NRR E-mail Capture - Farley 1 and 2 - Acceptance of Requested Licensing Action Revise TS 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure
ML22010A240
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/10/2022
From: Stephanie Devlin-Gill
NRC/NRR/DORL/LPL2-1
To: Sparkman W
Southern Nuclear Operating Co
References
L-2021-LLA-0229
Download: ML22010A240 (3)


Text

From: Devlin-Gill, Stephanie Sent: Monday, January 10, 2022 3:12 PM To: Sparkman, Wesley A.

Subject:

Joseph M. Farley Nuclear Plant Units 1 and 2 - Acceptance of Requested Licensing Action Re: Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure (EPID L-2021-LLA-0229)

Wes, By letter dated December 13, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21348A733), Southern Nuclear Operating Company submitted a license amendment for the Joseph M. Farley Nuclear Plant Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal and discussions during the pre-licensing meeting on October 14, 2021 (ADAMS Accession No. ML21288A331), the NRC staff has estimated that this licensing request will take approximately 350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately 11 months, on December 13, 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

stephanie Stephanie Devlin-Gill (she/her)

Licensing Project Manager

w. 301-415-5301 U.S. NRC, NRR, DORL, LPL2-1

Hearing Identifier: NRR_DRMA Email Number: 1480 Mail Envelope Properties (DM6PR09MB4806519A95BA1FA42286FE6DBD509)

Subject:

Joseph M. Farley Nuclear Plant Units 1 and 2 - Acceptance of Requested Licensing Action Re: Revise Technical Specification 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure (EPID L-2021-LLA-0229)

Sent Date: 1/10/2022 3:12:17 PM Received Date: 1/10/2022 3:12:00 PM From: Devlin-Gill, Stephanie Created By: Stephanie.Devlin-Gill@nrc.gov Recipients:

"Sparkman, Wesley A." <WASPARKM@southernco.com>

Tracking Status: None Post Office: DM6PR09MB4806.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3325 1/10/2022 3:12:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: