 Issue dateTitleTopic
ML23335A0121 December 2023FNP - IP95001 Inspection Notification and Request for Information (Email to Farley)
ML23243A99531 August 2023Request for Baseline RP InspectionProcess Control Program
ML23236A00222 August 2023NRR E-mail Capture - Request for Additional Information - Farley, Units 1&2, Emergency TS 3.6.5 LARUltimate heat sink
ML23223A01410 August 2023NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical BarriersExemption Request
ML23198A15517 July 2023NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023
ML23135A09211 May 2023NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016)Incorporated by reference
ML23095A0835 April 2023NRR E-mail Capture - for Your Action - RAI - Farley - Containment Isolation Valves, Surveillance Requirement 3.6.3.5 LAR (L-2022-LLA-0189)Stroke time
Surveillance Frequency Control Program
ML23086A02324 March 2023NRR E-mail Capture - for Your Action - Draft RAIs - Farley Surveillance Requirement (SR) 3.6.3.5 License Amendment Request (LAR) (L-2022-LLA-0189)Stroke time
Surveillance Frequency Control Program
ML23073A02513 March 2023NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet
ML23045A07813 February 2023NRR E-mail Capture - Fyi - Revised Estimated Hours - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098)
ML23009A0156 January 2023NRR E-mail Capture - Acceptance Review - Farley Surveillance Requirement (SR) 3.6.3.5 LAR
ML23009A0066 January 2023NRR E-mail Capture - Corrected - Acceptance Review - Farley Surveillance Requirement (SR) 3.6.3.5 LAR
ML23003A8093 January 2023NRR E-mail Capture - for Your Action - RAI - Farley - ISI Alternative FNP-ISI-ALT-05-05 (L-2022-LLR-0068)Incorporated by reference
ML22354A01119 December 2022NRR E-mail Capture - Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-01
ML22334A14830 November 2022NRR E-mail Capture - for Your Action - RAI - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098)Anticipated operational occurrence
ML22285A25312 October 2022NRR E-mail Capture - Acceptance Review - Farley Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0
ML22285A00811 October 2022NRR E-mail Capture - Acceptance Review - Farley TS 4.3 LAR (L-2022-LLA-0138)
ML22229A47915 August 2022HP Baseline Inspection Document Request
ML22213A2691 August 2022NRR E-mail Capture - Joseph M. Farley Nuclear Plant Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specification 3.4.10, Pressurizer Safety Valves
ML22123A1783 May 2022NRR E-mail Capture - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing ProgramGOTHIC
ML22123A1803 May 2022NRR E-mail Capture - Correction - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing ProgramGOTHIC
ML22112A08922 April 2022NRR E-mail Capture - Draft RAIs for Farley LAR Re. TS 5.5.17GOTHIC
ML22104A13114 April 2022NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235)
ML22018A02718 January 20222022 All RFI Responses - Exercise and Program Inspections - Revl
ML22020A06613 January 2022NRR E-mail Capture - Acceptance Review - Farley and Vogtle TSTF-269-A LAR (L-2021-LLA-0234)
ML22012A06311 January 2022NRR E-mail Capture - Acceptance Review - Farley and Vogtle TS 5.5.16 LAR (L-2021-LLA-0235)
ML22010A24010 January 2022NRR E-mail Capture - Farley 1 and 2 - Acceptance of Requested Licensing Action Revise TS 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure
ML21321A37716 November 2021NRR E-mail Capture - RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal
ML21321A37510 November 2021NRR E-mail Capture - Draft RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal
ML21292A15619 October 2021NRR E-mail Capture - Acceptance Review - SNC Operating Fleet TSTF-554 LAR
ML21274A0461 October 2021NRR E-mail Capture - Acceptance Review - Farley and Vogtle TSTF-577 LAR (L-2021-LLA-0163)
ML21236A31424 August 2021NRR E-mail Capture - Joseph M. Farley Nuclear Plant Units 1 and 2 - Acceptance of Requested Licensing Action Amendment to Remove Sump Recirculation Valve Encapsulation
ML21180A20028 June 2021NRR E-mail Capture - Acceptance Review - Farley and Vogtle - Voluntary License Amendment Request to Use Beacon Power Distribution Monitoring System (L-2021-LLA-0109)
ML21174A11823 June 2021NRR E-mail Capture - Acceptance Review - SNC Fleet - Remove Table of Contents LAR (L-2021-LLA-0115)
ML21174A11523 June 2021NRR E-mail Capture - Acceptance Review - Farley and Vogtle Exemption Requests from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (L-2021-LLE-0031)Exemption Request
ML21132A01311 May 2021NRR E-mail Capture - Acceptance Review - SNC Fleet QATR Reduction in Commitment Licensing Action - L-2021-LLQ-0002Pandemic
ML21105A01314 April 2021NRR E-mail Capture - Acceptance Review - SNC Fleet LAR to Change TS 5.7, High Radiation Area (L-2021-LLA-0052)High Radiation Area
ML21012A32412 January 2021NRR E-mail Capture - Request for Additional Information - Farley, 1 and 2 - Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsInternal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
ML20351A40416 December 2020NRR E-mail Capture - Draft RAIs for Farley 50.69 (ML20170B114)Internal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
ML20318A02112 November 2020NRR E-mail Capture - Fyi - Acceptance Review - SNC Fleet TSTF-541 LAR (L-2020-LLA-0232)Coronavirus
ML20293A07514 October 2020NRR E-mail Capture - RAIs for SNC Fleet EP LAR (L-2020-LLA-0150 and L-2020-LLA-0151)Minimum staff
ML20289A1159 October 2020NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of Requested Licensing Action Request for One-Time Exemption from 10 CFR 50, Appx E, Biennial EP Exercise Requirements Due to COVID-19 PandemicExemption Request
Pandemic
Coronavirus
NL-20-0713, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic21 September 2020Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 PandemicExemption Request
Pandemic
Coronavirus
COVID-19
ML20254A19110 September 2020004 Radiation Safety Baseline Inspection Information RequestCoronavirus
ML20245E2841 September 2020NRR E-mail Capture - Acceptance Review - SNC Fleet EP LAR (L-2020-LLA-0150 and L-220-LLA-151)
ML20199M25717 July 2020NRR E-mail Capture - Joseph M. Farley, Units 1 and 2 - Acceptance of Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors
ML20181A40729 June 2020NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues
ML20174A58122 June 2020Notification of Inspection and Request for InformationUltimate heat sink
Through-Wall Leak
Flow Induced Vibration
ML20149K62527 May 2020NRR E-mail Capture - RAIs for SNC Fleet Fire Protection Exemption RequestsSafe Shutdown
Exemption Request
Coronavirus
Fire Protection Program
NL-20-0640, Response to Request for Additional Information for Exemption Request27 May 2020Response to Request for Additional Information for Exemption RequestExemption Request