|
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML21181A2202021-06-29029 June 2021 Part 21 Written Notification - P21-03302021 Rev. 2 - Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters ML21126A1722021-04-29029 April 2021 Paragon Energy Solutions Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters ML20108F5302020-03-20020 March 2020 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0129, Rev. 0, Test Stand Deficiency - EMD Fuel Injectors P/N H40084720 ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) GO2-19-129, Part 21 Notification Re Failure Analysis Concluded That Overvoltage Conditions Caused Overheating and the Subsequent Failures of Starter Coils Contained in Spectrum Technologies Buckets2019-09-0303 September 2019 Part 21 Notification Re Failure Analysis Concluded That Overvoltage Conditions Caused Overheating and the Subsequent Failures of Starter Coils Contained in Spectrum Technologies Buckets ML18078A5362018-01-31031 January 2018 Crane Nuclear, Inc. - Interim Report for 10 CFR Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem (Update) ML17311A9092017-10-31031 October 2017 Interim Report for Part 21 Investigation Report Notification of Xomox Plug Valve High Torsional Stress in Stem GO2-17-156, Transmittal of 10 CFR 21.21 (d)(4) Notification, GE-Hitachi Relays HMA124A22017-09-0606 September 2017 Transmittal of 10 CFR 21.21 (d)(4) Notification, GE-Hitachi Relays HMA124A2 ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17179A3782017-06-0707 June 2017 TE Connectivity - Part 21 Transfer of Information TE-023 GO2-17-086, 10 CFR Part 21 Notification Regarding Size 1 Freedom Series Starters2017-04-13013 April 2017 10 CFR Part 21 Notification Regarding Size 1 Freedom Series Starters ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17081A4542017-03-17017 March 2017 Part 21 Notification - Evaluation of a Deviation - Starter Contactor Failure ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16313A0622016-10-18018 October 2016 C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16251A0982016-09-0202 September 2016 Part 21 - Potential Failure of Battery System Connections ML16188A3762016-06-21021 June 2016 Part 21 Interim Evaluation of Deviation - Contractor Failure ML15211A4962015-07-24024 July 2015 Part 21 - Actuator Shaft Did Not Meet Dimensional Requirements ML14337A0942014-11-24024 November 2014 Notification of Potential Part 21 - Lack of Proper Power Supply Indication ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14169A2582014-06-16016 June 2014 Part 21 - Scram Solenoid Pilot Valve Not Exhausting Properly ML14139A2592014-05-0808 May 2014 10 CFR Part 21 Report Notification, NUS710DU Trip Units ML14134A0792014-05-0808 May 2014 Part 21 - Potential Defect in NUS-710DU Trip Unit to Produce a Valid Trip Output Signal ML14072A3282014-03-13013 March 2014 Part 21 60-Day Interim Report Notification Re Unseating of Valve Spring on SSPV ML14072A3262014-03-13013 March 2014 Enclosure 2: Description of Evaluation ML14079A0262014-03-11011 March 2014 Notification of Part 21 Re Scram Solenoid Pilot Valve Not Exhausting Properly ML14034A1902014-01-27027 January 2014 Part 21 - Possible Defect in a High Efficiency Particulate Air Filter ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13142A3292013-05-0606 May 2013 Notification of Potential Part 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0109, Rev. 0 ML13127A0142013-05-0303 May 2013 Part 21 Report - Fuel Injectors Failed Pressure Test ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12177A0562012-06-21021 June 2012 Part 21 - Reliability Degradation of Resistors in Trip Units and Readout Assemblies ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12032A2402012-02-0101 February 2012 Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld ML11228A0842011-08-12012 August 2011 Notification of Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1122401422011-08-11011 August 2011 Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1035100312010-12-15015 December 2010 Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1035001742010-12-15015 December 2010 Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance 2021-06-29
[Table view] |
Text
hh o4104 01/27/2014 U.S. Nuclear Regulatory Commission OperationsCenter Event Report Pane I Part 21 (PAR) Event# 49620 Rep Org: FLANDERS FILTERS Notification Date ITime: 12/10/2013 15:10 (EST)
Supplier: FLANDERS FILTERS Event Date I Time: 11/19/2013 12:00 (EST)
Last Modification: 12/10/2013 Region: 1 Docket #:
City: WASHINGTON Agreement State: Yes County: License #:
State: NC NRC Notified by: JOHN URTON Notifications: STEVE ROSE R2DO HQ Ops Officer: VINCE KLCO GREG WERNER R4DO Emergency Class: NON EMERGENCY PART 21 GROUP EMAIL 10 CFR Section:
21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21 - POSSIBLE DEFECT IN A HIGH EFFICIENCY PARTICULATE AIR FILTER The following information was received by facsimile:
"This serves as notification to the U.S. Nuclear Regulatory Commission (NRC) of a possible deviation or defect in nuclear qualified High Efficiency Particulate Air (HEPA) Filters manufactured by Flanders Filters.
"Flanders Nuclear HEPA Model T-007-W-43-05-NU-51-23-GG-FU5 failed requalification testing at Edgewood Chemical Biological Center (ECBC). This failure was related to the 'Resistance to Pressure' test required per ASME AG-1, Section FC5140.
"On November 19, 2013, Flanders received a report from ECBC indicating failure of this filter model to re-qualify per the requirements of ASME AG-1, Section FC. Flanders is investigating the failure, but at this time do not believe Flanders has the ability to determine if this could create a substantial safety hazard because we do not have specific knowledge regarding the actual application the filters are being used in at each site.
"Customers supplied this model Filter, or filters with the same media type and pack style, since the last qualification of the media type and pack style on July 18, 2012 are being notified.
"In accordance with 10CFR Part 21.21(d)(4), Flanders will provide written notification to the NRC within 30 Days with additional information including corrective actions where applicable."
The customers include the following: SCANA; Nuclear Fuel Service; Premier Technology Incorporated of Blackfoot, Idaho; and Energy Northwest. q'
'7
,1~
hoo4 104 01/27/2014 U.S. Nuclear Regulatory Commission OperationsCenter Event Report Paste 1 Part 21 (PAR) Event # 49620
12/10/2013 14:38 2529465968 FLANDERS PAGE 01/02h FOREMOST IN AIR FILTRATION Fax DATE: 12/9/2013 TO: Operations Center, Nuclear Regulatory Commission FAX: (301) 816-5151 FROM: John Urton FAX: (252) 946-3425 PHONE: (252) 946-8081 Regarding: Part 21 Interim Report Notification Page: I of - (including cover page)
Comments: See attached Interim notification 531 Flanders Filters Road Washington, NC 127889 1252,946.8081 1flanderscorpcom I flandersfilterscom
It-
- AGE 02/02 2529465968 FLANDERS 12/10/2013 14:38 FOREMOST IN AIR FILTRATION Date: 9 December 2013 Notification To! NRC, Operations Center (301) 816-5151 Notification From: John Urton, VP Operations Flanders High Purity Division Notification:
This serves as notification to the U.S. Nuclear Regulatory Commission (NRC) of a possible deviation or defect in nuclear qualified High Efficiency Particulate Air (HEPA) Filters manufactured by Flanders Filters.
Flanders Nuclear HFlPA Model T-007-W-43-05-NU-51-23-GG-FU5 failed requalification testing at Edgewood Chemical Biological Center (ECBC). This failure was related to the "Resistance to Pressure" test required per ASME AG-i Section FCS140.
On November 19th, 2013 Flanders received a report from ECBC indicating failure of this filter model to re-qualify per the requirements of ASME AG-i Section FC. Flanders is investigating the failure, but at this time do not believe Flanders has the ability to determine if this could create a substantial safety hazard because we do not have specific knowledge regarding the actual application the filters are being used in at each site.
Customers supplied this model Filter, or filters with the same media type and pack style, since the last qualification of the media type and pack style on July 18, 2012 are being notified.
In accordance with 10CFR Part 21.21(d)(4) Flanders will provide written notification to the NRC within 30 Days with additional information including corrective actions where applicable.
3d 2 ~/c~0i 531 Flanders Filters Road Washington, NC 127889 1252.946.80811 flanderscorp.corn Ifiandersfiters.com