Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24103A202 | 9 April 2024 | EN 57068 - Transco Products Inc Part 21 Initial Notification of Unverified Critical Characteristics of Darmatt KM-1 Flat Board | |
ML21181A220 | 29 June 2021 | Part 21 Written Notification - P21-03302021 Rev. 2 - Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters | |
ML21126A172 | 29 April 2021 | Paragon Energy Solutions Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters | |
ML20108F530 | 20 March 2020 | 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0129, Rev. 0, Test Stand Deficiency - EMD Fuel Injectors P/N H40084720 | |
ML19347A426 | 10 December 2019 | General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) | Post Accident Monitoring |
GO2-19-129, Part 21 Notification Re Failure Analysis Concluded That Overvoltage Conditions Caused Overheating and the Subsequent Failures of Starter Coils Contained in Spectrum Technologies Buckets | 3 September 2019 | Part 21 Notification Re Failure Analysis Concluded That Overvoltage Conditions Caused Overheating and the Subsequent Failures of Starter Coils Contained in Spectrum Technologies Buckets | |
ML18078A536 | 31 January 2018 | Crane Nuclear, Inc. - Interim Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem (Update) | |
ML17311A909 | 31 October 2017 | Interim Report for Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem | |
GO2-17-156, Transmittal of 10 CFR 21.21 (d)(4) Notification, GE-Hitachi Relays HMA124A2 | 6 September 2017 | Transmittal of 10 CFR 21.21 (d)(4) Notification, GE-Hitachi Relays HMA124A2 | |
ML17194A825 | 11 July 2017 | Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections | Anchor Darling |
ML17179A378 | 7 June 2017 | TE Connectivity - Part 21 Transfer of Information TE-023 | |
GO2-17-086, 10 CFR Part 21 Notification Regarding Size 1 Freedom Series Starters | 13 April 2017 | 10 CFR Part 21 Notification Regarding Size 1 Freedom Series Starters | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17081A454 | 17 March 2017 | Part 21 Notification - Evaluation of a Deviation - Starter Contactor Failure | Operability Assessment |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML16313A062 | 18 October 2016 | C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries | Commercial Grade |
ML16294A264 | 18 October 2016 | Part 21 Report - Defective Current to Pressure Transducers | |
ML16251A098 | 2 September 2016 | Part 21 - Potential Failure of Battery System Connections | |
ML16188A376 | 21 June 2016 | Part 21 Interim Evaluation of Deviation - Contractor Failure | Commercial Grade |
ML15211A496 | 24 July 2015 | Part 21 - Actuator Shaft Did Not Meet Dimensional Requirements | |
ML14337A094 | 24 November 2014 | Notification of Potential Part 21 - Lack of Proper Power Supply Indication | |
ML14204A707 | 23 July 2014 | Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV | Affidavit |
ML14204A708 | 23 July 2014 | Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) | Safe Shutdown Shutdown Margin Scram Discharge Volume Failure to Scram |
ML14210A010 | 23 July 2014 | Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve | Safe Shutdown Shutdown Margin Scram Discharge Volume Failure to Scram Affidavit |
ML14169A258 | 16 June 2014 | Part 21 - Scram Solenoid Pilot Valve Not Exhausting Properly | |
ML14139A259 | 8 May 2014 | 10 CFR Part 21 Report Notification, NUS710DU Trip Units | |
ML14134A079 | 8 May 2014 | Part 21 - Potential Defect in NUS-710DU Trip Unit to Produce a Valid Trip Output Signal | |
ML14072A328 | 13 March 2014 | Part 21 60-Day Interim Report Notification Re Unseating of Valve Spring on SSPV | Affidavit |
ML14072A326 | 13 March 2014 | Enclosure 2: Description of Evaluation | Shutdown Margin Scram Discharge Volume Failure to Scram |
ML14079A026 | 11 March 2014 | Notification of Part 21 Re Scram Solenoid Pilot Valve Not Exhausting Properly | |
ML14034A190 | 27 January 2014 | Part 21 - Possible Defect in a High Efficiency Particulate Air Filter | |
ML13340A382 | 5 December 2013 | Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters | Affidavit |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13142A329 | 6 May 2013 | Notification of Potential Part 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0109, Rev. 0 | |
ML13127A014 | 3 May 2013 | Part 21 Report - Fuel Injectors Failed Pressure Test | |
ML13064A012 | 25 February 2013 | Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve | Anchor Darling |
ML13042A096 | 8 February 2013 | Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology | Power Uprate |
ML13044A075 | 8 February 2013 | Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology | Power Uprate |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12347A308 | 12 December 2012 | Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology | |
ML12319A012 | 27 September 2012 | Error in Main Steam Line High Flow Calculational Methodology | |
ML12177A056 | 21 June 2012 | Part 21 - Reliability Degradation of Resistors in Trip Units and Readout Assemblies | |
ML12158A447 | 6 June 2012 | Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld | |
ML12040A283 | 7 February 2012 | Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML12038A028 | 2 February 2012 | Failure of CRD Collet Retainer Tube/Outer Tube Weld | |
ML12032A240 | 1 February 2012 | Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld | |
ML11228A084 | 12 August 2011 | Notification of Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference Scram Discharge Volume |
ML112240142 | 11 August 2011 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Channel-control blade interference Scram Discharge Volume |
ML103500174 | 15 December 2010 | Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |