Issue date | Title | Topic | |
---|---|---|---|
ML23256A088 | 25 September 2023 | Issuance of Alternative to Steam Generator Welds | Hydrostatic Probabilistic Risk Assessment Incorporated by reference Finite Element Analysis |
ML23230A065 | 31 August 2023 | William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code | Incorporated by reference |
ML23159A271 | 20 June 2023 | William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds | Nondestructive Examination VT-2 Incorporated by reference |
ML23151A348 | 30 May 2023 | Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Incorporated by reference |
ML23118A076 | 1 May 2023 | Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 17 February 2023 | Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Weld Overlay Hydrostatic Finite Element Analysis Flow Accelerated Corrosion Stress corrosion cracking |
ML22096A003 | 18 November 2022 | McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations | Aging Management Stress corrosion cracking License Renewal Subsequent License Renewal |
ML22266A078 | 26 September 2022 | William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request | Stroke time Incorporated by reference |
ML22242A160 | 30 August 2022 | Hardship Relief Request Pilot-Operated Relief Valve Acceptance Review Results | |
ML21306A159 | 16 November 2021 | Request to Use Provisions of Later Edition and Addenda of the ASME Code, Section XI (EPID; L-2021-LLR-0048) | Incorporated by reference |
ML21029A335 | 16 February 2021 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | VT-2 Incorporated by reference |
ML20230A205 | 21 August 2020 | Relief Request RA-20-0031, Delay to Update the Code of Record for Inservice Inspection | Nondestructive Examination Incorporated by reference |
ML19217A324 | 14 August 2019 | Relief Request MC-SRV-NC-03, Alternate Testing for Pressurizer Power Operated Relief Valve Block Valve 2NC-35B | Packing leak Operational leakage |
RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) | 11 February 2019 | Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) | |
RA-18-0180, Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 | 12 November 2018 | Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 | Eddy Current Testing |
ML17331A086 | 26 December 2017 | Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads | Stress corrosion cracking Thermal fatigue |
ML17034A362 | 22 February 2017 | Mcguire Nuclear Station, Unit 1 - Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping Relief | Weld Overlay Coatings VT-2 Liquid penetrant Through-Wall Leakage |
ML16358A696 | 17 January 2017 | Proposed Relief Request MC-SRV-NC-02, Alternate Testing for Pressurizer Power Operated Relief Valve (Porv) Block Valve 2NC-31B | Packing leak Stroke time Operational leakage |
ML16266A026 | 18 October 2016 | Proposed Relief Request Serial No. 16-MN-003 for Alternate Repair of Nuclear Service Water Piping | Liquid penetrant Through-Wall Leak |
ML16294A254 | 13 October 2016 | Response to Request for Additional Information Regarding Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping | VT-2 Through-Wall Leak Through-Wall Leakage |
ML16225A654 | 11 August 2016 | Email - McGuire Unit No. 1: Acceptance REVIEW- Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping. | |
MNS-16-062, Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping | 10 August 2016 | Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping | Through Wall Leak |
ML16210A038 | 28 July 2016 | Draft Relief Request Serial No. 16-MN-003 | |
MNS-16-053, Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping | 23 June 2016 | Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping | Weld Overlay Coatings Liquid penetrant Through-Wall Leakage |
ML16152A601 | 8 June 2016 | Withdrawal of Relief Request | |
ML15232A543 | 27 August 2015 | Proposed Relief Request 15-MN-001 | Stress corrosion cracking Through-Wall Leak Dissimilar Metal Weld DM weld |
ML14188C348 | 14 July 2014 | Proposed Relief Request 13-MN-002 | Non-Destructive Examination Internal Flooding Probabilistic Risk Assessment VT-2 Incorporated by reference Flow Accelerated Corrosion Large early release frequency Dissimilar Metal Weld Thermal fatigue |
ML14013A242 | 17 January 2014 | Proposed Relief Request Nos. MC-SRP-KC-01 and MC-SRP-ND-01 (TAC Nos. MF1164, MF1165, MF1166 and MF1167 | |
ML13294A609 | 8 November 2013 | Proposed Relief Request 12-MN-004 (TAC Nos. MF0508, MF0514, and MF0515) | VT-2 Pressure Boundary Leakage Unidentified leakage Operational leakage |
ML13010A554 | 14 January 2013 | Proposed Relief Request 12-MN-002 | VT-2 Incorporated by reference Thermal fatigue |
ML12355A149 | 29 November 2012 | Relief Request Serial # 12-MN-004 Limited Weld Examinations | VT-2 |
ML12264A338 | 24 September 2012 | Correction Letter for Approval Letter and Safety Evaluation for Relief Request 11-MN-002 Regarding the Extension of the Inservice Inspection Interval for Reactor Vessel Category B-A and B-D Welds | |
ML12123A112 | 9 May 2012 | Request for Relief 12-MN-001, Relief Request for a Alternative Depth Sizing Criteria | |
ML11160A144 | 23 June 2011 | Relief 10-MN-002, Extension of Volumetric Inspection of Steam Generator Primary Manway Studs for One Operating Cycle Beyond the Third 10-Year Inservice Inspection Interval End Date | VT-2 Incorporated by reference Eddy Current Testing |
ML101580422 | 14 June 2010 | Relief 09-MN-005 for Alternative Leakage Testing for Various American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Class 1 Piping and Components During the Third 10-Year Inservice | Hydrostatic VT-2 Incorporated by reference Stress corrosion cracking Pressure boundary leak Through-Wall Leakage Thermal fatigue |
ML100620018 | 4 March 2010 | Relief 09-MN-007 for Reactor Vessel Core Flood Nozzle Weld Examinations During the Third 10-Year Inservice Inspection | Incorporated by reference Dissimilar Metal Weld |
ML091140066 | 13 May 2009 | Request for Relief 08-MN-003 for Reactor Vessel Hot Leg Nozzle to Safe End and Safe-End to Pipe Welds Examinations, TAC MD9614 | Incorporated by reference Dissimilar Metal Weld |
ML092170658 | 4 May 2009 | Submittal of Relief Request Serial No. 09-MN-002 | Weld Overlay Coatings Nondestructive Examination Through-Wall Leakage |
ML081490471 | 16 May 2008 | Relief Request 08-MN-001 | VT-2 |
ML071560416 | 8 June 2007 | Withdrawal of Relief Requests Associated with Pump Vibration (MD3253 Through MD3290) | |
ML071210249 | 19 April 2007 | Relief Request 07-GO-0001. Proposed Alternative Approach Supports Application of Full Structural Weld Overlays on Various Pressurizer Nozzle-to-Safe End Welds | Weld Overlay Dissimilar Metal Weld |
ML062620261 | 11 September 2006 | Relief Request 06-GO-001 Request for Additional Information | Weld Overlay Stress corrosion cracking Dissimilar Metal Weld |
ML061530387 | 16 August 2006 | Request for Relief 05-MN-01, for Third 10-Year Interval Inservice Inspection Program Plan | Nondestructive Examination Incorporated by reference Unidentified leakage |
ML063490399 | 27 July 2006 | Relief Request 06-GO-001 | Non-Destructive Examination Weld Overlay Hydrostatic Nondestructive Examination Stress corrosion cracking Liquid penetrant Dissimilar Metal Weld |
ML052450257 | 6 September 2005 | Relief Requests for Third 10-Year Pump & Valve Inservice Testing Program | Temporary Modification Scaffolding |
ML051460179 | 23 May 2005 | Request for Relief, ISI Request for 04-MN-02, 04-MN-03 and 04-MN-04 | Incorporated by reference Stress corrosion cracking Liquid penetrant Thermal fatigue |
ML050610566 | 18 March 2005 | Review of RR-03-05, Pressurizer Support Skirt Welds | High Radiation Area Incorporated by reference |
ML050670467 | 24 February 2005 | Inservice Testing Program Relief Request MC-SRP-NS-01, Request for Additional Information (RAI) | Temporary Modification Thermography |
ML043440072 | 2 December 2004 | Supplement to Relief Request No. 01-003 | VT-2 |
ML043060231 | 17 November 2004 | Relief Request, Use of a Later Edition of the ASME Section XI Code for the Remainder of the Third 10-year Inspection Interval RR-03-001. TAC No MC2767 | Incorporated by reference |