ML18228A665 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter18-Human Factors Engineering | Safe Shutdown Ultimate heat sink Stroke time Probabilistic Risk Assessment Abnormal operational transient Manual Operator Action |
ML18228A647 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier 1 | Safe Shutdown Boric Acid Loop seal Ultimate heat sink Non-Destructive Examination Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Nondestructive Examination Emergency Lighting Incorporated by reference High Energy Line Break Open Phase Condition Feedwater Heater Earthquake Commercial Grade Turbine Missile Pressure Boundary Leakage Pressure boundary leak Flow Induced Vibration Core Exit Thermocouple Overspeed trip Overspeed Manual Operator Action |
ML18228A648 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter01-Introduction and General Description of the Plant | Safe Shutdown Unanalyzed Condition Boric Acid High winds Shutdown Margin Loop seal High Radiation Area Ultimate heat sink Mission time Grab sample Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Nondestructive Examination Cyber Security Multiple Spurious Operation Emergency Lighting Incorporated by reference FLEX Test box Fukushima Dai-Ichi Seismically rugged Pressure and Temperature Limits Report Open Phase Condition Foreign Material Exclusion Feedwater Heater Process Control Program Large early release frequency Stress corrosion cracking Integrated leak rate test Eddy Current Testing Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Commercial Grade Maintenance Rule Program Deep Dose Equivalent Hardened vent Turbine Missile Fuel cladding Biofouling Pressure Boundary Leakage Offsite Circuit Fire Protection Program Fire Watch Very Early Warning Fire Detection Scaffolding Power change Core Exit Thermocouple Uranium Hexafluoride GOTHIC Power Uprate Overspeed trip Overspeed Loss of condenser vacuum Water hammer Control Room Habitability |
ML18228A649 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter02-Site Characteristics | Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Hydrostatic Earthquake Control Room Habitability |
ML18228A651 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter04-Reactor | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Stress corrosion cracking Fuel cladding Liquid penetrant Power change Core Exit Thermocouple Overspeed Loss of condenser vacuum |
ML18228A652 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter05-Reactor Coolant System and Connecting Systems | Safe Shutdown Boric Acid Reactor Vessel Water Level Loop seal Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Incorporated by reference Pressure and Temperature Limits Report Foreign Material Exclusion Stress corrosion cracking Eddy Current Testing Earthquake Power Operated Valves Fuel cladding Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Power change Flow Induced Vibration Core Exit Thermocouple Coast down Unidentified leakage Unidentified leak Overspeed Operational leakage Thermal fatigue Loss of condenser vacuum Water hammer |
ML18228A653 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter06-Engineered Safety Features | Safe Shutdown Boric Acid High winds Shutdown Margin Loop seal Ultimate heat sink Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Nondestructive Examination Temporary Modification Emergency Lighting Incorporated by reference High Energy Line Break Stress corrosion cracking Maintenance Rule Program Power-Operated Valves Accidental discharge GOTHIC Water hammer Control Room Habitability |
ML18228A654 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter07-Instrumentation and Controls | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment High Energy Line Break Feedwater Heater Fuel cladding Pressure Boundary Leakage Fire Protection Program Core Exit Thermocouple Unidentified leak Manual Operator Action |
ML18228A655 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter08-Electric Power | Safe Shutdown Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Emergency Lighting Residual transfer Open Phase Condition Design basis earthquake Battery sizing Residual voltage transfer Earthquake Maintenance Rule Program Offsite Circuit Overspeed |
ML18228A657 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter10-Steam and Power Conversion System | Safe Shutdown Boric Acid Grab sample Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Nondestructive Examination Feedwater Heater Stress corrosion cracking Earthquake Power-Operated Valves Turbine Missile Biofouling Liquid penetrant Overspeed trip Overspeed Loss of condenser vacuum Water hammer |
ML18228A658 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter11-Radioactive Waste Management | Boric Acid Loop seal Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Coatings Operating Basis Earthquake High Energy Line Break Process Control Program Fuel cladding Pressure Boundary Leakage Pressure boundary leak Operational leakage |
ML18228A659 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter12-Radiation Protection | Safe Shutdown Boric Acid Shutdown Margin Loop seal High Radiation Area Mission time Offsite Dose Calculation Manual Anticipated operational occurrence Feedwater Heater Process Control Program Stress corrosion cracking Deep Dose Equivalent Fuel cladding Unidentified leakage Unidentified leak Overexposure |
ML18228A660 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter13-Conduct of Operations | Fitness for Duty Incorporated by reference Safeguards Contingency Plan |
ML18228A661 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter14-Verification Programs | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Fire Barrier Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Emergency Lighting Incorporated by reference Local Leak Rate Testing Feedwater Heater Integrated leak rate test Residual voltage transfer Power-Operated Valves Pressure Boundary Leakage Fire Protection Program Scaffolding Coast down Unidentified leakage Overspeed Loss of condenser vacuum Water hammer |
ML18228A662 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter15-Transient and Accident Analyses | Safe Shutdown Boric Acid Shutdown Margin Loop seal Anticipated operational occurrence Probabilistic Risk Assessment Feedwater Heater Control of Heavy Loads Deep Dose Equivalent Fuel cladding Coast down Operational leakage Loss of condenser vacuum Control Room Habitability |
ML18228A664 | 13 August 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.3 - Tier2 Chapter17-Quality Assurance and Reliability Assurance | Ultimate heat sink Fire Barrier Internal Flooding Probabilistic Risk Assessment Emergency Lighting Maintenance Rule Program Core Exit Thermocouple |
ML18079A480 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter18-Human Factors Engineering | Safe Shutdown Ultimate heat sink Stroke time Probabilistic Risk Assessment Abnormal operational transient Manual Operator Action |
ML18079A426 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier 1 | Safe Shutdown Boric Acid Loop seal Ultimate heat sink Non-Destructive Examination Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Nondestructive Examination Emergency Lighting Incorporated by reference High Energy Line Break Open Phase Condition Feedwater Heater Residual voltage transfer Earthquake Commercial Grade Power Operated Valves Turbine Missile Pressure Boundary Leakage Pressure boundary leak Flow Induced Vibration Core Exit Thermocouple Overspeed trip Overspeed Manual Operator Action |
ML18079A429 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter01-Introduction and General Description of the Plant | Safe Shutdown Unanalyzed Condition Boric Acid High winds Shutdown Margin Loop seal High Radiation Area Ultimate heat sink Mission time Grab sample Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Nondestructive Examination Cyber Security Multiple Spurious Operation Emergency Lighting Incorporated by reference FLEX Test box Fukushima Dai-Ichi Pressure and Temperature Limits Report Open Phase Condition Foreign Material Exclusion Feedwater Heater Process Control Program Large early release frequency Stress corrosion cracking Integrated leak rate test Eddy Current Testing Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Commercial Grade Maintenance Rule Program Deep Dose Equivalent Hardened vent Turbine Missile Fuel cladding Biofouling Pressure Boundary Leakage Fire Protection Program Fire Watch Very Early Warning Fire Detection Scaffolding Power change Core Exit Thermocouple Uranium Hexafluoride GOTHIC Overspeed trip Overspeed Loss of condenser vacuum Water hammer Control Room Habitability |
ML18079A431 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter02-Site Characteristics | Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Hydrostatic Earthquake Control Room Habitability |
ML18079A442 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter04-Reactor | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Stress corrosion cracking Fuel cladding Liquid penetrant Power change Core Exit Thermocouple Overspeed |
ML18079A445 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter05-Reactor Coolant System and Connecting Systems | Safe Shutdown Boric Acid Reactor Vessel Water Level Loop seal Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Incorporated by reference Pressure and Temperature Limits Report Foreign Material Exclusion Stress corrosion cracking Eddy Current Testing Earthquake Power Operated Valves Fuel cladding Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Power change Flow Induced Vibration Core Exit Thermocouple Coast down Unidentified leakage Unidentified leak Overspeed Operational leakage Thermal fatigue Loss of condenser vacuum Water hammer |
ML18079A448 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter06-Engineered Safety Features | Safe Shutdown Boric Acid High winds Shutdown Margin Loop seal Ultimate heat sink Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Nondestructive Examination Temporary Modification Emergency Lighting Incorporated by reference High Energy Line Break Stress corrosion cracking Maintenance Rule Program Power-Operated Valves Accidental discharge GOTHIC Water hammer Control Room Habitability |
ML18079A453 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter08-Electric Power | Safe Shutdown Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Emergency Lighting Residual transfer Open Phase Condition Design basis earthquake Battery sizing Residual voltage transfer Earthquake Maintenance Rule Program Offsite Circuit Overspeed |
ML18079A460 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter10-Steam and Power Conversion System | Safe Shutdown Boric Acid Grab sample Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Nondestructive Examination Feedwater Heater Stress corrosion cracking Earthquake Power-Operated Valves Turbine Missile Biofouling Liquid penetrant Overspeed trip Overspeed Loss of condenser vacuum Water hammer |
ML18079A462 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter11-Radioactive Waste Management | Boric Acid Loop seal Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Coatings Operating Basis Earthquake High Energy Line Break Process Control Program Fuel cladding Pressure Boundary Leakage Pressure boundary leak Operational leakage |
ML18079A464 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter12-Radiation Protection | Safe Shutdown Boric Acid Shutdown Margin Loop seal High Radiation Area Mission time Offsite Dose Calculation Manual Anticipated operational occurrence Feedwater Heater Process Control Program Stress corrosion cracking Deep Dose Equivalent Fuel cladding Unidentified leakage Unidentified leak Overexposure |
ML18079A468 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter13-Conduct of Operations | Fitness for Duty Incorporated by reference Foreign Material Exclusion Safeguards Contingency Plan |
ML18079A470 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter14-Verification Programs | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Fire Barrier Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Emergency Lighting Incorporated by reference Local Leak Rate Testing Feedwater Heater Integrated leak rate test Residual voltage transfer Power-Operated Valves Pressure Boundary Leakage Fire Protection Program Scaffolding Coast down Unidentified leakage Overspeed Loss of condenser vacuum Water hammer |
ML18079A477 | 8 March 2018 | Korea Hydro-Nuclear Power Co., Ltd (Design Control Document) Rev.2 - Tier2 Chapter17-Quality Assurance and Reliability Assurance | Ultimate heat sink Fire Barrier Internal Flooding Probabilistic Risk Assessment Maintenance Rule Program |
ML18079A145 | 28 February 2018 | Enclosure 2: APR1400 DCD Change List (Rev.2) (Non-Proprietary) | Boric Acid Shutdown Margin Anticipated operational occurrence Pressure Boundary Leakage Recently irradiated fuel Unidentified leakage Operational leakage |
ML18079A144 | 28 February 2018 | Enclosure 1: APR1400 DCD RAI Tracking Report (Rev.2) (Non-Proprietary) | |