveillance |
ML20126H549 | 14 December 1992 | Technical Evaluation Rept, Technical Evaluation of TR RXE-91-002 (Reactivity Anomaly Events Methodology) for Tugc | Shutdown Margin Rod Drop Event |
ML20116N944 | 31 October 1992 | Auxiliary Feedwater System RISK-BASED Inspection Guide for the Comanche Peak Nuclear Power Plant | |
ML20106D925 | 31 March 1992 | Technical Evaluation Rept on First 10-Yr Interval ISI Program Plan:Tuec,Cpses,Unit 1,Docket Number 50-445 | Hydrostatic VT-2 Incorporated by reference Liquid penetrant |
ML20095L105 | 31 December 1991 | Technical Evaluation Rept TUE-1 Departure from Nucleate Boiling Correlation | |
ML20082M577 | 31 August 1991 | a Review of the South Texas Project Probabilistic Safety Analysis for Accident Frequency Estimates and Containment Binning | Hot Short Safe Shutdown Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Chernobyl |
ML20073M903 | 30 April 1991 | Analysis of Flow Stratification in the Surge Line of the Comanche Peak Reactor | |
ML20084T334 | 31 January 1991 | Final Technical Evaluation Rept - South Texas Project Electrical Generating Station Station Blackout Evaluation | Safe Shutdown Boric Acid Emergency Lighting |
ML20059N794 | 30 June 1990 | Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan,South Texas Project Electric Generating Station Unit 2 | Incorporated by reference |
ML19332B617 | 30 November 1989 | Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: South Texas-1/2. | |
ML20012A991 | 30 November 1989 | Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Houston Lighting & Power Co,South Texas Project Electric Generating Station,Unit 1. | Incorporated by reference |
ML19332B614 | 31 October 1989 | Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components:Quad Cities 1 & 2, Final Technical Evaluation Rept | Safe Shutdown |
ML20246B815 | 30 April 1989 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept | |
ML20246B973 | 31 March 1989 | Conformance to Reg Guide 1.97:Byron 1/2 & Braidwood 1/2, Technical Evaluation Rept | Boric Acid |
ML20236B805 | 13 March 1989 | Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files | |
ML20235B071 | 31 December 1988 | Conformance to Reg Guide 1.97:Comanche Peak -1/-2, Technical Evaluation Rept | Safe Shutdown Boric Acid Grab sample Anticipated operational occurrence |
ML20205N943 | 31 October 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-1 | |
ML20196C164 | 4 February 1988 | Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 | |
ML20205N953 | 31 January 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-3 | Safe Shutdown |
ML20205N948 | 31 January 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components - Millstone-2 | Safe Shutdown |
ML18040B189 | 31 August 1987 | Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. | |
ML20235V152 | 31 August 1987 | Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 | |
ML20235M359 | 31 August 1987 | Preliminary Conformance to Reg Guide 1.97:Byron Units 1 & 2 & Braidwood Units 1 & 2, Technical Evaluation Rept | Boric Acid |
ML20237J062 | 19 August 1987 | Technical Evaluation Rept on Duke Power Co McGuire & Catawba Nuclear Stations Spds | Backfit |
ML20237J141 | 17 August 1987 | Facility Sys Analysis Support, Progress Rept 23 for 870713 -0807 | |
ML20236P640 | 31 July 1987 | Review of Recirculation Pump Trip Design for Brunswick Steam Electric Plants, Informal Rept | |
ML17347A593 | 31 July 1987 | Retran Code:Transient Analysis Model Qualification, Technical Evaluation Rept | |
ML20236D918 | 31 July 1987 | Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs | Probabilistic Risk Assessment Earthquake |
ML18052B193 | 30 June 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept | |
ML20235M380 | 30 June 1987 | Audit of Environ Qualification of Safety-Related Electrical Equipment for South Texas Project Unit 1, Final Informal Rept | |
ML20235M002 | 30 June 1987 | Resolution of Confirmatory Item Non-Class 1E Signal to Class 1E Circuit Interface:South Texas Project 1 & 2, Technical Evaluation Rept | Safe Shutdown Earthquake |
ML20215M170 | 31 May 1987 | TMI Action-NUREG-0737 (II.D.1),Comanche Peak Steam Electric Station Unit 1, Informal Technical Evaluation Rept | Loop seal Anticipated operational occurrence Earthquake |
ML20215M306 | 31 May 1987 | Evaluation of South Texas Project Unit 1 Tech Specs, Informal Technical Evaluation Rept | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Earthquake Pressure Boundary Leakage Unidentified leakage |
ML20215M109 | 31 May 1987 | TMI Action-NUREG-0737 (II.D.1),Relief & Safety Valve Testing,South Texas Units 1 & 2, Technical Evaluation Rept | Loop seal Stroke time Anticipated operational occurrence Earthquake |
ML18150A119 | 30 April 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept | |
ML20214Q898 | 30 April 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept | |
ML18150A188 | 30 April 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept |