NRR E-mail Capture - Joseph M. Farley Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues
ML20181A407
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/29/2020
From: Shawn Williams
NRC/NRR/DORL/LPL2-1
To: Coleman J
Southern Nuclear Operating Co
References
L-2020-LLA-0121
Download: ML20181A407 (3)


Text

From: Williams, Shawn Sent: Monday, June 29, 2020 11:07 AM To: Coleman, Jamie Marquess Cc: Sparkman, Wesley A.; Devlin-Gill, Stephanie

Subject:

Joseph M. Farley Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Re: Revise Technical Specifications to Adopt TSTF-567, "Add Containment Sump TS to Address GSI-191 Issues" (EPID L-2020-LLA-0121)

Dear Ms. Coleman,

By letter dated May 29, 2020 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML20150A329), Southern Nuclear Operating Company, Inc. submitted a license amendment for Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley). The proposed amendment would adopt TSTF-567, "Add Containment Sump TS [Technical Specification] to Address GSI-191 Issues."

The purpose of this letter is to provide the results of NRC staffs acceptance review. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> to complete. The NRC staff expects to complete this review by November 30, 2020, as requested in your application. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Shawn Williams, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier: NRR_DRMA Email Number: 655 Mail Envelope Properties (SN6PR09MB3232731A041EFA5830B57289906E0)

Subject:

Joseph M. Farley Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Re: Revise Technical Specifications to Adopt TSTF-567, "Add Containment Sump TS to Address GSI-191 Issues" (EPID L-2020-LLA-0121)

Sent Date: 6/29/2020 11:07:07 AM Received Date: 6/29/2020 11:07:09 AM From: Williams, Shawn Created By: Shawn.Williams@nrc.gov Recipients:

"Sparkman, Wesley A." <WASPARKM@southernco.com>

Tracking Status: None "Devlin-Gill, Stephanie" <Stephanie.Devlin-Gill@nrc.gov>

Tracking Status: None "Coleman, Jamie Marquess" <JAMIEMCO@SOUTHERNCO.COM>

Tracking Status: None Post Office: SN6PR09MB3232.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3457 6/29/2020 11:07:09 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: