Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23038A019 | 6 February 2023 | Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays | |
ML20366A048 | 7 December 2020 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0114, Rev. 1 | Safe Shutdown |
ML20366A047 | 18 November 2020 | Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 | |
ML19346H873 | 12 December 2019 | Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 | |
ML19064A231 | 20 February 2019 | Flowserve - Spring Deflection Causing Potential Hang-Up of the Flapper (Disc), Worcester Series 44 Swing Check Valve | |
ML18078A536 | 31 January 2018 | Crane Nuclear, Inc. - Interim Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem (Update) | |
ML17311A909 | 31 October 2017 | Interim Report for Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem | |
ML15103A485 | 7 April 2015 | Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing | |
ML14337A093 | 26 November 2014 | Part 21 - Type 67 Afr Regulators with Improperly Dedicated Diaphragm Valve Seats | |
ML14337A094 | 24 November 2014 | Notification of Potential Part 21 - Lack of Proper Power Supply Indication | |
ML14329A705 | 24 November 2014 | Notification of Potential Part 21 - Type 67 Afr Regulators with Improperly Dedicated Diaphragm Valve Seats | |
ML14329A063 | 19 November 2014 | Notification of Potential Part 21 Re Lack of Proper Power Supply Indication | |
ML14261A150 | 17 September 2014 | Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing | |
ML14241A238 | 27 August 2014 | Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in Ensuring Customer Wall Thickness Requirements Were Met | |
ML14252A309 | 27 August 2014 | Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in Ensuring Customer Wall Thickness Requirements Were Met | |
ML14226A641 | 14 August 2014 | Written Notification to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing | |
ML14213A010 | 28 July 2014 | Notification of Potential Part 21 Report - Defects on 2 Inch Bonnets | |
ML14210A008 | 18 July 2014 | Part 21 Report - Notification of Defects on 2 Inch Bonnets | |
ML14147A370 | 23 May 2014 | Pentair Valves and Controls - Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in Ensuring Customer Wall Thickness Requirements Were Met | |
ML14129A436 | 8 May 2014 | Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in ASME Code Required Valve and Component Testing | |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12214A359 | 20 July 2012 | Final Report on Rscc Wire & Cable Llc'S Firezone 3HR 600V Cables | |
ML12153A025 | 30 May 2012 | Part-21 Notification - Firezone 3HR 600V Cable May Not Function as Tested and Qualified | |
ML12123A089 | 27 April 2012 | Abb, Inc., Notification of Potential Part 21 Report - Hk Circuit Breaker Studs Failed to Meet Specification | |
ML12094A371 | 2 April 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12066A118 | 2 March 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12097A316 | 2 March 2012 | Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition | |
ML12058A141 | 23 February 2012 | Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations | |
ML11298A190 | 18 October 2011 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0103, Rev. 0, Piston Assembly - Delamination of Tin Plating on Refurbished Piston Skirts | |
ML11292A010 | 17 October 2011 | Part 21 Notification - Emergency Diesel Generator Piston Delamination | |
ML103060102 | 29 October 2010 | Notification of Potential Part 21 Transfer of Information Concerning Control Components Inc. (CCI) Drag Valves | Boric Acid |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | |
ML082460801 | 28 August 2008 | Notification of Potential Part 21 on Replacement Diaphragm Failures Due Inadequate Cure and Operation Over Maximum Pressure | |
ML082390106 | 25 August 2008 | Notification of Potential Part 21 on Failure of F and G Switches | Test box |
ML081200882 | 14 April 2008 | Notification of Potential Part 21 on Safety Related Noncompliance Deviation | Coatings |
ML070930381 | 30 March 2007 | Rosemount Nuclear Part 21 - Rosemount Pressure Transmitter May Not Be Seismically Qualified | |
ML071370309 | 7 March 2007 | Velan, Inc., Piston Check Cv Information | |
ML063120160 | 31 October 2006 | Flowserve Corporation, 10 CFR Part 21 Notification | |
ML030550248 | 17 February 2003 | 10CFR Part 21 Notification - Carboline Company | Coatings |
ML021510295 | 15 May 2002 | 10 CFR 21 Notification - Potential Defect Fan Assemblies for UPS Systems | |
ML021550249 | 10 May 2002 | Letter from W. G. Hampton Subject: 10CFR Part 21 Notification-Potenial Defect Involving Fan Assemblies Used in Forced Air Cooled Uninterruptible Power Supply Systems |